A Strategic Energy and Industrial Precinct
The Precinct is Strike Energy's approximately 3,500-hectare freehold landholding in the northern Perth Basin, providing a strategic platform for the Company's existing energy infrastructure and potential future energy and industrial development.
It Offers:
Strategic Landholding
Approximately 3,500 hectares of freehold land providing flexibility for future energy and industrial development.
Energy Infrastructure
Home to the South Erregulla Peaking Power Plant, with access to gas supply and connection to Western Australia's electricity network.
Development Optionality
Potential to accommodate complementary industrial, data infrastructure and renewable energy developments over time.
Project Overview
Landholding
~3,500 hectares freehold
Ownership
100% Strike
Location
Northern Perth Basin, Mid West WA
Energy Infrastructure
South Erregulla Peaking Power Plant
Grid Connection
South West Interconnected System (SWIS)
Development Potential
Energy, industrial, data and renewable
Precinct Status
The South Erregulla Peaking Power Plant is the first major energy development at the Precinct, with further opportunities to be assessed.
Future development opportunities described are potential only and remain subject to further assessment, approvals, commercial arrangements and investment decisions.
About
Home to the South Erregulla Peaking Power Plant, The Precinct brings together access to natural gas, electricity infrastructure and substantial land within a single location.
This combination creates the potential to accommodate future energy-intensive industry, data and AI infrastructure, renewable generation and other co-located developments that can benefit from proximity to energy supply and infrastructure.
An Integrated Energy Location
The Precinct sits at the centre of Strike's northern Perth Basin operations and provides a unique combination of land and energy infrastructure.
The South Erregulla Peaking Power Plant establishes major electricity infrastructure within the landholding, while Strike's surrounding gas resources provide access to locally sourced energy.
Together, these attributes provide a foundation from which Strike can assess additional uses for the site and opportunities to leverage infrastructure already established as part of the South Erregulla development.
Potential Future Opportunities
Building on South Erregulla
The South Erregulla Peaking Power Plant represents the first major energy development within The Precinct. Its development establishes gas gathering, power generation and electricity transmission infrastructure across the site, creating a foundation from which additional opportunities within the broader landholding can be assessed.
As Western Australia's electricity demand grows and new sources of industrial demand emerge, The Precinct provides Strike with strategic optionality to participate in the State's evolving energy landscape.
Data & AI Infrastructure
The rapid growth of artificial intelligence and cloud computing is driving increasing demand for large-scale data infrastructure and the reliable electricity required to support it.
The Precinct's combination of substantial land, access to gas-fired generation and connection to the electricity network provides attributes that may support future data centre or other high-load infrastructure developments.
Co-located Industry
Access to land and energy infrastructure creates the potential for industrial users to locate alongside Strike's existing operations.
Co-location may provide opportunities for energy-intensive industries seeking access to reliable power, available land and shared infrastructure within an established energy precinct.
Renewable Energy
The scale of The Precinct provides potential for future renewable generation, including solar and wind. Co-locating renewable generation with flexible gas-fired generation and electricity infrastructure could create opportunities for complementary energy developments capable of supplying both the grid and future industrial users.
The wind resource available for capture at The Precinct is material, with The Precinct sitting on the first ridge line inland from the Mid West coast, elevated ~300 m over a ~30 km distance from the shore. This ridge line in the Mid West has a prolific wind resource and is host to four of the top ten most productive wind farms in Australia, including Yandin, Badgingarra, Mumbida and Emu Downs.
Strike's desktop analysis shows that The Precinct could host up to 100 MW of wind resources with an estimated capacity factor between 40–50% and, subject to land allocation, a further 70 MW of solar resource.
Carbon Storage Opportunity
The Jurassic Sandstones within the Cattamarra Coal Measures were assessed to be a very high-quality reservoir.
A 103 metre clean, net sandstone reservoir with an average porosity of 19% (up to 23%) was measured between 2,096 m MD and 2,297 m MD. This non-hydrocarbon bearing reservoir has many of the characteristics of a suitable location for the storage of captured carbon.