South Erregulla Peaking Power Plant
Released
Released
Announcement PDF
South Erregulla
Power Project
June 2024
Powering Western Australia’s Energy Transition
Cautionary note and disclaimer
Summary information
This presentation contains summary information and statements about Strike Energy Limited (ASX:STX) (Strike), its subsidiaries and their respective activities, which is current as at the date of
this presentation (unless otherwise indicated).
The information in this presentation is general in nature and does not purport to be exhaustive. For example, this presentation does not purport to contain all of the information that investors
may require in evaluating a possible investment in Strike . It has been prepared by Strike with due care but no representation or warranty, express or implied, is provided by Strike in relation to
the currency, accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this presentation.
This presentation should be read in conjunction with Strike’s other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX), which are
available on the ASX website (at www.asx.com.au) and the Strike website (at www.strikeenergy.com.au).
No person other than Strike has authorised or caused the issue, release, submission, distribution or provision of this presentation, or takes any responsibility for, or makes or purports to make,
any statements, representations or undertakings in this presentation. Strike, to the maximum extent permitted by law, expressly excludes and disclaims all liability (including, without limitation,
any liability arising out of fault or negligence on the part of any person) for any direct, indirect, consequential or contingent loss or damage, or for any costs or expenses, arising from the use of
this presentation or its contents or otherwise arising in connection with it. Strike does not make any representations or warranties (express or implied) to you about the currency, accuracy,
reliability or completeness of the information, opinions and conclusions in this presentation (including, without limitation, any financial information, any estimates or projections and any other
financial information).
Not an offer, and not investment or financial product advice
This presentation is not a prospectus, product disclosure statement or other disclosure document under the Corporations Act, or other offering document under Australian law or any other law.
This presentation has not been lodged with the Australian Securities and Investments Commission. This presentation, and the information contained in it, is provided for information purposes
only and is not an offer or solicitation or an invitation or recommendation to subscribe for, acquire or buy securities of Strike, or any other financial products or securities, in any place or
jurisdiction.
This presentation may not be released to US wire services or distributed in the United States. This presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any
securities in the United States or any other jurisdiction in which such an offer would be unlawful. The securities referred to in this document have not been, and will not be, registered under the
US Securities Act of 1933 (US Securities Act) and may not be offered or sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US
Securities Act and applicable US state securities laws.
This presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or investment advice (nor tax, accounting or legal advice) or a
recommendation to acquire any securities of Strike. It has been prepared without taking into account the objectives, financial or tax situation or particular needs of any individual. Any
investment decision, should be made based solely upon appropriate due diligence and other inquiries. Before making any investment decision, investors should consider the appropriateness
of the information having regard to their own objectives, financial and tax situation and needs and seek professional advice from their legal, financial, taxation or other independent adviser
(having regard to the requirements of all relevant jurisdictions). Strike is not licensed to provide financial product advice in respect of an investment in securities, and do not purport to give
advice of any nature. An investment in any listed company, including Strike, is subject to risks of loss of income and capital.
Past performance
Past performance metrics and figures, as well as pro forma financial information, included in this presentation are given for illustrative purposes only and should not be relied upon as (and are
not) an indication of Strike’s views on Strike's future financial performance or condition or prospects (including on a consolidated basis). Investors should note that past performance of Strike,
including in relation to the historical trading price of shares, production, reserves and resources, costs and other historical financial information cannot be relied upon as an indicator of
(and provide no guidance, assurance or guarantee as to) future performance, including the future trading price of shares. The historical information included in this presentation is, or is based
on, information that has previously been released to the market.
Investment risk
As noted above, an investment in shares in Strike is subject to investment and other known and unknown risks, some of which are beyond the control of Strike. These risks, together with other
general risks applicable to all investments in listed securities not specifically referred to, may affect the value of shares in Strike in the future. Strike does not guarantee any particular rate of
return or the performance of Strike, nor guarantee the repayment of capital from Strike, or any particular tax treatment. When making any investment decision, investors should make their own
enquires and investigations regarding all information in this presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect future operations of
Strike, and the impact that different future outcomes may have on Strike. Refer to the risk factors set out in Talon Energy Limited’s Scheme Booklet dated 3 November 2023 in relation to the
acquisition by Strike Energy (through its wholly owned subsidiary) of all of the issued shares in Talon Energy by way of scheme of arrangement pursuant to Part 5.1 of the Corporations Act 2001
(Cth) for a summary of certain general, Strike Energy specific and acquisition specific risk factors that may affect Strike Energy.
2
Maximising South Erregulla value through
peaking power integration
1
2
3
4
Strike has submitted an application to the AEMO for the award of
capacity credits and network access to support a stand-alone
development proposal at South Erregulla.
Strike will look to construct and operate a fully integrated 85 MW
peaking gas power plant on Strike’s Precinct with operations to
commence by October 2026.
The proposed power plant will be fuelled by South Erregulla’s
newly re-certified gas Reserves, where the 1P Reserves supports a
project life of more than 25 years2
South Erregulla
Independently Re-certified
2P Reserves & 2C Resources1
Net PJ
45
82
2P Reserves
37
2C Resources
The Project is modelled to utilise ~1.3 PJ pa and generate revenue
of $40-$50m pa over the first 5 years of operations
1. Reserves re-certified by NSAI as at 31 May 2024 and reported to Strike on 21 June 2024,. Refer to Important Notices on slide 12 for information relating to reserves and resource estimates.
2. Project life modelled on average throughput of ~1.3 PJ per annum, refer to key operating assumptions outlined on page 7 of ASX release dated 24 June 2024 entitled “Peaking Power Plant submission supported by South
Erregulla Reserves”.
Sustained investment in gas generation needed
Forecast SWIS capacity mix by fuel type
Forecast electricity supply-demand balance
(ESOO 2024)
(Expected Scenario: ESOO 2024)
Capacity (MW)
MW
Batteries
Biogas
Wind
Distillate
6,000
Solar
Natural gas
6,750
Coal
5,000
-39%
6,000
5,250
4,000
3,000
51%
4,500
2,000
3,750
1,000
Reserve Capacity Target
3,000
24-25
Coal being phased out
Forecast available existing and committed capacity
26-27
28-29
30-31
62%
32-33
0
24-25
26-27
28-29
30-31
32-33
WA Govt intends to phase out coal which supplies ~30% of current electricity, whilst peak
demand is rising at 3.7% p.a.
This power is forecast to be replaced by renewables, batteries and importantly firmed by gas
4
Source: 2024 Wholesale Electricity Market Electricity Statement of Opportunities, 18 June 2024.
Replacement of northern gas generation is urgent
Capacity Credits assigned for 2025-26 by fuel
type and facility age, as of 15 May 2024 (MW)
SWIS gas peaking generation capacity (MW)
South
331
Capacity Credits (MW)
North
Solar
Landfill gas
2,000
Coal
WTE
Distillate
1,500
196
Battery
Wind
155 155
Natural gas
1,000
109
85
37
37
36
31
29
Pinjar GT3
Pinjar GT7
Pinjar GT2
Pinjar GT1
Pinjar GT5
Facility age (years)
Source: AEMO WEM ESOO 2024
Pth Egy Kwin GT1
10-14 15-19 20-24 25-29 30-34 35-39
Kemerton GT11
5-9
Kemerton GT12
0-4
Alinta_WGP
0
Newgen Nbup GT1
37
Pinjar GT4
500
Source: AEMO. Based on CRC 2025-26, actual
nameplates of plants may differ.
Most gas generation in the SWIS is between 15-34 years old. Currently there is no
firming gas generation in the North, only black start capacity which is 34 years old
5
Physical assets with a strategically advantaged location
Surveyed 330 KV corridor
Existing 132 KV line
Strike owns the 3,500 ha
Precinct above the South
Erregulla gas field and
Production Licence L24
where it can locate critical
infrastructure
Production
Licence L24
Transmission Corridor
85 MW Peaking
Power Plant
Transmission lines
connecting to the SWIS
surround Strike’s gas fields
Strategic advantage over
incumbent domestic gas
producers in the Northwest of
the State (Carnarvon Basin)
Significant planned upgrades
of local transmission are
planned, which may facilitate
low complexity growth
South Erregulla
Reserves
Strike’s Precinct
4.8mt CO₂ storage capacity1
has been discovered under
the Precinct
1. Refer to Slide 12 for important information on Reserves and Resources.
6
Premium realised pricing versus domestic gas
WEM monthly average peaking prices1
A$ MWh
South Erregulla Spark Spread $ GJ for modelled
average energy sales of $140 MWh over first 5-years2
$MW
200
$10
150
+119%
+102%
$18
100
$8
50
WA intention to switch
off coal by 2029 and
cease subsidy by 2026
0
Source: AEMO Quarterly Energy Dynamics Q1 2024
Jan-21 Jul-21 Jan-22 Jul-22 Jan-23 Jul-23 Jan-24
Domestic
Gas Price
Conversion to
Electricity
Realised Price
Assumes ~8 GJ/MW produced with a base assumption of $8 GJ for domestic gas using Walyering sales as a benchmark
South Erregulla can maximise the value of its gas resource via conversion and
integration to peaking electricity
1.
2.
Based on half-hour average peak price data from AEMO. Data sources: Pre Sep 2023: https://aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem/data-wem/market-data-wa; Post Sep 2023:
https://data.wa.aemo.com.au/public/market-data/wemde/referenceTradingPrice/previous/
Refer to ASX Release dated 24 June 2024 entitled “Peaking Power Plant submission supported by South Erregulla Reserves” for basis of modelled energy sales price.
7
Revenue largely underpinned by Capacity Credits
Requirement for urgent new capacity is driving up
Capacity credit pricing1,2
Average revenue stack first five years
of operations2
$40-50m p.a.
$000s/MW/Year
12%
240
38%
Est Range
$180-$225
MW
180
120
50%
60
WA intention to switch
off coal by 2029 and
cease subsidy by 2026
Forecast Revenue Sources
Ancilliary Services
Capacity Credits
Source: AEMO Quarterly Energy Dynamics Q1 2024
Energy
18.8% capacity factor, average energy sales price $140
MWh (2024$), capacity price of $180-230k pa per MW
(2026$)
Historical
3rd Party Estimates (2026$)
0
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Capacity Year
Capacity Credits are an important source of Revenue in the WEM and support the
Project’s bankability. Generators are able to lock in 5-years of pricing plus CPI.
8
1.
2.
https://aemo.com.au/-/media/files/electricity/wem/planning_and_forecasting/esoo/2023/
Refer to ASX Release dated 24 June 2024 entitled “Peaking Power Plant submission supported by South Erregulla Reserves” for assumptions behind revenue stack and modelled prices.
South Erregulla Peaking Power Plant
Project Execution Schedule
85 MW Peaking Power Plant
Capital Estimate: $120-$160m (Class 3)
20 x 4.5 MW reciprocating gas engines
2.4 km of flowline will be installed to
provide 1 TJ or 60 minutes of line pack
Fuelled via SE1 with a second well
(SE3-ST1) or SE4 to be drilled in year2 of operation
Opex estimate (incl royalties): $5m-7m
Assumed 18.8% capacity factor (period of
time when local wind generation is low)
Efficiency of ~8.0 GJ/ MWh (LHV1) or ~1.3 PJ
pa
South Erregulla 1P Reserves covers >25
years of operation2
Utilises existing approvals and Production
Licence with support from:
Key Dates:
August-24: Notification of award of capacity
Payment of Capacity Credit deposit
Unconditional FID: November-24 (subject to, among other things,
publishing of RCP & Min Network Access Quantity and financial close of
Macquarie's project financing facility)
Commercial operations: October-26
Deputy Director General DEMIRS
Funding:
Western Power
Strike has agreed terms for a $153m development financing package from
Macquarie3. $53 million is allocated specifically to the South Erregulla
power project development
DJTSI: Lead Agency Service
Remaining contribution from Strike’s existing production operations
1. LHV = Lower Heating Value
2. Project life modelled on average throughput of ~1.3 PJ per annum, refer to key operating assumptions outlined on page 7 of ASX release dated 24 June 2024 entitled “Peaking Power Plant submission supported by South Erregulla”.
3. Refer ASX announcement “Terms agreed for $153m Development Funding Package” dated 21 June 2024 for details of the finance facility. Facility is subject to definitive documentation and satisfaction of various conditions precedent.
9
Catalyst rich year ahead
Strike firm catalysts
Now
Ocean Hill
3D Seismic
campaign
Walyering 7 SE Review &
appraisal Development
drilling
Plan
2024
Walyering
volumes
delivered into
DBNGP
Erregulla Booth-1
Deep-1 drilling
drilling
Strike Energy
Contingent events
Arrino/Kadathinni
2D Seismic
campaign
1.
2.
WA Domgas
Policy
Update
Ministerial
approval for
WE EP
Subject to, among other things, Joint Venture discussions/processes and regulatory approvals.
Subject to, among other things, Ocean Hill and Walyering appraisal results, rig procurement, and land access and regulatory approvals.
WE FID1
Ocean Hill or further
Walyering Appraisal
Drilling2
Timeline is not to scale and is indicative only
10
Central to WA’s energy transition
Q&A
11
Forward looking statements and project information
Forward looking statements
This presentation contains forward looking statements about Strike. Often, but not always, forward looking statements can be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”,
“estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements in this presentation regarding intent, belief, expectations, plans, strategies and objectives of
management, indications of and guidance on synergies, future earnings or financial position or performance, future acquisitions, anticipated production rates or construction commencement dates, costs or production
outputs for each of Strike and the future operation of Strike. Strike does not make any representation or warranty as to the currency, accuracy, reliability or completeness of any forward-looking statements contained in
this presentation.
To the extent that this presentation materials contains forward looking information, the forward-looking information is subject to a number of risks, including those generally associated with the gas industry more broadly.
Any such forward looking statement inherently involves known and unknown risks, uncertainties and other factors that may cause actual results, performance and achievements to be materially greater or less than
estimated. These may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative
nature of exploration and project development (including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves), political and social risks, changes to the regulatory
framework within which Strike operate or may in the future operate, environmental conditions including extreme weather conditions, geological and geotechnical events, and other environmental issues, the recruitment
and retention of key personnel, industrial relations issues, litigation and outbreaks of disease or pandemics (including the continuation or escalation of the global COVID-19 pandemic).
Any such forward looking statements are based on assumptions, qualifications and contingencies which are subject to change and which may ultimately prove to be materially incorrect, as are statements about market
and industry trends, which are based on interpretations of current market conditions. Investors should consider any forward-looking statements contained in this presentation in light of such matters (and their inherent
uncertainty) and not place reliance on such statements. Forward looking statements are not guarantees or predictions of future performance and may involve significant elements of subjective judgment, assumptions as
to future events that may not be correct, known and unknown risks, uncertainties and other factors, many of which are outside the control of Strike. Any forward-looking statements are based on information available to
Strike as at the date of this presentation. Refer to the risk factors set out in Talon Energy Limited’s Scheme Booklet dated 3 November 2023 in relation to the acquisition by Strike Energy (through its wholly owned
subsidiary) of all of the issued shares in Talon Energy by way of scheme of arrangement pursuant to Part 5.1 of the Corporations Act 2001 (Cth) for a summary of certain general, Strike Energy specific and acquisition
specific risk factors that may affect Strike Energy. There can be no assurance that actual outcomes will not differ materially from these statements. Investors should consider the forward looking statements contained in
this presentation in light of those disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and its directors, officers, employees, advisers, agents and other intermediaries disclaim
any obligation or undertaking to provide any additional or updated information, whether as a result of new information, future events or results or otherwise (including to reflect any change in expectations or
assumptions).
Nothing in this presentation will, under any circumstances (including by reason of this presentation remaining available and not being superseded or replaced by any other presentation or publication with respect to
Strike or any other matter the subject matter of this presentation), create an implication that there has been no change in the affairs of Strike since the date of this presentation.
Effect of rounding and Financial data
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from
the figures set out in this presentation. All dollar values are in Australian dollars ($ or A$ or AUD) unless stated otherwise. All references to USD or US$ or USD are to the currency of the United States of America.
Power Project
Details of the Power Project are set out in ASX release dated 24 June 2024 entitled “Peaking Power Plant submission supported by South Erregulla”. The development of the Power Project is contingent on, among other
things, the award of Certified Reserve Capacity (CRC) and Network Access Quantity (NAQ), satisfaction of the conditions precedent to and financial close under the Macquarie Bank project finance facility for the Power
Project, execution of all required procurement contracts, and obtaining all requisite regulatory and stakeholder permits, approvals, licences and authorisations by no later than 30 November 2024 in order to meet the
construction timeline to be supplying electricity into the grid by 1 October 2026.
The forecast capital and operating expenditures and revenue for the Power Plant have been modeled based on the assumptions and information set out or referred to in this release, are to the level of accuracy as
specified in this release, and are subject to change. These forecasts are, by their nature, forward looking statements and subject to the same risks as other forward looking statements (see above).
Reserves and resources estimates
Information in this presentation relating to the Reserve and Resource Estimates for:
•
The South Erregulla Project is set out in the ASX announcement dated 24th June 2024 entitled “South Erregulla Reserves”. Strike equity interest is 100%.
•
The South Erregulla Contingent CO2 Storage Resource Estimate is set out in ASX announcement dated 15th June 2023 entitled “South Erregulla Update’.
This reserves and resources estimates must, therefore, be read in conjunction with the full text of the ASX releases referred to. The Reserves and Resources are unrisked.
Strike is unaware of any new information that materially impacts the information in these releases and confirms that all the material assumptions and technical parameters underpinning the estimates in the above
releases continue to apply and have not materially changed.
12
Share your feedback
Discover