A Foundation Asset


Walyering is Strike's low-cost, fast to market, maiden gas project that transformed Strike from explorer to producer. It is:


Low Cost

Existing infrastructure and operating history.

Cash Generating

Funding future growth projects.

Growth Platform

Nearby discoveries can leverage existing infrastructure.

Project Overview

First Gas

September 2023

Ownership

100% Strike

Processing Capacity

33 TJ/day

Infrastructure

Gas processing plant + export pipeline

Market

WA Domestic Gas via the Parmelia Gas Pipeline

Location

~150 km north of Perth, Mid West WA

Asset Status

Online - Producing

Producing gas asset supplying WA homes and businesses with domestic gas while generating strong operating cash flow. Three wells operating (Walyering 5, 6, 7) since 2023.

Operational details are indicative and subject to field performance, contract terms and market conditions.

About

The Walyering gas field sits in Production Licence L23 and is surrounded by Exploration Licence EP 447 which are operated and owned 100% by Strike Energy. The field is situated approximately 150 km north of Perth near the town of Cataby in the Mid West.

Resources & Reserves


In August 2026, the annual review of the Reserves and Resources at the Walyering gas field was completed, including the discovered Walyering West, resulting in a 2P Reserves Upgrade.

The Reserves and Contingent Resources for Walyering as of July 2026 are illustrated in the table below.



Walyering Net Reserves & Resources (100% net to Strike)
1P 2P 3P 1C 2C 3C
RISC 2025
Sales Gas (PJ) 11.213.620.6 13.416.720.6
Condensate (MMstb) 0.070.090.15 0.10.10.2
Less Sales Gas Production (PJ) -5.7-5.7-5.7 –––
Less Condensate Production (MMstb) -0.03-0.03-0.03 –––
Additions:
Sales Gas (PJ) 0.78.717.2 3.710.025.7
Condensate (MMstb) 0.010.080.19 –0.10.2
Revisions:
Sales Gas (PJ) -0.1-0.2-2.5
Condensate (MMstb) ––-0.07
RISC 2026
Sales Gas (PJ) 6.116.429.6 17.026.546.3
Condensate (MMstb) 0.050.140.24 0.10.20.4

History


1971

Walyering 1 discovered 40m of low-quality net pay over the Jurassic Cadda and Cattamarra Coal Measures, flowing at ~8 MMscf/day. Walyering 2 and 3 drilled shortly after found tight gas with marginal flow rates and were abandoned. The field produced ~0.3 Bcf through Walyering 1 before being shut in.

2019

Strike acquired the acreage through its acquisition of UIL Energy Limited and shot 90 km² of 3D seismic over the Walyering structure.

2021/22

Interpretation showed the original wells had not been optimally located. Strike drilled Walyering 5 and 6, both successful across several intervals, flowing at 78 MMscf/day and 35 MMscf/day respectively.

2022

Strike sanctioned the Walyering Gas Project just 9 months from announced discovery. The facility was designed with sustainability at the forefront - powered 100% by solar and battery, giving it some of the lowest modelled Scope 1 emissions for domestic gas in WA.

September 2023

Walyering brought online. The development reached payback - inclusive of royalties and production costs - only 8 months after start-up, demonstrating the value of Strike's high-margin, low-cost Perth Basin Jurassic portfolio.

2024

Walyering 7 drilled and tied in. Walyering East-1 and Walyering West-1 drilled as Near Field Exploration wells, providing potential back-fill for the Walyering Gas Plant.

2026

Walyering West drilled and tested. Following completion of Walyering West-1, Strike demonstrated sustained gas flows from the Cattamarra Formation and confirmed additional gas accumulation within the Walyering field.

Reserves updated to include Walyering West discovery.