▪ Talon and Strike have executed a restated and amended scheme implementation deed on 10
October 2023(“Revised SID”) to reflect and enable the proposed transaction with TMK Energy
as described in a separate public release made by Talon today.
▪ The Directors of Talon unanimously recommend that Talon shareholders vote in favour of the
Strike scheme in the absence of a Superior Proposal (as defined in the Revised SID) and subject
to the Independent Expert concluding and continuing to conclude in its final Independent
Expert’s report that the revised Scheme is in the best interests of Talon shareholders.
▪ Details of the recommendation, commitment to vote in favour and a copy of the independent
expert report will be included in a Scheme Booklet expected to be provided to shareholders in
November 2023.
Amended and restated Scheme Implementation Deed with Strike
Talon Energy Limited (ASX: TPD) (“Talon” or the “Company”) and Strike Energy Limited (ASX: STX) (“Strike”)
have executed a restated and amended scheme implementation deed on 10 October 2023 (“Revised SID”) to
reflect and enable the proposed Transaction with TMK as described in a separate public release made by Talon
today.
Other than certain minor amendments to allow for the proposed transaction with TMK, the Revised SID is in
substantially the same form as the original scheme implementation deed released to the market on 14 August 2023.
There is no change to the consideration payable under the Scheme following this Revised SID.
Please refer to the separate Talon announcement made today regarding the proposed transaction with TMK.
A full copy of the Revised SID, including all applicable conditions, is attached to this announcement in Annexure A.
Talon Board Recommendation
The Board of Talon unanimously recommends that Talon shareholders vote in favour of the Scheme, in the absence
of a superior proposal and subject to the independent expert (appointed by Talon) concluding, and continuing to
conclude, that the Scheme is in the best interests of Talon shareholders1.
1
You should note when considering this recommendation that:
Talon Energy Ltd. ABN 88 153 229 086
1202 Hay Street, West Perth WA 6005
www.talonenergy.com.au
ASX: TPD
PAGE 1 OF 3
11 OCTOBER 2023
Each of the directors of Talon has committed to vote in favour of the Scheme in respect of the shares they control in
the absence of a superior proposal and subject to the independent expert concluding, and continuing to conclude,
that the Scheme is in the best interests of Talon shareholders.
Details of the recommendation, commitment to vote in favour and a copy of the independent expert report will be
included in a Scheme Booklet expected to be provided to shareholders in November 2023.
Timetable
Talon shareholders do not need to take any action at this time.
Talon shareholders will be asked to approve the Scheme at the scheme meeting which is expected to be held in
December 2023 (“Scheme Meeting”). A scheme booklet containing information relating to the Scheme, the reasons
for the Talon Directors’ recommendation, the Independent Expert’s Report and details of the Scheme Meeting will
be dispatched to Talon shareholders in November 2023.
Talon note that Talon shareholders will also be asked to approve the TMK Transaction (50% approval threshold) at an
extraordinary general meeting (“EGM”), which is expected to take place in late November 2023, and which will be
separate to any scheme meeting convened in accordance with the Revised SID.
Talon’s financial advisers are Sternship Advisers and RBC Capital Markets, and its legal adviser is Steinepreis Paganin.
This announcement has been approved and authorised for release by the Board of Talon Energy Limited.
For further information, please contact:
Talon Energy Limited
Talon Energy Limited
Colby Hauser
Shannon Coates
Managing Director and CEO
Company Secretary
+61 8 6319 1900
+61 8 6319 1900
info@talonenergy.com.au
info@talonenergy.com.au
Greg Columbus (Non-Executive Chairman) and his associates have an interest in 2,413,794 fully paid ordinary shares, 2,000,000 Talon performance rights (which, subject to the Scheme becoming Effective, are expected to
be vested and exercised in full) and 2,000,000 Talon unlisted options (which may be vested in full or cancelled, at the Talon Board's discretion and subject to agreement with the counterparty, in connection with the
Scheme). Greg Columbus and his associates also have an interest in 31,080,954 fully paid Strike shares;
•
David Casey (Non-Executive Director) and his associates have an interest in 10,381,896 fully paid ordinary shares and 2,000,000 unlisted Talon options (which may be vested in full or cancelled, at the Talon Board's discretion
and subject to agreement with the counterparty, in connection with the Scheme). David Casey and his associates also have an interest in 1,675,619 fully paid Strike shares;
•
Colby Hauser (Managing Director and CEO) and his associates have an interest in 6,033,742 fully paid ordinary shares and 5,000,000 Talon performance rights (which, subject to the Scheme becoming Effective are
expected to be vested and exercised in full); and
•
Matthew Worner (Non-Executive Director) and his associates have an interest in 2,076,667 fully paid ordinary shares and 2,000,000 Talon unlisted options (which may be vested in full or cancelled, at the Talon Board's
discretion and subject to agreement with the counterparty, in connection with the Scheme).
These arrangements and the amounts payable on implementation of the Scheme to each of the directors, will be described in more detail in the Scheme Booklet. Despite their interest in the outcome of the Scheme, each Director
considers that, given the importance of the Scheme, and their roles as a Talon Director, it is important and appropriate for them to provide a recommendation in relation to voting on the Scheme.
•
Talon Energy Ltd. ABN 88 153 229 086
1202 Hay Street, West Perth WA 6005
www.talonenergy.com.au
ASX: TPD
PAGE 2 OF 3
11 OCTOBER 2023
Annexure A: Amended and restated Scheme Implementation Deed with Strike
Talon Energy Ltd. ABN 88 153 229 086
1202 Hay Street, West Perth WA 6005
www.talonenergy.com.au
ASX: TPD
PAGE 3 OF 3
EXECUTION VERSION
Project Lancelin
Amendment and Restatement Deed
Strike Energy Limited
Talon Energy Limited
Dated
10 October 2023
DLA Piper Australia is part of DLA Piper, a global law firm, operating through various separate and distinct legal entities.
A list of offices and regulatory information can be found at dlapiper.com
Contents
PARTIES ................................................................................................................................................. 1
BACKGROUND ...................................................................................................................................... 1
AGREED TERMS ................................................................................................................................... 2
1
Definitions and Interpretation ..................................................................................................... 2
2
Condition Precedent................................................................................................................... 2
3
Amendment and restatement ..................................................................................................... 3
4
Governing law and jurisdiction ................................................................................................... 3
5
Counterparts .............................................................................................................................. 3
SIGNATURE PAGE ................................................................................................................................ 4
Appendices
APPENDIX 1 AMENDED SCHEME IMPLEMENTATION DEED
Amendment and Restatement Deed | AUM/1229278411.3
DLA Piper
This deed is made on
10 October 2023
Parties
Strike
Name
ACN
Address
Email
Attention
Strike Energy Limited
078 012 745
Level 1, 40 Kings Park Road West Perth WA 6005
stuart.nicholls@strikeenergy.com.au and lucy.gauvin@strikeenergy.com.au
Stuart Nicholls and Lucy Gauvin
Talon
Name
ACN
Address
Email
Attention
Talon Energy Limited
153 229 086
1202 Hay Street West Perth WA 6005
colby.hauser@talonenergy.com.au and greg@discol.net
Colby Hauser and Greg Columbus
Background
A
On 13 August 2023 the parties entered into the Scheme Implementation Deed.
B
The parties have agreed to amend and restate the terms of the Scheme Implementation Deed
on the Effective Time on the terms set out in this deed.
Amendment and Restatement Deed | KJH/KJH/432818/24/AUM/1229278411.3
DLA Piper 1
Agreed terms
1
Definitions and Interpretation
Definitions
1.1
In this deed the following definitions apply:
Amended Scheme Implementation Deed means the Scheme Implementation Deed as
amended in the form set out in schedule to this deed.
Condition Precedent means the condition precedent detailed in clause 2.1.
Cut Off Date means 13 October 2023.
Effective Date means the date the Condition Precedent is satisfied.
Scheme Implementation Deed means the Scheme Implementation Deed dated 13 August
2023 between the parties to this deed.
Transaction Document means the binding heads of agreement between, amongst others,
Talon and TMK Energy Limited.
Interpretation
1.2
2
In this deed unless the context otherwise requires:
(a)
terms defined in the Scheme Implementation Deed have the same meanings when
used in this deed (unless the same are otherwise defined in this deed); and
(b)
clauses 1.2 to 1.9 of the Scheme Implementation Deed applies to this deed as if set
out in full in this deed and all references to "this deed" were references to this deed.
Condition Precedent
Condition Precedent
2.1
Clause 3 is not binding on the parties and is of no effect unless and until Talon provides Strike
with copies of the duly executed Transaction Document in the form agreed with Strike in
writing prior to execution.
Benefit of Condition Precedent
2.2
The Condition Precedent is for the benefit of Strike and can only be waived by Strike in
writing.
Failure to satisfy Condition Precedent
2.3
If the Condition Precedent is not satisfied or waived on or before the Cut Off Date, Strike may
terminate this deed by notice in writing to Talon, in which case:
(a)
no amendments will be made to the Scheme Implementation Deed; and
(b)
all terms and conditions of the Scheme Implementation Deed remain in full force and
effect.
Amendment and Restatement Deed | KJH/KJH/432818/24/AUM/1229278411.3
DLA Piper 2
3
Amendment and restatement
Amendment
3.1
The parties agree that the Scheme Implementation Deed is amended with effect on and from
the Effective Date by:
(a)
inserting the words and figures that are underscored by adding new clauses or
provisions;
(b)
deleting the words and figures that are struck-out; and
(c)
otherwise amending existing clauses or provisions by inserting the words and figures
shown in underscored text or deleting the words and figures shown that are struckout,
as the case may be and in the manner as set out in Appendix 1, with the effect that the
Scheme Implementation Deed is amended and restated with effect on the Effective Date to
read in the manner as set out in Appendix 1, with such amendments made.
Effect of amendment
3.2
Except as expressly amended and restated by this Deed, no changes to the Scheme
Implementation Deed are to be inferred or implied, and in all other respects the Scheme
Implementation Deed remains in full force and effect.
3.3
Clause 3.1 does not affect any right or obligation of either party that arises before the
Effective Date.
3.4
With effect on and from the Effective Date, the Scheme Implementation Deed will be read and
construed as amended and restated by this Deed including Appendix 1.
4
Governing law and jurisdiction
4.1
This Deed is governed by the laws of Western Australia. In relation to it and related noncontractual matters each party irrevocably submits to the non-exclusive jurisdiction of courts
with jurisdiction there, and waives any right to object to the venue on any ground.
5
Counterparts
5.1
This Deed may be executed in any number of counterparts. All counterparts together will be
taken to constitute one instrument.
Amendment and Restatement Deed | KJH/KJH/432818/24/AUM/1229278411.3
DLA Piper 3
Signature page
Executed as a deed.
Executed by Strike Energy Limited ACN 078
012 745 acting by the following persons or, if the
seal is affixed, witnessed by the following
persons in accordance with s127 of the
Corporations Act 2001:
Signature of director
______
Signature of director/company
secretary
Stuart Nicholls
................................
Name of director (print)
. . . . .Justin
. . . . .Ferravant
......................
______
Name of director/company
secretary (print)
Executed by Talon Energy Limited ACN 153
229 086 acting by the following persons or, if the
seal is affixed, witnessed by the following
persons in accordance with s127 of the
Corporations Act 2001:
Signature of director
Signature of--------director/company secretary
. . . Colby
. . . . . . Hauser
.......................
Name of director (print)
. .Joan
. . . . . Dabon
.........................
Name of --------director/company secretary (print)
Amendment and Restatement Deed | KJH/KJH/432818/24/AUM/1229278411.3
DLA Piper 4
Appendix 1 Amended Scheme Implementation Deed
Amendment and Restatement Deed |
DLA Piper
EXECUTION VERSION
Project Lancelin
Amended and Restated Scheme
Implementation Deed
Strike Energy Limited
Talon Energy Limited
Dated
13 August 2023
Amended and Restated on 10 October 2023
DLA Piper Australia is part of DLA Piper, a global law firm, operating through various separate and distinct legal
entities.
A list of offices and regulatory information can be found at dlapiper.com
Contents
PARTIES
1
BACKGROUND
1
AGREED TERMS
1
1
Interpretation
1
2
Scheme of Arrangement
1516
3
Conditions Precedent
17
4
Scheme and Scheme Consideration
5
Transaction Steps
24
6
DemergerDisposal of Mongolian Project
31
7
Board Recommendation
3335
8
Conduct of Business
3536
9
Representations, Warranties and Undertakings
3940
10
Releases, Insurance and Indemnification
4143
11
Exclusivity
4345
12
Break Fee
4749
13
Reverse Break Fee
5052
14
Termination
5254
15
Announcements
5557
16
Confidentiality
5557
17
Payments
5759
18
Goods and Services Tax
5860
19
Notices
5961
20
General
6062
21
Governing Law and Jurisdiction
6163
SIGNATURE PAGE
1921
7981
SCHEDULES
SCHEDULE 1 TALON THRESHOLD EVENTS
6365
Part 1 Talon Material Adverse Change
6365
Part 2 Talon Prescribed Occurrences
6466
Part 3 Talon Regulated Events
6466
SCHEDULE 2 STRIKE THRESHOLD EVENTS
6769
Part 1 Strike Material Adverse Change
6769
Part 2 Strike Prescribed Occurrences
6870
Part 3 Strike Regulated Events
6870
SCHEDULE 3 TALON WARRANTIES AND UNDERTAKINGS
7072
Part 1 Talon Warranties
7072
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper
Part 2 Talon Undertakings
7274
SCHEDULE 4 STRIKE WARRANTIES AND UNDERTAKINGS
7476
Part 1 Strike Warranties
7476
Part 2 Strike Undertakings
7678
SCHEDULE 5 TALON AND STRIKE ISSUED CAPITAL
7779
Part 1 Talon Issued Capital
7779
Part 2 Strike Issued Capital
7779
SCHEDULE 6 TIMETABLE
7880
APPENDICES
APPENDIX 1 SCHEME
APPENDIX 2 DEED POLL
APPENDIX 3 STRIKE ANNOUNCEMENT
APPENDIX 4 TALON ANNOUNCEMENT
APPENDIX 5 CONDITIONS PRECEDENT CERTIFICATE
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper
This deed is made on
13 August 2023 and was amended and restated on 10 October 2023
Parties
Strike
Name
ACN
Address
Email
Attention
Strike Energy Limited
078 012 745
Level 1, 40 Kings Park Road West Perth WA 6005
stuart.nicholls@strikeenergy.com.au and lucy.gauvin@strikeenergy.com.au
Stuart Nicholls and Lucy Gauvin
Talon
Name
ACN
Address
Email
Attention
Talon Energy Limited
153 229 086
1202 Hay Street West Perth WA 6005
colby.hauser@talonenergy.com.au and greg@discol.net
Colby Hauser and Greg Columbus
Background
A
The parties have proposed that Strike will acquire all of the ordinary shares in Talon by means
of a scheme of arrangement under Part 5.1 of the Corporations Act between Talon and the
Scheme Shareholders.
B
The parties have agreed to propose and, if approved, implement the scheme of arrangement
of the terms of this deed.
Agreed terms
1
Interpretation
Definitions
1.1
In this deed the following definitions apply:
Adverse Decision means an order of Court where the Court does not make any order sought
by Talon under clause 5.8(m).
Anti-Corruption Laws means all applicable anti-bribery and anti-corruption laws and
regulations, including the U.S. Foreign Corrupt Practices Act of 1977, the U.K. Bribery Act
2010, the Australian Criminal Code Act 1995 (Cth), Criminal Code of Mongolia (2002),
Anti-Corruption Law of Mongolia (2006), laws implementing the Organization for Economic
Cooperation and Development Convention on Combating Bribery of Foreign Public Officials in
International Business Transactions, or the rules and regulations promulgated thereunder, or
any other applicable law, rule, or regulation of similar effect in other jurisdictions.
ASIC means the Australian Securities and Investments Commission.
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper | 1
ASIC Review Booklet means the draft of the Scheme Booklet which is provided to ASIC:
(a)
for approval pursuant to section 411(2) of the Corporations Act; and
(b)
for ASIC’s review pursuant to ASIC Regulatory Guide 60.
Associate has the meaning given in section 12(2) of the Corporations Act.
ASX Listing Rules means the official listing rules of ASX as modified by any waiver
instrument executed by ASX that applies to Talon.
ASX means ASX Limited ABN 98 008 624 691 or the Australian Securities Exchange, as the
context requires.
ATO means the Australian Tax Office.
Authorisation means any permit, licence, consent, approval, registration, accreditation,
certification or other authorisation given or issued by any Government Agency.
BidCo means a wholly owned subsidiary of Strike nominated in accordance with clause 2.4.
Break Fee means $1,422,228 plus GST, if applicable.
Break Fee Arrangements means the amount of the Break Fee or the circumstances in which
it is to be paid in accordance with clause 12.
Budget means the final budget prepared in connection with any financial accommodation to
be provided by Strike to the Talon Group on or after the date of this deed.
Business Day means a day (other than a Saturday, Sunday or public holiday) on which banks
are generally open in Perth, Australia for normal business.
Cash Out Shareholder means a Scheme Shareholder (not being an Ineligible Foreign
Shareholder) who, based on their holding of Scheme Shares on the date of the Scheme
Booklet, would, on implementation of the Scheme, be entitled to receive less than a
marketable parcel of New Strike Shares (assessed by reference to the last traded price of
Strike Shares on ASX on the trading day prior to the date of the Scheme Booklet).
Certificate means the certificate of conditions precedent in the form attached in Appendix 5.
Claim means any claim, demand, legal proceedings or cause of action including any claim,
demand, legal proceedings or cause of action:
(a)
based in contract (including breach of any warranty);
(b)
based in tort (including misrepresentation or negligence);
(c)
under common law or equity; or
(d)
under statute.
Commissioner means the Federal Commissioner of Taxation of Australia.
Combined Business means:
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper | 2
(a)
all of the businesses, operations and activities undertaken by, or on behalf of, the
Combined Group anywhere in the world at any time prior to the Implementation Date;
and
(b)
any other businesses, operations and activities that may be undertaken by, or on
behalf of, the Combined Group anywhere in the world from time to time following the
Implementation Date, excluding the Talon Mongolia Business.
Combined Group means Strike and its Subsidiaries, following the Implementation Date
(including, for the avoidance of doubt, the Talon Group and excluding, for the avoidance of
doubt, the Talon Mongolia Group).
Competing Proposal means, other than the DemergerMongolian Disposal, any proposed
offer, proposal, transaction, or arrangement whether by way of takeover bid, scheme of
arrangement, reverse takeover, capital reduction, sale or licence of assets, sale of securities,
strategic alliance, joint venture, partnership, dual listed companies structure, economic or
synthetic merger or combination or other transaction or arrangement which, if completed,
would result in a Third Party:
(a)
directly or indirectly acquiring or being entitled to acquire a Relevant Interest or any
other direct or indirect interest in more than 20% of the Talon Shares or more than
20% of the shares in any other member of the Talon Group whose assets represent
20% or more of the total consolidated assets of the Talon Group;
(b)
directly or indirectly acquiring or being entitled to acquire the whole of the business or
assets of the Talon Group or any part of the business or assets of the Talon Group
that represents 20% or more of the total consolidated assets of the Talon Group;
(c)
directly or indirectly acquiring the Talon Group’s interest in the Key Licences; or
(d)
acquiring Control of Talon or merging or amalgamating with Talon or any other
member of the Talon Group that represents 20% or more of the total consolidated
assets of the Talon Group,
or which would otherwise require Talon to abandon, or otherwise fail to proceed with, the
Scheme.
Condition means each condition set out in the first column of the table in clause 3.1.
Condor Option Agreement means the binding acquisition agreement, dated 17 March 2021,
between Talon (Aust) Pty Ltd, Talon and Macallum Group Limited.
Confidential Information means confidential information that is made available by or on
behalf of a party to the other party (whether directly or indirectly, and whether before, on or
after the date of this deed) and relates to that party (or any Related Entity of it) or any part of
the business, assets or affairs of the party (or any Related Entity of it), including:
(a)
commercial, financial, legal and technical information and know-how (including
forecasts and projections); or
(b)
information which is derived or produced wholly or partly from any information that is
Confidential Information by virtue of this definition by or on behalf of the party or any
person (including a Representative) to whom it has made such information available
including an analysis, note, calculation, report, conclusion or summary.
Constitution means the constitution of Talon, as amended.
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper | 3
Control has the meaning given in section 50AA of the Corporations Act disregarding section
50AA(4) of the Corporations Act.
Corporations Act means the Corporations Act 2001 (Cth).
Corporations Regulations means Corporations Regulations 2001 (Cth).
Counterproposal means Strike’s offer to amend the terms of the Scheme or make an
alternative proposal to Talon or Shareholders with a view to providing an equivalent or a
superior outcome for Shareholders than that offered under the relevant Competing Proposal.
Court means the Federal Court of Australia, Western Australian Division.
D&O Run Off Policy means the directors’ and officers’ run-off insurance policy in respect of
any members of the Talon Board and relevant former directors and officers of any member of
the Talon Group that applies for no less than a 7 year period following the Implementation
Date.
Deductible Amounts means the aggregate of the following (without duplication):
(a)
any incurred but unpaid DemergerMongolian Disposal Costs as at the Demerger
ImplementationMongolian Disposal Completion Date; and
(b) any financial accommodation made available by a member of the Talon Group (excluding
a member of the Talon Mongolia Group) to any member of the Talon Mongolia Group
or otherwise for the benefit of the Talon Mongolia Business on or after 28 July 2023;
and
(b)
(c) any amount paid or payable to a financial adviser engaged by a member of the
Talon Group in respect of the Transaction in excess of the Financial Adviser Fee Cap.
Deed Poll means the deed poll to be entered into by Strike in favour of the Scheme
Shareholders in the form attached at Appendix 2 or in such other form as the parties agree in
writing.
Demerger means a pro rata distribution in-specie of the shares in the ultimate holding
company of the Talon Mongolia Group with a view to conferring directly on Shareholders
100% of the value and obligations of the Demerger Assets, but excludes the Transaction.
Demerger Assets means:
(a) the Talon Mongolia Group and all of their assets including the Mongolian Project; and
(b) the Demerger Cash Amount (if greater than nil).
Demerger Booklet means the notice of meeting, explanatory memorandum and, only if
required, the related prospectus to be prepared by Talon and issued to Shareholders in
respect of the resolution of Shareholders approving the Demerger for the purposes of section
256C of the Corporations Act and for all other purposes, in accordance with all applicable
laws.
Demerger Cash Amount means $850,000 less the aggregate of the Deductible Amounts.
Demerger Costs means all costs incurred by the Talon Group in connection with preparations
for and the giving effect to the Demerger, being costs that would not have been incurred but
for the Demerger (and the actions necessarily or reasonably taken in preparation for or in
connection with the Demerger) including advisor costs (tax, legal and financial) and Tax and
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper | 4
Duty, taking into account the utilisation of Talon’s tax attributes including Tax losses as
required by Tax law, in respect of the Demerger.
Demerger Documents means the transaction documents required to give effect to the
Demerger.
Demerger Implementation Date means the date on which the Demerger is implemented in
accordance with the Demerger Documents.
Disclosed means fairly disclosed by the relevant party in such manner that an independent
party in the same position as the other party would reasonably be expected to realise and
understand the nature, context, substance, importance and materiality of that information.
Distribution includes any dividend, capital return, shareholder loan repayment, payment or
other distribution of any kind.
Dongara Farm-In Agreement means the binding farm in agreement dated 28 February 2023,
between Triangle Energy Onshore Pty Ltd, Key Petroleum (Australia) Pty Ltd, Talon (L7) Pty
Ltd and Talon (EP437) Pty Ltd, pursuant to which Talon will farm into a 25% participating
interest in L7 and EP437.
Dongara Joint Operating Agreements means:
(a)
the joint operating agreement dated 31 March 2023, between Talon (L7) Pty Ltd, Key
Petroleum (Australia) Pty Ltd, NZOG Acacia Pty Ltd relating to L7; and
(b)
the joint operating agreement dated 31 March 2023, between Key Petroleum
(Australia) Pty Ltd, Key Midwest Pty Ltd, Triangle Energy (EP457) Pty Ltd, Talon
(EP437) Pty Ltd and NZOG Compass Pty Ltd relating to EP437.
Dongara Payment Event means an obligation of Talon to make a payment of an amount in
addition to those set out in the Budget pursuant to a validly arising obligation pursuant to an
express term of the Dongara Joint Operating Agreements or the Dongara Farm-In Agreement.
Duty means any stamp, transaction or registration duty or similar charge imposed by any
Government Agency and any penalty, fine, interest or additional charge payable in relation to
any such duty or charge, but excludes any Tax.
Effective means the coming into effect pursuant to section 411(10) of the Corporations Act of
the order of the Court made under section 411(4)(b) in relation to the Scheme, but in any
event at no time before an office copy of the order of the Court is lodged with ASIC.
Effective Date means the date the Scheme becomes Effective.
Encumbrance means any security interest (within the meaning of section 51A of the
Corporations Act) and any option, right to acquire, right of pre-emption, assignment by way of
security, trust arrangement for the purpose of providing security, retention arrangement or
other security interest of any kind, and any agreement to create any of the foregoing.
End Date means the date that is 6 months after the date of this deed, or such later date as
the parties agree in writing.
Equivalent Insurer means an insurer that has a rating that is the same as, or better than, the
rating of the insurer(s) for the Talon Directors’ and officers’ insurance policy in place as at the
date of this deed.
Scheme Implementation Deed | AUM/1228875919.18
DLA Piper | 5
Excluded Shares means any Talon Shares held by any person on behalf of or for the benefit
of any member of the Strike Group.
Exclusivity Period means the period starting on the date of this deed and ending on the first
to occur of:
(a)
termination of this deed;
(b)
the Implementation Date; and
(c)
the End Date.
Financial Adviser Fee Cap means the amount agreed between the parties in writing on or
about the date of this deed.
First Court Date means the first day on which the application is made to the Court for an
order under section 411(1) of the Corporations Act approving the convening of the Scheme
Meeting is heard or, if the application is adjourned for any reason, the first day on which the
adjourned applica
Share your feedback
Discover