2026 Strike Energy Ltd Annual Report
Released
Released
Announcement PDF
2026
ANNUAL REPORT 2026
DELIVERING A SECURE ENERGY FUTURE
ACKNOWLEDGEMENT OF COUNTRY
Strike respectfully acknowledges the Aboriginal and Torres Strait Islander Peoples of this nation and their
ongoing connection to culture and country. We are committed to maintaining positive, long-term and trusting
relationships. We pay our respects to their elders and leaders, past, present and emerging.
ABOUT THIS REPORT
This 2026 Annual Report is a summary of Strike’s operations, activities and financial position for the
12-month period ended 30 June 2026. In this report, unless otherwise stated, references to ‘Strike’,
the ‘Company’, the ‘Group’, ‘we’, ‘us’ and ‘our’ refer to Strike Energy Limited and its subsidiaries.
The Glossary defines terms used in this report. This
report contains forward‑looking statements. Please
refer to page 3, which contains a notice in respect of
these statements. All references to dollars, cents or
$ in this document are to Australian currency, unless
otherwise stated. Due to rounding, figures and ratios
in tables and charts throughout this report may not
reconcile to totals. An electronic version of this report
is available on Strike’s website
www.strikeenergy.com.au.
The 2026 Corporate Governance
Statement can be viewed on our website
on the Corporate Governance page.
CONTENTS
Key Statistics 5
FY26 highlights & recent milestones 5
01 About Strike 4
Information about the Directors 23
Reserves and Resources 28
Operating and Financial Review 30
Remuneration Report 38
Auditor’s Independence Declaration 56
Directors’ Declaration 57
05 Directors’ Report 23
Consolidated Financial Statements 59
Notes to Financial Statements 63
Consolidated Entity Disclosure Statement 94
Independent Auditor’s Report 95
Shareholder Information 100
Corporate Directory 102
06 Financial Report 58
02 Letter from the Chair 6
03 Managing Director’s Report 8
04 Operations and Project Overview 10
Important Notices
Forward Looking Statements
Statements contained in this Report, including but not limited to those regarding the possible or assumed future costs, projected timeframes, performance, dividends,
returns, revenue, exchange rates, potential growth of Strike, industry growth, commodity or price forecasts, or other projections and any estimated company earnings are
or may be forward looking statements. Forward looking statements can generally be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’,
‘outlook’, ‘schedule’, ‘estimate’, ‘target’, ‘guidance’ ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. Forward looking statements
including all statements in this document regarding the outcomes of preliminary and definitive feasibility studies, projections, guidance on future earnings and estimates
are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. These statements relate to future events and
expectations and as such involve known and unknown risks and significant uncertainties, many of which are outside the control of Strike. Actual results, performance,
actions and developments of Strike may differ materially from those expressed or implied by the forward-looking statements in this Report. Such forward-looking statements
speak only as of the date of this document. Refer to the risk factors starting on page 30 for a summary of certain general and Strike Energy specific risk factors that may
affect Strike Energy. There can be no assurance that actual outcomes will not differ materially from these statements. Investors should consider the forward looking
statements contained in this Report in light of those disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and any of its affiliates
and their directors, officers, employees, agents, associates and advisers disclaim any obligations or undertaking to release any updates or revisions to the information
in this document to reflect any change in expectations or assumptions; do not make any representation or warranty, express or implied, as to the accuracy, reliability
or completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward‑looking statement; and disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for negligence). Nothing
in this Report will under any circumstances create an implication that there has been no change in the affairs of Strike since the date of this document.
About
Strike
Letter
from
the
Chair
Managing
Director’s
Report
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
3
ABOUT STRIKE
Strike Energy Limited (ASX:STX) is a leading independent energy company delivering
reliable domestic gas and developing flexible power generation for Western Australia.
Strategically located near key processing and transmission infrastructure in the Mid‑West,
Strike is building a diversified portfolio of gas production, power generation and
exploration assets. Strike has one of the largest discovered gas portfolios in
the onshore Perth Basin and Mid-West, including the expansive Greater
Erregulla Permian fields and condensate rich Walyering.
OUR PURPOSE
Our purpose is to deliver secure and reliable energy to support Western Australia’s transition to a
lower‑emissions energy future while creating sustainable long-term value for stakeholders.
OUR STRATEGY
Our strategy outlines how we will achieve our purpose.
GENERATE
Maximise value from
producing assets
GROW
Convert resources into new
revenue stream assets
DISCOVER
Build the next generation
of growth assets
OUR VALUES
Our values guide in how we achieve our purpose. They shape the way we behave and the standards we set for
ourselves and others.
RESOURCEFULNESS: Delivering low cost and innovative solutions
COLLABORATION: Strike works in partnership with all of its stakeholders
AGILITY: Strike is nimble, and responds faster than the competition
OPENNESS: Strike is transparent and receptive to alternative views
LONG-TERM FOCUS: Strike’s focus is on the horizon to create multi-generational value
COMPETENCE: Strike’s actions are backed by qualified people who are experts in their fields
Letter
from
the
Chair
About
Strike
Financial
Report
Directors’
Report
Operations
&
Project
Overview
Managing
Director’s
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
4
FY26 HIGHLIGHTS & RECENT MILESTONES
KEY STATISTICS¹
1 Current as at 1 July 2026.
2 Refer to page 29 for important information on the estimation of Reserves and Resources.
3 For important information regarding loan conditions and terms, refer to ASX announcement on 31 August 2026 entitled “Company Update”.
~$63 MILLION Total Sales Revenue
85 MW SOUTH ERREGULLA
POWER PROJECT
Advanced through construction and
commissioning towards commercial operations
targeted in Q4CY26
251 PJ NET 2P RESERVES AT
WEST ERREGULLA²
~20% increase following independently
audited Reserves and Resources review
$30 MILLION HANCOCK ENERGY
PRE‑FID LOAN AGREED IN-PRINCIPLE³
To support Strike’s share of West Erregulla
development activities through to FID
$30 MILLION MACQUARIE
FACILITY MADE AVAILABLE³
Additional funding capacity
NEW LEADERSHIP
FOR STRIKE
Shelley Robertson appointed Managing Director
& CEO and Nev Power appointed Chair
WEST ERREGULLA DEVELOPMENT
PATHWAY ESTABLISHED
Processing solution agreed with Hancock
Energy, targeting 43.5 TJ/d of Strike production
capacity and first gas in CY29
RESERVES & RESOURCES OVERVIEW (PJ)
PRODUCTION OVERVIEW (PJ)
0 100 200 300 400 500 600 700 800
TOTAL
2C
2P
0 2 4 6 8 10
PRODUCTION
9
519
249
270
2025
2026
2025
2026
2025
2026
2025
2026 6
605
292
313
Letter
from
the
Chair
Managing
Director’s
Report
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
5
About
Strike
LETTER FROM
THE CHAIR
Having been involved with Strike for almost seven
years, I have seen the Company evolve from an
explorer, with a promising position in the Perth
Basin, into a developer and producer with an
increasingly important role in Western Australia’s
energy market.
FY26 marked important progress in that evolution.
Strike maintained a strong safety performance
throughout a year of intensive construction,
drilling, commissioning and operational activity
across the portfolio. At South Erregulla, the
team have done a fantastic job of bringing
the project through construction and into
commissioning towards commercial operations,
while also establishing a pathway to market
for West Erregulla, continuing production from
Walyering and advancing a substantial portfolio of
exploration opportunities across the Perth Basin.
Together, these assets provide the foundation for
Strike to become a larger, more diversified and
financially stronger energy business.
South Erregulla demonstrates Strike’s ability to
take a gas discovery through development into
an integrated power project. The 85 MW peaking
power station will provide a new source of firm
generation as Western Australia transitions away
from coal and the value of reliable, dispatchable
capacity continues to increase. Post year-end we
announced a pathway to market for one of Western
Australia’s largest undeveloped conventional
onshore gas fields, West Erregulla. This represents
an important step towards unlocking an asset
of considerable scale and strategic value.
Strike’s FY26 work also materially increased its
independently audited West Erregulla 2P Reserves
by 20%.
These developments come at an important time
for Western Australia. Growing electricity demand,
the retirement of coal-fired generation and the
continued expansion of renewable energy are
increasing the need for reliable domestic gas
supply and flexible gas-fired generation. Strike’s
combination of gas resources, production, power
generation, strategically located land and extensive
exploration acreage provides multiple avenues to
participate in that changing market.
Strike has had considerable success through
exploration and has assembled a portfolio that
would be difficult to replicate today. Historically,
however, the financial capacity of a junior company
has constrained the speed at which discoveries
could be progressed into producing assets. That
constraint is now beginning to change. Strike
has achieved an important inflection point, with
Walyering, South Erregulla and, ultimately, West
Erregulla positioning the Company to generate
revenue from three producing assets. This
represents a material step change in Strike’s
revenue base and, importantly, the financial
capacity available to accelerate exploration,
development and future growth. Our ambition is to
create a business where cash flow from producing
assets funds the next generation of opportunities,
allowing Strike’s growth to increasingly become
self-sustaining.
Exploration remains one of Strike’s greatest
potential sources of value. The Company retains a
substantial inventory of prospects and leads across
its Perth Basin acreage. With greater financial
capacity and access to an expanding infrastructure
footprint across the basin, future exploration
success has the potential to be appraised and
Dear Shareholders,
It is a privilege to write to you for the first
time as Chair of Strike Energy.
Managing
Director’s
Report
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
6
Letter
from
the
Chair
About
Strike
commercialised more rapidly than has historically
been possible.
FY26 also brought considerable change to Strike’s
leadership. On behalf of the Board, I thank John
Poynton for his leadership over the past nine years
and Mary Hackett for her contribution as a Director.
I am delighted to welcome Shelley Robertson as
Managing Director and CEO and look forward to
working with Shelley and the broader team through
this next phase of Strike’s development.
The refreshed Board and management team are
firmly aligned on creating maximum value from
Strike’s portfolio for shareholders, with a focus on
pace, disciplined capital allocation and execution. Our
immediate priorities are to bring our major projects
into cash flow, realise the value of the assets already
discovered and use the financial capacity they
generate to accelerate the next phase of growth.
I thank our employees and contractors for
their efforts during a demanding year and our
shareholders for their continued support. Strike
enters FY27 with a stronger asset base, clearer
development pathways and growing financial
capacity, and the Board is focused on ensuring
those advantages translate into enduring
shareholder value.
Yours sincerely,
Nev Power
Chair
Strike Energy Limited
Managing
Director’s
Report
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
7
Letter
from
the
Chair
About
Strike
MANAGING
DIRECTOR’S REPORT
What attracted me to Strike was the quality of its
assets, the capability within the organisation and,
importantly, the opportunity to translate a substantial
resource position into a reliable, high-performing
energy business.
FY26 was a year of intensive activity across the
portfolio, with construction and commissioning
at South Erregulla, continued production and
infrastructure upgrades at Walyering, drilling and
testing at Walyering West and further technical
and commercial work to advance West Erregulla.
This was achieved while maintaining strong safety
performance across our operations and projects,
which remains fundamental to how we will operate
the business.
South Erregulla was the largest operational
undertaking during the year. The project progressed
from early construction through mechanical
completion and into commissioning, including the
successful introduction of gas and commissioning
of all 20 generating units. At year end, the
power station and upstream gas facilities were
mechanically complete, with work continuing on the
Western Power network connection required to bring
the project into commercial operations.
While considerable progress has been made, our
focus is firmly on completing the remaining work
safely and establishing South Erregulla as a reliable
operating asset. The project represents an important
step in Strike’s evolution, adding power generation
to our existing gas production and creating a second
source of revenue for the Company.
At Walyering, the field continued to supply gas
throughout FY26 while the team undertook a
substantial program of work to support its ongoing
performance. This included the installation of
additional heat exchange capacity and compression
infrastructure, alongside the drilling and testing of
the Walyering West near field exploration prospect.
Walyering West-1 confirmed a new conventional
gas accumulation within the Cattamarra Formation
and provided valuable information as we assess
opportunities to extend the value of the broader
Walyering asset.
West Erregulla remains central to Strike’s next
phase of growth. The independently audited
Reserves and Resources update completed
during the year increased Strike’s estimated
net 2P Reserves by 20% to 251 PJ⁴ and further
reinforced the scale and quality of the field. With
a pathway to market established, our attention
has turned to the disciplined execution required
to progress West Erregulla towards development
and, ultimately, production. The prize is not simply
producing gas. It is unlocking a large, long-life
Western Australian gas resource and connecting it to
a market that increasingly faces a tightening between
supply and demand.
Beyond these projects, Strike retains a substantial
exploration position across the Perth Basin.
Exploration provides us additional opportunities
beyond our core development assets and will remain
an important part of our growth strategy. Our focus
will be on prioritising those opportunities where
technical quality, commercial potential and proximity
I am pleased to write to you for the first time
as Managing Director and Chief Executive
Officer of Strike Energy, having joined the
Company in June 2026 at an important point
in its development.
4 Refer to page 29 for important information on the estimation of Reserves and Resources.
Letter
from
the
Chair
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
8
Managing
Director’s
Report
About
Strike
to existing or planned infrastructure provide the
greatest opportunity to create value.
Having spent time with our people and visited our
operations, I see considerable opportunity to build on
what Strike has already achieved. As the Company
moves from developing individual projects towards
operating a broader portfolio of producing assets, the
requirements of the business also change. We need to
embed strong operating disciplines, improve reliability
and performance, maintain rigorous cost and capital
management, and ensure that we consistently deliver
what we commit to. These are important priorities for
me and the leadership team in FY27.
Looking ahead, we will remain focused on safely
bringing South Erregulla into commercial operations,
optimising Walyering, progressing West Erregulla and
maintaining a disciplined approach to the exploration
opportunities capable of supporting Strike’s next
phase of growth.
I have joined Strike at an exciting stage in its
evolution, with a strong portfolio of assets and
significant opportunities ahead. I look forward to
working with our people, the Board and our partners
to realise our potential, strengthen Strike’s position
as a leading Western Australian energy company,
and deliver long-term value for all stakeholders.
Through this, we can play an important role in
providing secure energy for Western Australia while
supporting the transition to a lower-emissions future.
Yours sincerely,
Shelley Robertson
Managing Director and Chief Executive Officer
Strike Energy Limited
Letter
from
the
Chair
Operations
&
Project
Overview
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
9
Managing
Director’s
Report
About
Strike
OPERATIONS AND
PROJECT OVERVIEW
100%-owned producing gas field and processing infrastructure providing existing
production, revenue and a platform for near-field resource development.
SEE PAGE 13 FOR MORE INFORMATION
1 WALYERING
100%-owned integrated gas-to-power project comprising the South Erregulla gas
field and 85 MW peaking power station, which transitioned into commissioning
during FY26 targeting commercial operations in Q4CY26.
SEE PAGE 15 FOR MORE INFORMATION
2 SOUTH ERREGULLA
Large-scale conventional gas resource with a defined pathway to market through
Hancock Energy’s proposed Belisama Gas Processing Facility.
Strike’s equity is 50%.
SEE PAGE 18 FOR MORE INFORMATION
3 WEST ERREGULLA
100%-owned exploration acreage including Ocean Hill and Strike's eastern Perth
Basin permits, providing longer-term gas resource and development optionality.
SEE PAGE 20 FOR MORE INFORMATION
4 EXPLORATION PORTFOLIO
Situated on Kings Park Road, West Perth is home to Strike’s corporate
headquarters and remote operations centre.
5 PERTH
At 30 June 2026
About
Strike
Letter
from
the
Chair
Managing
Director’s
Report
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
10
Operations
&
Project
Overview
0 5 10 20
Kilometers
Perth Basin Permits
Gas Fields
Strike Permits
Lockyer
W. Erregulla
S. Erregulla
Waitsia
Ocean Hill
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
100%
100%
50%
Exploration Portfolio
Walyering
3
2
4
1
Perth
WESTERN
AUSTRALIA
5
About
Strike
Letter
from
the
Chair
Managing
Director’s
Report
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
11
Operations
&
Project
Overview
Strike holds a material portfolio of operated gas,
power and exploration assets across Western
Australia’s Perth Basin, positioned close to existing
gas and electricity infrastructure and the State’s
major sources of energy demand.
The portfolio combines established gas production at
Walyering, the 85 MW South Erregulla Power Project,
material discovered gas resources at West Erregulla
and Ocean Hill, and a significant 100%-owned
exploration position.
During FY26, Strike continued to invest in the
infrastructure and resource base required to support
the next phase of the Company’s growth. South
Erregulla progressed through construction and into
commissioning, Walyering production infrastructure
was enhanced, material resource positions were
established or strengthened at West Erregulla
and Ocean Hill, and Strike continued to mature its
exploration portfolio.
Together, these assets provide Strike with multiple
pathways to create value through production,
power generation, resource commercialisation and
exploration-led growth.
Strike’s assets are positioned to support Western
Australia’s evolving energy requirements, with natural
gas and flexible gas-fired generation expected to
play an important role in maintaining system reliability
as renewable penetration increases and coal-fired
generation is progressively retired.
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
12
Operations
&
Project
Overview
Managing
Director’s
Report
Letter
from
the
Chair
About
Strike
FY26 Operations
During FY26, Strike continued to optimise production
from Walyering in response to field performance and
prevailing gas market conditions.
A second heat exchanger was installed during
the year, enabling production to increase to
approximately 15 TJ/day from March 2026. Strike also
progressed the installation and commissioning of
two gas compression packages designed to support
production as reservoir pressure declines.
Strike supplemented its own production with
third‑party gas purchases during the year to meet firm
contractual commitments while preserving flexibility
in the operation of the Walyering field. In FY26, 2.37
PJ of third-party gas was purchased and on-sold
under existing gas sales arrangements.
WALYERING
Producing | Strike 100% | Operator | Nameplate 33 TJ/d Gas Processing Facility
Asset Overview
The Walyering gas field is located within Production
Licence L23, approximately 150 kilometres north of
Perth. Strike owns and operates 100% of the field and
associated Walyering Gas Processing Facility.
Walyering commenced production in September
2023 and provides gas into the Western Australian
domestic market via the Parmelia Gas Pipeline. The
development established Strike as a domestic gas
producer and provides existing infrastructure that can
support future development of nearby discoveries.
FY26 Highlights
• Produced 5.90 PJe of gas and
condensate during FY26.
• Generated approximately $63 million
of total sales revenue, including gas
purchased from third parties and on-sold
under existing contractual arrangements.
• Installed additional cooling and
compression infrastructure to
support production reliability and
field optimisation.
• Successfully drilled and flow tested
Walyering West-1, confirming a new
conventional gas accumulation in the
Cattamarra Formation.
• Booked maiden 2P Reserves at
Walyering West following independent
assessment by RISC Advisory.
• Increased combined Walyering 2P
Sales Gas Reserves to 16.4 PJ at
1 July 2026, from 13.6 PJ at 1 July 2025,
after accounting for 5.7 PJ of
FY26 production.
• Progressed planning and FEED for the
tie-in of Walyering West-1 to the existing
Walyering Gas Processing Facility.
Letter
from
the
Chair
Managing
Director’s
Report
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
13
Operations
&
Project
Overview
About
Strike
FY27 Focus
Optimise
Complete commissioning of compression
infrastructure and optimise production from
the existing field.
Develop
Progress the Walyering West-1 tie-in through
FEED and toward a final investment decision.
Leverage
Assess opportunities to utilise existing
Walyering infrastructure to commercialise
nearby resources.
Walyering West
During FY26, Strike drilled the Walyering West-1
exploration well approximately two kilometres west of
the producing Walyering-5 well.
The well successfully identified a new conventional
gas accumulation within the Cattamarra Formation.
Production testing recorded a stabilised flow rate of
approximately 11 MMscf/day from the C1 Sand, with low
CO₂ content and a higher condensate yield than that of
existing Walyering production.
Following completion of the testing program, the
Walyering West results were incorporated into
Strike’s annual independent Reserves and Resources
assessment. RISC Advisory booked maiden 2P Reserves
associated with the Walyering West C1 Sand and
additional Contingent Resources across a number of
other reservoir intervals encountered by the well.
The assessment incorporated Walyering West and the
producing Walyering field into a combined Walyering
Reserves booking, reflecting the proximity of the discovery
to existing production infrastructure and its planned
development through the Walyering Gas Processing Facility.
The results from Walyering West-1 have enhanced
Strike’s understanding of the broader Walyering field and
provide additional information to support future reservoir
management and potential development opportunities
utilising the existing Walyering Gas Processing Facility.
WALYERING (CONT'D)
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
14
Operations
&
Project
Overview
Managing
Director’s
Report
Letter
from
the
Chair
About
Strike
SOUTH ERREGULLA
Development | Strike 100% | Operator | 85 MW Peaking Gas Power Station
Asset Overview
South Erregulla is Strike's 100%-owned integrated
gas-to-power development located within Production
Licence L24 in the Mid-West of Western Australia.
The project combines the South Erregulla gas field with
an 85 MW fast-start peaking power station, providing
Strike with direct exposure to Western Australia's
electricity market and Reserve Capacity Mechanism.
The facility comprises 20 × 4.5 MW Jenbacher
reciprocating gas engines, upstream gas gathering
and processing infrastructure and dedicated
electricity transmission and connection infrastructure.
FY26 Highlights
• Project progressed to approximately
94% complete at 30 June 2026.
• Achieved mechanical completion
of the upstream gas facilities and
power station.
• Successfully introduced South
Erregulla gas and commissioned all
20 generating units.
• Completed construction and
pre‑commissioning of the approximately
15 kilometre 132 kV transmission line.
• Advanced construction of the
switchyards and 1.5 kilometre
dual‑circuit connection to the South
West Interconnected System.
• Transitioned from construction
into commissioning.
FY26 Development
FY26 represented a major construction and
commissioning year for South Erregulla.
During the year, Strike substantially completed
construction of the upstream gas facilities and power
station, culminating in mechanical completion in
June 2026. South Erregulla gas was successfully
introduced into the facility and used to commission all
20 generating units.
Construction also progressed across the project's
electricity transmission infrastructure, including
completion and pre-commissioning of the
approximately 15 kilometre 132 kV transmission
line and advancement of the switchyards and 1.5
kilometre dual-circuit connection to the South West
Interconnected System.
At 30 June 2026, the project was approximately 94%
complete and had transitioned from construction into
commissioning. Subsequent network commissioning
activities are being undertaken in conjunction
with Western Power and Australian Energy Market
Operator (AEMO) ahead of commercial operations.
Letter
from
the
Chair
Managing
Director’s
Report
Directors’
Report
Financial
Report
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
15
Operations
&
Project
Overview
About
Strike
Market Participation
Once operational, South Erregulla is expected
to provide fast-start, flexible generation into the
South West Interconnected System, supporting
system reliability and the integration of increasing
renewable generation.
The project will participate in the Wholesale Electricity
Market, generating revenue through the sale of
electricity and the Reserve Capacity Mechanism.
Strike secured 85 MW of Certified Reserve Capacity
for the project. For the 2026/27 Capacity Year,
the final Reserve Capacity Price of $216,092/MW
represents approximately $18 million of annual
capacity revenue, in addition to revenue generated
from electricity sales.
For the 2027/28 Capacity Year, the final Reserve
Capacity Price of $360,700/MW represents
approximately $31 million of annual capacity revenue,
in addition to revenue generated from electricity sales.
The subsequent increase in the Benchmark Reserve
Capacity Price to approximately $488,500/MW for
2028/29 Capacity Year provides further evidence of
the value being placed on new firm capacity within
the Western Australian electricity market.
FY27 Focus
Commission
Complete grid connection, Generator
Performance Standard testing and remaining
commissioning activities.
Operate
Progress the project through to
commercial operations.
Optimise
Establish safe and reliable operating
performance and optimise participation in
the Wholesale Electricity Market.
SOUTH ERREGULLA (CONT'D)
About
Strike
Letter
from
the
Chair
Managing
Director’s
Report
Operations
&
Project
Overview
STRIKE ENERGY LIMITED | ANNUAL REPORT 2026
16
Financial
Report
Directors’
Report
Strike's investment at South Erregulla extends beyond
the development of the 85 MW power station.
Strike owns approximately 3,500 hectares of freehold
land above the South Erregulla gas field, which
brings together gas resources, dispatchable power
generation and proximity to major electricity and
gas infrastructur
Share your feedback