March 2015 Quarterly Report & Appendix 5B
Released
Released
Announcement PDF
STRIKE ENERGY LIMITED
QUARTERLY REPORT
For the period ending 31 March 2015
Strike Energy Limited - Quarterly Report: September 2014
March Quarter Performance Summary
Key Achievements
Australia
Increasing gas flows measured from both Klebb 1 and Le Chiffre 1.
Commencement of multi-well flow testing at Klebb.
Southern Cooper
Basin Gas Project
Pressure reduction at Klebb and Le Chiffre locations confirmed.
First contingent resource estimate independently certified by leading international petroleum consultants
DeGolyer and MacNaughton as announced on 27 April 2015.
Oil price weakness and reduced exploration activity contributing to improving cost environment.
Cash of $5.8 million on hand at the end of the quarter – fully funded to meet current flow testing program
commitments.
Strong
Funding Position
Notifications under the respective Orica and Orora GSA’s and Orica Option Deed dispatched on 27 April 2015.
R&D funding facility limit increased to $5.9 million with $5.1 million drawn as at the end of the quarter. The
repayment of this facility will be made from 2015 ATO R&D refund.
Continued interest in additional gas offtake.
USA
Operations
US asset portfolio continues to generate positive net operating cash flows even in current energy price
environment.
No further US investment planned in the near term.
Strike Energy Limited - Quarterly Report: March 2015
1
Managing Director’s Comments
I am pleased to report on another successful quarter, which has built on the
achievements of the previous periods, with continued flow testing achieving
increasing gas flows at the Southern Cooper Basin Gas Project (SCBGP), accelerating
the commercialisation of the project.
RESOURCE
•
Presence of extensive, very thick coals hosting a multi-Tcf gas resource.
•
The bulk of the resource is situated at depths between 1,400m and 2,000m
and the Company has demonstrated low drilling costs with costs falling further.
Extended flow testing at the Klebb and Le Chiffre well locations within the SCBGP
continued with the objectives of building gas flow rates, improving our understanding
of the key reservoir parameters and refining our well and field operating procedures.
•
Flow testing has demonstrated permeability and high productivity from both
unstimulated and fracture stimulated zones.
•
The coals exhibit low stress and fracture stimulation has been highly effective.
The results of this testing program have been extremely encouraging. We have
established sustained gas flows from the wells, confirmed high gas saturations
and analysis of reservoir pressure data indicates that sustained reservoir pressure
reduction has been achieved, with no evidence of aquifer recharge. Gas flow
increases as reservoir pressure reduces and our goal is to continue flow testing to
achieve reservoir pressures sufficient for commercial gas flows.
•
Gas flows from the wells have been observed and measured from the
commencement of flow testing with rates increasing with reduction in reservoir
pressure.
•
No evidence of aquifer recharge has been observed to date.
•
The independent review of the project by DeGolyer and MacNaughton
has confirmed that the project has 2C contingent resources in excess of the
threshold economic field size – once commercial gas flow rates from the existing
wells are achieved there is sufficient gas to support a commercial development.
Subsequent to the end of the quarter, the Company announced the certification
of its first Contingent Gas Resource by leading international petroleum consultants
DeGolyer and MacNaughton.
Planning and conceptual design work has commenced for a demonstration gas
processing facility that will be designed to produce sales gas. The deployment of a
modular, demonstration processing and compression facility will provide invaluable
information to support the development of a commercial scale project within PEL
96 that will deliver gas through existing pipeline networks into the innovative offtake
agreements already in place with Orica, Orora and Brickworks.
At quarter end, the Company reported cash on hand of $5.8 million. During the
period our R&D funding facility limit was increased to $5.9 million which will be
repaid in full with the proceeds to be received from our 2015 ATO R&D refund in
November 2015.
At this stage, it is worth reflecting on the progress which has been made to date on
the SCBGP across the key resource, infrastructure and market areas which underpin
a commercial project.
Strike Energy Limited - Quarterly Report: March 2015
INFRASTRUCTURE AND MARKET
•
The project is located with direct access to the Moomba to Adelaide Pipeline.
This pipeline is currently being modified to facilitate northerly gas flow.
•
Preliminary work on a demonstration, modular gas processing and
compression facility indicates that a commercial development is feasible for
anticipated pilot production volumes.
•
The Company has entered into innovative gas offtake agreements which are
designed to support rapid commercial development.
The reservoir and flow data we have obtained to date clearly shows that we are
making steady progress towards commercial gas rates. Our forward program is
specifically designed to achieve this result from our portfolio of wells.
We are confident that this final hurdle will be achieved in the near term.
2
Southern Cooper Basin Gas Project: Strike’s Strategic Objective
Strategic objectives
Timing
Supply targets
2020/21
Production
FID
Cost competitive third
party gas supply for
LNG exporters
Development
~5 Tcf over 20 years
Equivalent to gas supply
for one LNG train
Expanded resource delineation
across STX acreage
2017/18
Production
New source of
affordable gas supply
for east coast domestic
customers
~1 Tcf over 20 years
FID
Initial development
Equivalent to 35%
of NSW gas supply
Current
PEL 96
Appraisal/
Commercialisation
Strike is positioning the Southern Cooper Gas Project as a long-life resource for domestic and export gas supply
Strike Energy Limited - Quarterly Report: March 2015
3
Southern Cooper Basin Gas Project: Quarterly Achievements
Field operations at PEL 96 (STX 66.667%, EWC 33.333%) during the quarter were
focused on consistent flow testing and building on the early results observed in
the prior quarter. Flooding in the Cooper Basin interrupted flow testing operations
for much of January, however, the resulting pressure build-up data has provided
valuable information both on the progress of reducing reservoir pressure and the
potential drainage volume of each of the Le Chiffre 1 and Klebb 1 wells. Importantly,
no indication of aquifer recharge has been observed to date.
Commissioning of the Klebb 3 surface equipment was completed during the quarter
and testing of the well commenced.
Cost reduction has been a parallel focus during this phase of testing. Through the
period, we have achieved a managed reduction in manning and rental equipment
on-site without impeding the acquisition of quality data or impacting on our HSE
quality standards.
At the end of the quarter, all four PEL 96 wells had been under test. The PEL 94
Davenport 1 well (STX 35%, BPT 50% and Operator, SXY 15%) was awaiting final
regulatory approvals and workover to commence extended flow testing.
During the quarter, Strike engaged DeGolyer and MacNaughton to independently
review the PEL 96 project focusing on the flow test data acquired. Following the end
of the quarter, an initial Contingent Resource assessment was completed for areas
around the Le Chiffre 1 and Klebb 1 wells.
Le Chiffre Flow Testing
Pumping operations at Le Chiffre 1 were commenced on 8 November 2014. Gas to
surface was recorded almost immediately at Le Chiffre 1, with gas measured and
flared consistently throughout the quarter.
Reservoir pressure build-up data gathered as a result of the weather related shut-in
during January 2015 indicates that the well is connected to relatively large reservoir
volume. This larger drainage area means that fewer wells will be required to develop
the resource leading to higher per well ultimate gas recovery - a positive indication
for development. However, offset pilot wells will be required to reduce the period
to establish commercial flow rates from the well.
Klebb Flow Testing
Pumping operations at Klebb 1 commenced on 31 October 2014 and a cumulative
four months of flow test data and 26,000 bbls of water had been produced from the
well at the end of the quarter. Gas has continued to be measured and flared from
Klebb 1 during the quarter.
Bottom-hole pressure data confirms that modifications to well start-up and rampup procedures is realising significant performance improvements. Productivity of
the well has continued to increase during April with daily rates consistently above
previous peak rates. Pressure build-up data acquired during the period also confirms
that sustained average reservoir pressure reduction has been achieved.
The unstimulated Klebb 2 well was flow tested intermittently during the period due
to surface pump limitations. Pressure data gathered at quarter end indicated that
pressure communication with Klebb 1 had not yet been established.
Klebb 3 productivity has been pleasing, with maximum water flow in excess of
180 bbls/d being achieved during the quarter with further improvement observed
during April. Results from Klebb 3 confirm that while unstimulated wells are
productive, fracture stimulation will be very effective in accelerating production
towards commercial flow rates in the Klebb area.
Performance of the Le Chiffre 1 well has continued strongly and step rate testing
during February suggests that the large fracture stimulation has resulted in a
well which is less sensitive to increases in pump rate. At the end of the current
quarter a cumulative 72,000 bbls of water had been produced since testing began
in November.
Strike Energy Limited - Quarterly Report: March 2015
4
Southern Cooper Basin Gas Project: Planned Future Activities
June Quarter Planned Activities
The PEL 96 flow test continues to progress toward achieving commercial gas flow
rates from the field and these activities will be focused on the Klebb location,
where the Company has three active wells.
Diagnostic injection tests will be carried out on the Klebb 2 and Klebb 3 wells.
These tests will provide information for future fracture stimulation design. The
tests themselves may also provide a near term performance benefit, particularly
for Klebb 2.
It is planned to workover Klebb 1 to install a conventional beam-pump. This is
expected to allow lower flowing pressures to be realised from the well and allow
greater independent control of Klebb 2 and Klebb 3 with the existing surface
equipment.
The Le Chiffre 1 well will be shut-in for an extended pressure build-up test to refine
our estimate of the reservoir volume connected to the well.
Strike Energy Limited - Quarterly Report: March 2015
5
Southern Cooper Basin Gas Project: PEL 96 Commercialisation Strategy
Objective
Infill wells
Increased
reserves and
resources
Funding (2) (3)
Commence Q4 2015
Objective
Phase 4
Le Chiffre pilot wells + testing
Continue Klebb pilot production
Pre-development activities
Commence Q3 2015
Funding (2)
Klebb pilot test
Phase 3
Frac Klebb 2 & 3
Install new pumps at Klebb 2 & 3
Commence Q1 2015
Funded (1)
Continue testing Le Chiffre 1 and Klebb 1-3
Install new pump at Klebb 1
Understand multi-well pressure drawdown
effects
Phase 2
Funded (1)
Phase 1
Dec 2014
Single well tests
Le Chiffre 1 and Klebb 1
Drill & complete Klebb
2&3
Demonstration
project
Objective
Commercial
gas flows
Initial reserves
Objective
Build gas flows
(in progress)
Objective
Sustained gas flows
Technical feasibility
Commercial feasibility
(1) Funded from existing cash resources
(2) Funding from gas off-take prepayments and Company’s existing R&D rebate / funding program
(3) Activities will be refined based on outcomes of Phase 2 planned activity
A disciplined, capital efficient and funded appraisal program is being followed to establish commerciality
Strike Energy Limited - Quarterly Report: March 2015
6
Southern Cooper Basin Gas Project: PEL 96 Production Testing Program
~8km
Klebb 3
Klebb 1
~200m SW
PEL 96
Weena
trough
•
Klebb 2
~200m NE
Le Chiffre 1
Depth 1,930m
Depth 1,830m
Vm3
Vm3
Vm3
Vm3
Vu Upper
Vu Upper
Vu Upper
Perf.
No frac
net 35m
Vu Upper
Perf.
No frac
net 35m
460 bbl
frac
net 35m
Net 50m
Vu Lower
Vu Lower
Vu Lower
5,000 bbl
frac
1,400 bbl
frac
Vu Lower
Completed drilling
Strike Energy Limited - Quarterly Report: March 2015
7
Southern Cooper Basin Gas Project: Contingent Resource Estimate
During the period, DeGolyer and MacNaughton, a leading international petroleum
industry consulting firm, commenced an Independent Review of the Southern
Cooper Basin Gas Project. The Independent Review, released on 27 April 2015,
confirmed that the Project is progressing towards commercialisation based on
analysis of the results of the Company’s work program including recent flow test
data. In addition, the review achieved gas prepayment milestones under the
Company’s Gas Sales Agreements with Orica and Orora.
As outlined in the Company’s ASX announcement of 27 April 2015, for the contingent
resources to be classified as reserves, establishment of sustained commercial gas
flow rates from the Patchawarra Vu coals will be required to better define gas
and water production rates and volumes, the drainage pattern and well spacing.
Additional drilling will also be required to confirm the reservoir quality and gas
content of the coals outside the existing contingent resource areas in order to grow
and upgrade the resource to reserves.
Contingent Resources were assessed in limited areas around the Le Chiffre and
Klebb wells only for the zones flow tested to date, the 35m thick Patchawarra Vu
Upper in Klebb 1 well and the 35m Vu Upper and 15m Vu Lower in Le Chiffre 1.
These intervals represent only a portion of the net coal intersected by each well.
The assessment also provides a reduction in the geologic risk associated with areas
of the existing multi-Tcf Prospective Resource which have not yet been drilled or
flow tested.
The Company’s existing conditional gas off-take arrangements, demonstrated low
well costs and proximity to the Moomba to Adelaide Gas Pipeline already satisfy a
range of other typical contingencies.
Contingent Gas Resource Estimates - PEL 961
Well
1C2
(Bcf)
2C2
(Bcf)
3C2
(Bcf)
Productive area (acres)
2,171
2,938
3,931
Le Chiffre 1 - Patchawarra Vu Upper and Vu Lower zones
62.9
93.2
132.4
Klebb 1 - Patchawarra Vu Upper zone
42.1
62.2
93.3
Total Gross Contingent Resource
105.0
155.4
225.7
Total Net Contingent Resource
70.0
103.6
150.5
1
Contingent Resource Estimates have been prepared in accordance with the Petroleum Resources Management System “PRMS”. Contingent Resource
Estimates are those quantities of gas (produced gas less carbon dioxide and fuel gas) that are recoverable from known accumulations but which are not
yet considered commercially recoverable.
2
1C, 2C and 3C estimates in this table are P90, P50 and P10 respectively for each well and have been summed arithmetically.
3
Net to Strike’s 66.7% interest in PEL 96.
Strike Energy Limited - Quarterly Report: March 2015
8
US Operations: Production and Operations Update
US Exploration and Evaluation Activities
The Company continues to hold its interest in the Permian Basin (STX Interest 25%)
and the Eagle Ford Shale and Eagle Landing Joint Ventures (STX Interest 27.5%) with
minimum exploration and development activity occurring during the quarter.
The Company has no planned new investments planned in these projects in the
near term.
US Production
Strike currently produces oil and gas from three independent assets. Total oil
production for the quarter was 4,666 bbls up 4% on the prior quarter and gas
production was 75,144 Mcf down 8% on the prior quarter.
The Eaglewood Joint Venture (Strike 40% WI) produced 71,736 Mcf of gas and 1,306
bbls of oil net to Strike during the quarter, down 8% for gas and down 14% for oil on
the previous quarter.
The MB Clearfork Project (Strike 25% WI) produces oil from 20 conventional Permian
Basin wells in Martin County, Texas. During the quarter, the MB Clearfork Project
produced 2,392 Mcf of gas and 2,669 bbls of oil net to Strike, down 14% for gas and
up 23% for oil from the previous quarter.
The Eagle Ford shale project (Strike 27.5% WI) produces oil and gas from the Bigham
1H well in Fayette County, Texas. The well produced 1,016 Mcf of gas and 691 bbls
of oil net to Strike during the quarter, down 28% for gas and down 15% for oil on
the previous quarter. The decrease in production for the quarter is as a result of the
well’s normal expected decline.
MAR QTR 2015
DEC QTR 2014
QUARTERLY
CHANGE
EAGLEWOOD JV – CYPRESS RAVEN (WILCOX)
Gas (Mcf)
71,736
77,749
-8%
Oil (Bbl)
1,306
1,522
-14%
Total Revenue (USD’000)
264
426
-38%
PERMIAN BASIN – MB CLEARFORK PROJECT
Gas (Mcf)
2,392
2,787
-14%
Oil (Bbl)
2,669
2,170
23%
Total Revenue (USD’000)
138
173
-20%
Gas (Mcf)
1,016
1,404
-28%
Oil (Bbl)
691
812
-15%
Total Revenue (USD’000)
34
62
-45%
Gas (Mcf)
75,144
81,940
-8%
Oil (Bbl)
4,666
4,504
4%
Total Revenue (USD’000)
436
661
-34%
Total Revenue (AUD’000)
571
774
-26%
EAGLE FORD SHALE – BIGHAM 1H
TOTAL
Based on industry convention energy equivalence 6 Mcf of gas = 1 Bbl of oil
Average realised prices during the quarter were US$46.72/Bbl, down 35% from
US$72.38/Bbl in the previous quarter for oil and US$2.90/Mcf, down 29% from
US$4.09/Mcf for gas in the previous quarter.
Strike Energy Limited - Quarterly Report: March 2015
9
Finance, Commercial and Corporate Update
Corporate Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
E: strike@strikeenergy.com.au
W: www.strikeenergy.com.au
Key highlights include:
•
Registered Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
Securities Exchange
ASX : STX
•
Securities on Issue
Shares: 833,330,946
Options: 11,700,001
Performance Rights: 28,800,000
Analyst Coverage
Firm
Euroz
Ord Minnett
Bell Potter
RBC Capital
modular gas processing facility that will be designed to
process, compress and deliver sales gas produced from the
multi well testing program into the Moomba to Adelaide
pipeline. Discussions to date continue to yield significant
interest and support from engineering groups and a number
of equipment suppliers.
During the March quarter the Company continued to advance a
number of its financial and commercial initiatives in support of the
appraisal and accelerated development and commercialisation
of the SCBGP.
Analyst
Michael Skinner
John Young
Peter Arden
Andrew Williams
•
As outlined in the Company’s ASX announcement dated 27
April 2015, following the completion of the Independent
Review by DeGolyer and MacNaughton, the notice for the
final tranche of prepayment funding under the terms of the
45PJ Orora Gas Sales Agreement was issued. Separately,
following completion of this review, the notification that
marks the commencement of the 30 day period for Orica to
elect to make its first gas prepayment under their 250PJ Gas
Sales Agreement was issued.
Following the completion of the Independent Review, the
Company also issued the required notification under the
terms of the Orica Option. Under the terms of the Orica
Option (as approved by Shareholders at a General Meeting
of the Company on 28 May 2014) Orica is able to subscribe
to new shares in the Company for a payment of $2.5million.
The number of new shares to be issued by the Company is to
be no more 20,833,333 shares and will be determined with
reference to a price that is the higher of the 10% discount to
the 10 day VWAP prior to the exercise date or 12 cents per
share. If Orica does not exercise this Option within 30 days,
the Option will lapse.
The Company continues to advance its planning for surface
infrastructure to support an initial development project
within PEL 96. During the quarter work has continued to
scope and assess the feasibility of a demonstration scale
Strike Energy Limited - Quarterly Report: March 2015
•
Discussions with commercial and industrial gas users
regarding further offtake are on-going. These discussions
continue as part of the Company’s strategic planning
initiatives and in response to the successful achievement of
all of the key objectives for the current appraisal program at
the Klebb and Le Chiffre well locations.
•
The Company entered into an amendment to the previously
announced R&D Financing facility with Macquarie Bank
(the Macquarie Facility). Under the terms of the revised
Macquarie Facility, the facility limit has been increased to
$5.9M, with the other facility terms remaining unchanged.
The Macquarie Facility is collateralised by the proceeds of
the Company’s 2015 ATO R&D refund which is expected to
be received by November 2015 at which time the facility will
be repaid in full. An initial draw down of $4.0 million was
made on 29 January 2015 with a second draw down of $1.1
million being made on 20 March 2015.
•
The Company completed the quarter with $5.8 million cash
on hand and together with the additional proceeds from the
various arrangements with the Company’s off takers and
funding available under the Macquarie Facility, the Company
is well placed to continue its’ field operations towards the
commercialisation of its’ Southern Cooper Basin Gas Project.
10
Important Notice
This presentation does not constitute an offer, invitation or recommendation
to subscribe for, or purchase any security and neither this presentation nor
anything contained in it shall form the basis of any contract or commitment.
Competent Persons Statement
Reliance should not be placed on the information or opinions contained in this
presentation. This presentation does not take into consideration the investment
objectives, financial situation or particular needs of any particular investor. Any
decision to purchase or subscribe for any shares in Strike Energy Limited should only be
made after making independent enquiries and seeking appropriate financial advice.
The information in this presentation that relates to the PEL 96 contingent
resources estimate has been taken from the independent reports as prepared by
DeGolyer and MacNaughton, a leading independent international petroleum
industry consultancy firm, and has been reviewed by Mr Chris Thompson
(Chief Operating Officer of the Company). All other reported resource and or
reserves information in this presentation is based on, and fairly represents,
information prepared by, or under the supervision of Mr Thompson.
No representation or warranty, express or implied, is made as to the fairness,
accuracy, completeness or correctness of the information, opinions and conclusions
contained in this presentation. To the maximum extent permitted by law, Strike Energy
Limited and its affiliates and related bodies corporate, and their respective officers,
directors, employees and agents disclaim liability (including without limitation,
any liability arising from fault or negligence) for any loss arising from any use of or
reliance on this presentation or its contents or otherwise arising in connection with it.
Mr Thompson holds a Graduate Diploma in Reservoir Evaluation and Management
and Bachelor of Science Degree in Geology. He is a member of the Society of
Petroleum Engineers and has worked in the petroleum industry as a practicing
reservoir engineer for over 20 years. Mr Thompson is a qualified petroleum
reserves and resources evaluator within the meaning of the ASX Listing Rules
and consents to the inclusion in this release of the resource and or reserves
information in the form and context in which that information is presented.
Statements contained in this presentation, including but not limited to those
regarding the possible or assumed future costs, performance, dividends,
returns, production levels or rates, oil and gas prices, reserves, potential
growth of Strike Energy Limited, industry growth or other projections and
any estimated company earnings are or may be forward looking statements.
About DeGolyer and MacNaughton
Such statements relate to future events and expectations and as such involve
known and unknown risk and uncertainties, many of which are outside the control
of Strike Energy Limited. Actual results, actions and developments may differ
materially from those expressed or implied by the statements in this presentation.
Subject to any continuing obligations under applicable law and the Listing Rules of
ASX Limited, Strike Energy Limited does not undertake any obligation to publicly
update or revise any of the forward looking statements in this presentation or any
changes in events, conditions or circumstances on which any such statement is based.
Strike Energy Limited - Quarterly Report: March 2015
The information contained in this release pertaining to the PEL 96 contingent resources
estimate is based on, and fairly represents, information prepared under the supervision
of Mr Paul Szatkowski, Senior Vice President of DeGolyer and MacNaughton. Mr
Szatkowski holds a Bachelor of Science degree in Petroleum Engineering from Texas
A&M, has in excess of 40 years of relevant experience in the estimation of reserves
and contingent resources, and is a member of the International Society of Petroleum
Engineers and the American Association of Petroleum Geologists. Mr Szatkowski is
a qualified petroleum reserves and resources evaluator within the meaning of the
ASX Listing Rules and consents to the inclusion of the contingent resource estimate
related information in the form and context in which that information is presented.
11
Southern Cooper Basin Gas Project: Project Overview
Prospective
Resource
PEL 96
4,492 Bcf*
PEL 96 Phase
One Area
1,123Bcf*
2C
Contingent
Resource*
Moomba
104 Bcf
Marsden 1
Davenport 1
PEL 94
STX 35%
PEL 95
STX 50%
Mount Isa
Le Chiffre 1
Klebb production
testing area
Gladstone
Moomba
PELA 640
STX 100%
Brisbane
PEL 96
STX 66.67%
0
20
Sydney
Adelaide
Kilometers
Melbourne
PEL 96 Phase One Area
Strike Phase One Area wells drilled
Gas Pipeline
Strike Wells Drilled
Oil Pipeline
Strzelecki Track
PEL 96 Offset Wells
PEL 96 and PELA 640 – STX operated
Hobart
PEL
Net STX Acres
PEL 94
77,925
PEL 95
160,248
PEL 96
443,880
PELA 640
850,786
Total
1,532,839
* Mean estimate (net to Strike) per ASX announcement dated 19 Feb 2014 and adjusted for announced contingent resource estimate per ASX announcement dated 27 April 2015.
Strike has ideally positioned multi-Tcf resource to supply into Eastern Australian gas demand
Strike Energy Limited - Quarterly Report: March 2015
12
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
STRIKE ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
59 078 012 745
31 March 2015
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
Receipts from product sales and related debtors
Payments for (a) exploration & evaluation
(b) development
(c) production (1)
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (2)
691
(6,638)
(11)
(541)
(885)
‐
‐
‐
‐
‐
476
3,046
(18,241)
(71)
(2,099)
(2,824)
‐
‐
‐
‐
‐
6,506
Net operating cash flows
(6,908)
(13,683)
‐
‐
‐
‐
‐
(4)
‐
‐
‐
‐
‐
‐
5,032
‐
‐
‐
‐
‐
‐
5,028
(6,908)
(8,655)
Cash flows related to operating activities
1.1
1.2
1.3
1.4
1.5
1.6
1.7
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects (3)
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
(1) Production payments include prepayments made for gas transmission rights for the Groups US assets.
(2) Other for YTD includes the receipt of $ 5.8 million from the ATO relating to the FY14 R&D return.
(3) As announced on 11 July 2014 the Group entered into a Purchase and Sale Agreement with Penn Virginia Oil & Gas to sell 1,617 of its net
acres in Lavaca County Texas (USA). Proceeds of US$ 4.6 million were initially received on 29 August 2014 with a second completion
payment being received on 7 November 2014.
+ See chapter 19 for defined terms.
17/12/2010
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(6,908)
(8,655)
Proceeds from issues of shares, options (net of costs)
Proceeds from sale of forfeited shares
Proceeds from borrowings (2)
Repayment of borrowings
Dividends paid
Other:
a. Interest and other cost of financing paid
b. Interest & other items of a similar nature
received
‐
‐
5,072
(172)
‐
‐
‐
5,072
(788)
‐
(382)
48
(723)
176
Net financing cash flows
4,566
3,737
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Net decrease in cash held
(2,342)
(4,918)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
8,141
10
10,624
103
1.22
Cash at end of quarter
5,809
5,809
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2 (a)
1.24
Aggregate amount of loans to the parties