2026 Euroz Rottnest Conference
Released
Released
Announcement PDF
Euroz Rottnest Conference 2026 | 1
ASXSTX
EUROZ HARTLEYS
ROTTNEST CONFERENCE
19 March 2026
Euroz Rottnest Conference 2026 | 2
Summary information
This presentation contains summary information and statements about Strike Energy Limited (ASX:STX)
(Strike), its subsidiaries and their respective activities, which is current as at the date of this presentation
(unless otherwise indicated).
The information in this presentation is general in nature and does not purport to be exhaustive. For example,
this presentation does not purport to contain all of the information that investors may require in evaluating
a possible investment in Strike . It has been prepared by Strike with due care but no representation or
warranty, express or implied, is provided by Strike in relation to the currency, accuracy, reliability, fairness or
completeness of the information, opinions or conclusions in this presentation.
This presentation should be read in conjunction with Strike’s other periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange (ASX), which are available on the ASX
website (at www.asx.com.au) and the Strike website (at www.strikeenergy.com.au).
No person other than Strike has authorised or caused the issue, release, submission, distribution or provision
of this presentation, or takes any responsibility for, or makes or purports to make,
any statements, representations or undertakings in this presentation. Strike, to the maximum extent permitted
by law, expressly excludes and disclaims all liability (including, without limitation, any liability arising out of fault
or negligence on the part of any person) for any direct, indirect, consequential or contingent loss or damage, or
for any costs or expenses, arising from the use of this presentation or its contents or otherwise arising
in connection with it. Strike does not make any representations or warranties (express or implied) to you about
the currency, accuracy, reliability or completeness of the information, opinions and conclusions in this
presentation (including, without limitation, any financial information, any estimates or projections and any
other financial information).
Not an offer, and not investmentor financial product advice
This presentation is not a prospectus, product disclosure statement or other disclosure document under the
Corporations Act, or other offering document under Australian law or any other law. This presentation has not
been lodged with the Australian Securities and Investments Commission. This presentation, and the
information contained in it, is provided for information purposes only and is not an offer or solicitation or an
invitation or recommendation to subscribe for, acquire or buy securities of Strike, or any other financial
products or securities, in any place or jurisdiction.
This presentation may not be released to US wire services or distributed in the United States. This
presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securities in
the United States or any other jurisdiction in which such an offer would be unlawful. The securities referred to
in this document have not been, and will not be, registered under the US Securities Act of 1933
(US Securities Act) and may not be offered or sold in the United States except in transactions exempt from,
or not subject to, the registration requirements of the US Securities Act and applicable US state securities
laws.
This presentation, and the information provided in it, does not constitute, and is not intended to constitute,
financial product or investment advice (nor tax, accounting or legal advice) or a recommendation to acquire
any securities of Strike. It has been prepared without taking into account the objectives, financial or tax
situation or particular needs of any individual. Any investment decision, should be made based solely upon
appropriate due diligence and other inquiries. Before making any investment decision, investors should
consider the appropriateness of the information having regard to their own objectives, financial and tax
situation and needs and seek professional advice from their legal, financial, taxation or other independent
adviser (having regard to the requirements of all relevant jurisdictions). Strike is not licensed to provide
financial product advice in respect of an investment in securities, and do not purport to give advice of any
nature. An investment in any listed company, including Strike, is subject to risks of loss of income and capital.
Past performance
Past performance metrics and figures, as well as pro forma financial information, included in this presentation
are given for illustrative purposes only and should not be relied upon as (and are not) an indication of Strike’s
views on Strike's future financial performance or condition or prospects (including on a consolidated basis).
Investors should note that past performance of Strike, including in relation to the historical trading price of
shares, production, reserves and resources, costs and other historical financial information cannot be relied
upon as an indicator of (and provide no guidance, assurance or guarantee as to) future performance,
including the future trading price of shares. The historical information included in this presentation is, or is
based on, information that has previously been released to the market.
Investmentrisk
As noted above, an investment in shares in Strike is subject to investment and other known and unknown
risks, some of which are beyond the control of Strike. These risks, together with other general risks applicable
to all investments in listed securities not specifically referred to, may affect the value of shares in Strike in the
future. Strike does not guarantee any particular rate of return or the performance of Strike, nor guarantee the
repayment of capital from Strike, or any particular tax treatment. When making any investment decision,
investors should make their own enquires and investigations regarding all information in this presentation,
including but not limited to the assumptions, uncertainties and contingencies which may affectSyntax Warning: Invalid Font Weight
future
operations of Strike, and the impact that different future outcomes may have on Strike. Refer to the risk factors
starting on page 31 of the 2025 Annual Report for a summary of certain general and Strike Energy specific risk
factors that may affect Strike Energy.
DISCLAIMER AND IMPORTANT NOTICES
Euroz Rottnest Conference 2026 | 3
STRIKE ENERGY COMPANY SNAPSHOT
1. Market cap based on closing share price of $0.10 as at 18 March 2026
2.Refer to slide 20 for important information relating to reserves and resources estimates.
A leading Perth Basin pure play
2P 2C 2U
46%
3%
9%
41%
Total
310
282
307 900
West Erregulla & ED
Walyering
South Erregulla
Ocean Hill & Ocean Hill Sth
Total Audited Reserves & Resources
Strike Independently Audited Perth Basin 2P Reserves, 2C Resources
& 2U Resources (PJe)2
Prospective Resource Estimate Information & Cautionary statement: The estimated quantities of petroleum that may potentially be
recovered by the application of a future exploration and development project(s) relate to undiscovered accumulations. This estimate
is un-risked, probabilistically determined and has a risk of development. Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially moveable hydrocarbons. Refer to slide 20 for Reserves and Resource
estimate information.
Market Cap: $360m1
Shares on issue: 3.6b
One of the largest discovered gas portfolios
in the Perth Basin.
Strategically located near key processing
and transmission infrastructure.
310 2P, 282 2C and 307 2U of audited Reserves
and Resources2.
Additional unaudited Prospective Resources
at Kadathinni provide material upside from
ongoing exploration and appraisal activity.
Resource inventory underpins Strike’s long-
term supply capability into both gas and
power markets.
L25
50%
Waitsia
Lockyer &
North Erregulla
Beharra
EP503
100%
EP505
100%
EP506
100%
EP495
100%
EP488
100%
EP447
100%
EP489
100%
Walyering
(STX 100%)
Woodada
Ocean Hill
(STX 100%)
South Erregulla
(STXSyntax Warning: Invalid Font Weight
100%)
West Erregulla
(STX 50%)
PGP
The Precinct
(STX 100%)
Operator in all
permits
Erregulla Deep
(STX 50%)
L23
100%
L24
100%
DBNGP
Kadathinni
(STX 100%)
EP504
100%
L26
50%
FY26 HALF YEAR
RESULTS
OPERATIONS
REVIEW
Euroz Rottnest Conference 2026 | 5
OPERATIONS OVERVIEW
West Erregulla & Erregulla Deep South Erregulla
Exploration
Walyering
STX 50%, Operator
Pre-FID status
Midstream development options being advanced
~20% increase to WE reserves, 251 PJ 2P1 net to Strike
Planning and long lead procurement for West Erregulla-6 and
West Erregulla-2 & 4 workovers2
STX 100%, Operator
85 MW integrated peaking gas power
Under construction
On budget and on target for online 1 October 2026
Overall completion at 82%
Engine hall construction complete with all engines in place
and installed
Dry commissioning and connection works commenced
STX 100%, Operator
Online
Producing at 15 TJ/day
Purchasing 5 TJ/day on market whilst prices are soft to
mitigate firm gas supply shortfallSyntax Warning: Invalid Font Weight
Compressor installation underway, targeting online Q2 CY26
inline with operational requirements
Walyering West-1 NFE expected to spud mid-April 2026
STX 100%, Operator
Highly prospective exploration targets inc. Ocean Hill &
Kadathinni
Newly acquired 3D & 2D seismic shows significant
prospectivity with drill targets identified
Ocean Hill independent certification complete
1. Refer to slide 20 for important information relating to reserves and resources estimates.
2. Activities are subject to Joint Venture approval
Euroz Rottnest Conference 2026 | 6
L25 & L26 OVERVIEW
A strategically located, forecast-critical gas resource for WA
Strike Energy 50% (Operator) | Hancock Energy 50%
1. Volumes are net to Strike (50% equity share). Refer to slide 20 for important information relating to reserves and resources estimates.
2. https://www.aemo.com.au/energy-systems/gas/gas-forecasting-and-planning/wa-gas-statement-of-opportunities-wa-gsoo
3. Excluding Sundalara (previously Southwest Erregulla) which is not on 3D seismic
4. Previous Erregulla Deep prospective resources unaudited and on 2D seismic.
Project Name: West Erregulla Status: Pre-FID
Location: Perth Basin (L25 & L26) Reserves: 251 PJ 2P / 48 PJ 2C1
0 5 10 km
Lockyer
Waitsia
Beharra
Springs
Trigg
L 25
L 26
Kadathinni
DBNGP
PGP
Legend
Gas Processing (Online)
Gas Processing (Proposed)
Gas to Power (In construction)
Gas Field (STX 100%)
Gas Field (STX 50%)
Gas Field (3rd Party)
STX Prospect (100% equity)
Gas Pipeline
Major Powerline
South
Erregulla
Perth ~300 Km
250 TJ/day
(210 TJ/day)
26 TJ/day
85 MW
25 & L26 Production
Licence (50% equity)
“The Precinct”
Strike owned freehold land
West
Erregulla
Erregulla
Deep
Included in AEMO GSOO as required future WA gas supply2
Material, high-quality conventional resource with the ability to
support long-term WA domestic supply
Strike’s independently audited Reserve & Resource estimate
reinforces scale across both licences1
Attractive, value-accretive development options being advanced
StrikeSyntax Warning: Invalid Font Weight
L25 & L26 Kingia Reserves & Resources (50% net to Strike)1,3
1P 2P 3P 1C 2C 3C 1U 2U 3U
Previous L25 (PJ) 162 211 251 9 15 21 - - -
Previous L26 (PJ)4 - - - - - - 105 139 178
L25 (PJ) 179 251 357 4 10 18 19 26 34
L26 (PJ) - - - 27 38 51 88 117 154
Total Net Change (PJ) +17 +40 +106 +22 +33 +48 +2 +4 +10
Total Net Increase 10% 19% 42% 240% 220% 230% 2% 3% 6%
Prospective Resource Estimate Information & Cautionary statement: The estimated
quantities of petroleum that may potentially be recovered by the application of a
future exploration and development project(s) relate to undiscovered accumulations.
This estimate is un-risked, probabilistically determined and has both a risk of
discovery (PoS 51%) and a chance of development (CoD 85%). Further exploration,
appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons.
Euroz Rottnest Conference 2026 | 7
WEST ERREGULLA OVERVIEW
A strategically located, forecast-critical gas resource for WA
Strike Syntax Warning: Invalid Font Weight
Energy 50% (Operator) | Hancock Energy 50%
1. Volumes are net to Strike (50% equity share). Refer to slide 20 for important information relating to reserves and resources estimates.
Project Name: West Erregulla Status: Pre-FID
Location: Perth Basin (L25 & L26) Reserves: 251 PJ 2P / 10 PJ 2C1
West Erregulla
Far North
West Erregulla-3ST2
West Erregulla-5
West Erregulla-2
West Erregulla-4
West Erregulla-1
West Erregulla
Material, high-quality Perth Basin gas resource with
scale to support long-term domestic supply
Independently audited 2P Reserves increased ~20% to
251 PJ1 (net to Strike), reinforcing resource quality and
development potential
L25 Production Licence awarded August 2024 with key
approvals secured
Workstreams advancing to progress commercialisation
pathways with a focus on maximizing value
Sundalara
Natta North
Natta
Euroz Rottnest Conference 2026 | 8
ERREGULLA DEEP OVERVIEW
Natural backfill for Perth Basin infrastructure
Strike Energy 50% (Operator) | Hancock Energy 50%
Material, high-quality gas resource located proximal to
existing and planned Perth Basin infrastructure
Resource supports potential to backfill and complement
broader development across the region
Further appraisal and evaluation activities required to define
scale and development potential
Near-field exploration opportunities, Erregulla Deep North,
Natta, Natta North and Natta East provide material upside
across adjacent Kingia prospects of 117 PJ of 2U Prospective
Resource1
1. Volumes are net to Strike (50% equity share). Refer to slide 20 for important information relating to reserves and resources estimates.
Project Name: Erregulla Deep Status: Pre-FID
Location: Perth Basin (L25 & L26) Resources: 38 PJ 2C1
Natta North Erregulla
Deep North
Natta East
Natta
West Erregulla
Erregulla
Deep
Erregulla Deep-1
Prospective Resource Estimate Information & Cautionary statement: The
estimated quantities of petroleum that may potentially be recovered by the
application of a future exploration and development project(s)Syntax Warning: Invalid Font Weight
relate to
undiscovered accumulations. This estimate is un-risked, probabilistically
determined and has both a risk of discovery (PoS 51%) and a chance of
development (CoD 85%). Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially moveable
hydrocarbons.
Euroz Rottnest Conference 2026 | 9
SOUTH ERREGULLA OVERVIEW
Critical firming infrastructure supporting renewable growth
and coal retirement in WA
On budget and on track for first power by 1 October 2026
Capacity-market-backed revenues strengthened by
increased Benchmark Reserve Capacity Price2 determined
for the 2028/29 capacity year at $488,500/MW/yr (35%
increase)
Ownership of a near-complete, 100%-owned infrastructure
asset provides balance-sheet flexibility and future capital
recycling optionality
1. Refer to slide 20 for important information relating to reserves and resources estimates.
2. https://www.aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem/wa-reserve-capacity-mechanism/benchmark-reserve-Syntax Warning: Invalid Font Weight
capacity-price
Delivering capacity-backed, critical energy infrastructure for WA
Strike Energy 100% (Operator)
Power Station Package complete
Project Name: South Erregulla Status: In construction
85 MW Peaking Gas Power Plant Reserves: 45 PJ 2P / 37 PJ 2C1
Location: Perth Basin (L24) Target on-line date: 1 Oct 2026
Euroz Rottnest Conference 2026 | 10
SOUTH ERREGULLA OPERATIONAL UPDATE
Overall project completion at 82%
Engineering 99.5% complete, procurement 96% complete
and power station package complete
Strong safety performance maintained throughout the
period, with no major HSE incidents recorded during
sustained construction activity
15 km overhead power lines installed from power station to
Western Power owned switch yard
Mechanical completion and gas introduction forecast in Q2
CY26, with targeted commercial operation by 1 October 2026
Pole 52 at KGN Switchyard
Power Station package complete with
powerlines installed
Relay room installed onsite at WP Switchyard
Project Name: South ErregullaSyntax Warning: Invalid Font Weight
Status: In construction
85 MW Peaking Gas Power Plant Reserves: 45 PJ 2P / 37 PJ 2C1
Location: Perth Basin (L24) Target on-line date: 1 Oct 2026
1. Refer to slide 20 for important information relating to reserves and resources estimates.
Euroz Rottnest Conference 2026 | 11
WALYERING OVERVIEW
Established Perth Basin gas production supplying the
Parmelia Gas Pipeline under firm offtake arrangements
Delivered 3.8 PJe of gas and condensate in HY26
Generated $36.0 million in revenue at an average realised
price of ~$7.37/GJ
Low-cost, cash-generating asset
Walyering West-1 to test 46 PJ of 2U Prospective Resource1
Established domestic gas production and infrastructure
Strike Energy 100% (Operator)
Project Name: Walyering Status: Online
Location: Perth Basin (L23) Reserves: 14 PJ 2P/ 17 PJ 2C1
Nameplate Capacity: 33 TJ/day Current Rate: 15 TJ/day2
1. Refer to slide 20 for important information relating to reserves and resources estimates.
2. As at 17 March 2026, subject to change.
Prospective ResourceSyntax Warning: Invalid Font Weight
Estimate Information & Cautionary statement: The
estimated quantities of petroleum that may potentially be recovered by the
application of a future exploration and development project(s) relate to
undiscovered accumulations. This estimate is un-risked, probabilistically
determined and has both an associated a risk of discovery (PoS 25%) and
chance of development (CoD 90%). Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons.
Euroz Rottnest Conference 2026 | 12
WALYERING OPERATIONAL UPDATE
Established domestic gas production and infrastructure
Strike Energy 100% (Operator)
Project Name: Walyering Status: Online
Location: Perth Basin (L23) Reserves: 14 PJ 2P /17 PJ 2C1
Nameplate Capacity: 33 TJ/day Current Rate: 15 TJ/day2
Additional heat exchanger installed, improving facility
efficiency and production reliability
Compression infrastructure delivered; installation
progressing toward mid-2026 start-up in lineSyntax Warning: Invalid Font Weight
with operational
requirements
Currently producing at 15 TJ/day, with improved well and
facility performance increasing confidence in the asset’s
ability to sustain higher production levels
Walyering West-1 advanced to drill ready, with rig secured and
spud targeted for April 2026
1. Refer to slide 20 for important information relating to reserves and resources estimates.
2. As at 17 March 2026, subject to change.
Compressors onsite at Walyering Gas Processing Facility
Euroz Rottnest Conference 2026 | 13
OCEAN HILL OVERVIEW
3D seismic defines multiple exploration and appraisal targets
Improved reservoir continuity vs legacy 2D
Favourable gas quality and proximity to DBNGP and SWIS
infrastructure enable multiple low-cost monetisation pathways
Regulatory approvals received, drill-ready 2H CY 2026
Material exploration upside defined by 3D seismic
Strike Energy 100% (Operator)
Project Name: Ocean Hill Status: Appraisal
Location: Perth Basin (EP 495) Resources: 180 2C / 190 2U1
1. Refer toSyntax Warning: Invalid Font Weight
slide 20 for important information relating to reserves and resources estimates.
Prospective Resource Estimate Information & Cautionary statement: The
estimated quantities of petroleum that may potentially be recovered by the
application of a future exploration and development project(s) relate to
undiscovered accumulations. This estimate is un-risked, probabilistically
determined and has a risk of development. Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons.
Euroz Rottnest Conference 2026 | 14
KADATHINNI OVERVIEW
Large-scale multi-play frontier prospectivity
2D seismic defines >1,000 km² fairway
Material prospective resource potential
Positioned to backfill basin infrastructure
3D seismic planned for early 2027
Frontier exploration with transformational potential
Strike Energy 100% (Operator)
Project Name: Kadathinni Status: Exploration
Location: Perth Basin (EP503 & EP504) Resources: 385Syntax Warning: Invalid Font Weight
2U1
1. Refer to slide 20 for important information relating to reserves and resources estimates.
Kadathinni
(STX 100%)
West Erregulla
(STX 50%)
South Erregulla
(STX 100%)
The Precinct
(STX 100%)
Prospective Resource Estimate Information & Cautionary statement: The
estimated quantities of petroleum that may potentially be recovered by the
application of a future exploration and development project(s) relate to
undiscovered accumulations. This estimate is un-risked, probabilistically
determined and has a risk of development. Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons.
FY26 HALF YEAR
RESULTS
OUTLOOK &
STRATEGIC
PRIORITIES
Euroz Rottnest Conference 2026 | 16
WA ENERGY MARKET UPDATE
1. https://www.aemo.com.au/energy-systems/gas/gas-forecasting-and-planning/wa-gas-statement-of-opportunities-wa-gsoo
2. https://www.aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem/wa-reserve-capacity-mechanism/benchmark-reserve-capacity-price
WA GAS SUPPLY & DEMAND FORECAST 1
GSOO 2025
0
500
1,000
1,500
2026 2030 2035 2040 2045
Domestic Gas Demand Supply - anticipated Supply - existing and committed
PJ
Energy Transition and Supply Decline Driving the Need for Reliable Domestic Gas Investment
0
90
180
270
360
450
Capacity Year
SE Online
Historical / Actual RCP
2026 2028
2024
2022
2020
2018
RESERVE CAPACITY PRICE (RCP) 2
($000s/MW/YEAR)
Near-term domestic gas market remains broadly balanced through 2027
Supply gaps forecast to emerge from 2030, growing towards ~500 TJ/day
by 2045 inclusive of “anticipated” supply which includes West Erregulla
Driven by declining production from existing fields and rising power-sector
demand
Requirement for urgent new firm capacity reflected in increasing RCP
Pinjar Power Station (576 MW gas fired) will retire units in the early 2030’s
Coal-fired generation modelled to retire between 2027–2029
Collie Power Station & Muja D retiring in Oct 2027 & Oct 2029
Bluewaters Power StationSyntax Warning: Invalid Font Weight
modelled unavailable from October 2028
Historical Benchmark RCP
Draft Benchmark RCP (subject to change)
Euroz Rottnest Conference 2026 | 17
2026 Q1 2026 Q2 2026 Q3 2026 Q4
2026 NEAR-TERM VALUE INFLECTION POINTS
Building Momentum Through 2026
Walyering
West-1
Spud
South Erregulla
2028/29 Benchmark
Reserve Capacity Price
Finalised
• Draft BRCP finalised at
$488,500/MW/yr
South Erregulla
Peaking Power Plant
Practical Completion
South Erregulla
Peaking Power Plant
Online
West Erregulla &
Erregulla Deep
Audited Reserves
& Resources
Update
West Erregulla
STX Target Final
Investment Decision
South Erregulla
2028/29 Reserve
Capacity Price
Announced
Walyering
West-1
Test
(contingent)
All dates are indicative and subject to change. Where they pertain to West Erregulla and Erregulla Deep, are subject to
finalisation of West Erregulla downstream arrangements, pre-FID activity procurement timelines, financing and JV processes.
2027 Q1
Euroz Rottnest Conference 2026 | 18
2026 STRATEGIC PRIORITIES
Focussed on advancing Syntax Warning: Invalid Font Weight
a multi-asset Perth Basin gas platform to unlock long-term shareholder value
Positioning Strike as a trusted independent gas
explorer & developer in Western Australia
Deliver South Erregulla Power Project on time and on budget
Optimise Walyering production profile
Maintain disciplined cost base
Sanction West Erregulla Development Pathway
Maintain exploration pipeline to enable long-term portfolio growth
Euroz Rottnest Conference 2026 | 19
ASXSTX
POWERING PROGRESS
FOR THE ENERGY TRANSITION
Euroz Rottnest Conference 2026 | 20
Reservesand ResourcesEstimates
Information in this presentation relating to the Reserve and Resource Estimates for:
• The West Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 18 March
2026 entitled “West Erregulla and Erregulla Deep Reserves and Resources Statement”. Strike Energy
interest is 50%. The estimates, classification and risking presented are Strike evaluated and independently
audited by Miller & Lents, Ltd. and have not been evaluated or audited for or on behalf of the Joint Venture;
• the South Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 24 June
2024 entitled “South Erregulla Reserves”. Strike Energy interest is 100%;
• the Walyering Reserve and Resource estimate is set out in ASX announcement dated 19 August 2025
entitled "Walyering Reserves Update and Resulting Impairment". Strike 's equity interest is 100%;
• the Ocean Hill 2C Contingent Resource and 2U Prospective Resource is set out in ASX announcement
dated 27 August 2025 entitled "Ocean Hill Resource Update". Strike’s equity interest is 100%;
• the Kadathinni 2U Prospective Resource estimate is set out in ASX announcement dated 7 May 2025
entitled “Exploration Update". Strike’s equity interest is 100%;
The above announcements are available to view on Strike Energy's website at www.strikeenergy.com.au.
Strike confirms that, as at the date of this report, it is not aware of any new information or data that materially
affects the information contained in the referenced announcements, and that all material assumptions and
technical parameters underpinning those estimates continue to apply.
These reserves and resources estimates must be read in conjunction with the full text of the ASX releases
referred to. The Reserves and Resources are unrisked.
Forward looking statements
This presentation contains forward looking statements about Strike. Often, but not always, forward looking
statements can be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”,
“plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without
limitation, statements in this presentation regarding intent, belief, expectations, plans, strategies and
objectives of management, indications of and guidance on synergies, future earnings or financial position or
performance, future acquisitions, anticipated production rates or construction commencement dates, costs or
production outputs for each of Strike and the future operation of Strike. Strike does not make any
representation or warranty as to the currency, accuracy, reliability or completeness of any forward-looking
statements contained in this presentation.
To the extent that this presentation materials contains forward looking information, the forward-looking
information is subject to a number of risks, including those generally associated with the gas industry more
broadly.
Any such forward looking statement inherently involves known and unknown risks, uncertainties and other
factors that may cause actual results, performance and achievements to be materially greater or less than
estimated. These may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuations and general economic conditions, increased costs and demand for production inputs, the
speculative nature of exploration and project development (including the risks of obtaining necessary licenses
and permits and diminishing quantities or grades of reserves), political and social risks, changes to the
regulatory framework within which Strike operate or may in the future operate, environmental conditions
including extreme weather conditions, geological and geotechnical events, and other environmental issues,
the recruitment and retention of key personnel, industrial relations issues, litigation and outbreaks of disease
or pandemics (including the continuation or escalation of the global COVID-19 pandemic).
Any such forward looking statements are based on assumptions, qualifications and contingencies which are
subject to change and which may ultimately prove to be materially incorrect, as are statements about market
and industry trends, which are based on interpretations of current market conditions. Investors should
consider any forward-looking statements contained in this presentation in light of such matters (and their
inherent uncertainty) and not place reliance on such statements. Forward looking statements are not
guarantees or predictions of future performance and may involve significant elements of subjective judgment,
assumptions as to future events that may not be correct, known and unknown risks, uncertainties and other
factors, many of which are outside the control of Strike. Any forward-looking statements are based on
information available to Strike as at the date of this presentation. Refer to the risk factors starting on page 31 of
the FY25 Annual Report for a summary of certain general and Strike Energy specific risk factors that may
affect Strike Energy. There can be no assurance that actual outcomes will not differ materially from these
statements. Investors should consider the forward looking statements contained in this presentation in light of
those disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike
Share your feedback
Discover