Walyering Reserves Update and Resulting Impairment
Released
Released
Announcement PDF
19th August 2025
ASX: STX The Company Announcement Officer ASX Ltd via electronic lodgement
Walyering Reserves & Resources Update and
Resulting Impairment
•
Annual review of Reserves and Resources at the Walyering gas field has been
completed and as announced on 22 July 2025, has resulted in a Reserves
downgrade.
•
Independent petroleum consultants RISC Advisory report 11.2 PJ of 1P Sales Gas
Reserves (1 July 2024: 23.2 PJ) and 13.6 PJ of 2P Sales Gas Reserves (1 July 2024:
38.5 PJ) after accounting for FY25 production of 8.9 PJ.
•
Strike has identified 1U (low estimate) Prospective Resource of 13 PJ and 2U (best
estimate) Prospective Resource of 46 PJ at the near-field exploration prospect
Walyering West.
•
Initial assessments indicate a resulting impairment of oil & gas assets of between
A$85m to A$108m and an impairment of deferred tax assets of A$19m.
Strike Energy Limited (Strike - ASX: STX) provides an update on the Reserves and Resources at
the producing Walyering gas field in L23 (100% net to STX).
Last financial year (FY25), Strike produced ~8.9 PJ of sales gas from the Walyering gas field,
generating $72.7 million in gross sales revenue, in line with expectations.
Strike has completed its annual Reserves and Resources review following FY25 production,
which included the first year of Walyering-7 production. As foreshadowed in Strike’s ASX release
on 22 July 2025, RISC Advisory Pty Ltd (RISC) has assessed a downward Reserves revision
(compared to 1 July 2024) based on production data from FY25. The updated Reserves and
Contingent Resources for the Walyering field as of 1 July 2025 are outlined in the table below.
Walyering Net Reserves & Resources (100% net to Strike)
1P
2P
3P
1C
2C
3C
Sales Gas (PJ)
23.2
38.5
58.3
11.2
15.6
19.1
Condensate (MMstb)
0.2
0.5
1.0
0.1
0.1
0.2
Less Sales Gas Production (PJ)
-8.9
-8.9
-8.9
-
-
-
Sales Gas (PJ)
-3.1
-16.0
-28.8
2.2
1.1
1.5
Condensate (MMstb)
-0.1
-0.3
-0.7
-
-
-
Sales Gas (PJ)
11.2
13.6
20.6
13.4
16.7
20.6
Condensate (MMstb)
0.1
0.1
0.2
0.1
0.1
0.2
RISC 2024
Revisions:
RISC 2025
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 8 7099 7400
E: strike@strikeenergy.com.au
Level 1, 40 Kings Park Road
West Perth WA 6005
1
The Reserves revisions primarily arise from longer term production data from the Walyering-5
well, which has firmed up the connected gas in-place to be closer to the 1P interpretation and
thereby significantly decreased the 2P and 3P volumes. Production performance of the
Walyering-7 well has not met expectations, with results to date indicating very poor productivity
and low connected volumes within the compartment. The well is currently shut-in awaiting
compression which is expected to be online in Q1 CY2026.
The uplift in Contingent Resources is associated with reallocation of some Walyering 7 Reserves
volumes to Contingent Resources.
Refer to the Important Notices section of this release for further details.
Walyering West
Strike intends to drill the Walyering West-1 near-field exploration well in 1H CY2026 1 subject to
independent peer review regarding well location and prospectivity. Walyering West is located
within L23, 100% owned and operated by Strike. Strike has identified prospectivity in the
Cattamarra Coal Measures, analogous to that seen at the Walyering-5 well location (refer Figure
1 below). Strike’s internal Prospective Resource estimates are outlined on the following page.
Figure 1: Depth structure map (mTVDSS) showing Walyering gas field and adjacent near-field
exploration prospect Walyering West
1
Subject to rig procurement and any required financier consents.
2
Walyering West Prospective Resources (100% net to Strike)
Best Estimate
High Estimate
Low Estimate
1U
2U
3U
Gross
Gross
Gross
Cattamarra Coal Measures
OGIP (bcf)
18
63
184
Net Sales Gas (PJ)
13
46
137
Prospective Resource Estimate Information & Cautionary statement: The above estimated quantities
of petroleum that may potentially be recovered by the application of a future exploration and
development project(s) relate to undiscovered accumulations. These estimates are un-risked,
probabilistically determined, and have both an associated chance of discovery of 26% and a chance of
development estimated to be 90%. Further exploration, appraisal and evaluation is required via drilling
and testing to determine the existence of a significant quantity of potentially moveable hydrocarbons. The
timing of this activity is scheduled for 1H CY2026, subject to rig procurement, any required financier
consents, and the outcome of an independent peer review. Volumes are stated in gross with 100% net to
Strike. The estimates have been compiled using Strike’s seismic mapping and reservoir/resource
parameters common with the existing Reserves estimates in the Walyering region, which includes a BCF
to PJ conversion of 1.13 and 1.4% condensate shrinkage plus cold vent gas and 2.2% fuel gas post
compression. The Prospective Resource estimates are as at 18 August 2025 and have been estimated in
accordance with the definitions and guidelines of the Petroleum Resources Management System 2018,
published by the Society of Petroleum Engineers (SPE PRMS).
Under its current firm Gas Supply Agreements 2, Strike has approximately 24 PJ of contracted
gas that remains to be supplied, which represents a potential shortfall (against the RISC 2025
assessment) of ~9.5 PJ on a 2P basis or ~13 PJ on a 1P basis. To mitigate this potential shortfall
(which is expected to start impacting the rate of delivery from late FY26), Strike plans to drill the
Walyering West near-field exploration prospect 3 and purchase gas on market as required.
Strike is assessing the impact of the Reserves downgrade on the carrying values of its assets and
will provide an update with its FY25 Full Year Audited Results. Initial assessments indicate an
impairment of oil & gas assets of between A$85m to A$108m and an impairment of deferred tax
assets of A$19m. These amounts will be finalised as part of the FY25 audit, with results expected
to be released on or around 26 September 2025.
This announcement is authorised for release by the Managing Director and Chief Executive
Officer in accordance with the Company’s Continuous Disclosure Policy.
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
Strike Energy Limited
+61 419 877 137
emma.alexander@strikeenergy.com.au
2
Refer to ASX announcement on 14 December 2022 entitled “Walyering Gas Sales Secured” and ASX announcement on 3 January 2024 entitled
“Walyering Production Update” for more information.
3
Subject to rig procurement, any required financier consents, and the outcome of an independent peer review.
3
Important Notices
Reserves and Contingent Resources Information
The RISC Reserves and Contingent Resources estimates are evaluated as at 1 July 2025,
reported to Strike on 18 August 2025 and are an update to RISC Reserves and Contingent
Resource estimates released to the ASX on 20 September of 2024. The updated Reserves and
Contingent Resources are based on the drilling, coring, log, seismic and production testing data
from the Cattamarra and Cadda Formations in the Walyering 1 to 7 wells. All Reserves and
Contingent Resources figures in this document are net to Strike. Strike holds a 100% operated
interest in L23 to which the Reserve and Resource estimates relate.
Reserves and Resources are reported in accordance with the definitions of Reserves and
Contingent Resources and guidelines set out in the Petroleum Resources Management System
(PRMS) prepared by the Oil and Gas Reserves Committee of the Society of Petroleum
Engineers (SPE) and reviewed and jointly sponsored by the American Association of Petroleum
Geologists (AAPG), World Petroleum Council (WPC), Society of Petroleum Evaluation Engineers
(SPEE), Society of Exploration Geophysicists (SEG), Society of Petrophysicists and Well Log
Analysts (SPWLA) and European Association of Geoscientists and Engineers (EAGE), revised
June 2018.
The Reserves and Contingent Resources have been estimated using a combination of
probabilistic and deterministic methods and arithmetic and probabilistic summation, and are
categorised and reported in the most specific category that reflects the degree of uncertainty in
the estimated quantities, that is 1P, 2P and 3P in the case of Reserves, 1C, 2C and 3C in the case
of Contingent Resources. The Contingent Resource estimates are un-risked and Strike
estimate a 50% chance of development.
Reserves are stated net of fuel, flare and vent. The reference point used for measuring and
assessing the estimates is the exit of the Walyering Gas Processing Facility.
The Reserves and Contingent Resources have been aggregated by arithmetic summation by
category, that is 1P, 2P and 3P for Reserves and 1C, 2C and 3C for Contingent Resources. As
recommended by the PRMS, the Reserves and Contingent Resources have been aggregated
beyond the project level by arithmetic summation, hence the aggregate 1P and 1C may be a very
conservative estimate and the aggregate 3P and 3C may be a very optimistic estimate due to the
portfolio effects of arithmetic summation.
In respect to the updated Reserves, Strike advises the following changes and or additions to the
information provided in the 20 September 2024 release under ASX Listing Rules 5.31.1 to 5.31.7:
•
LR 5.31.1 (Material economic assumptions) - All economic assumptions that form the
basis of the commerciality test were provided by Strike to RISC based on actual
expenditures and revenue and forecast revenues based on Strike’s existing firm gas
supply contracts. These assumptions are commercially sensitive. Economic
consideration has been applied for all State based royalties and federal taxes when
assessing the resulting net project cashflows.
•
LR 5.31.4 (Description of analysis of Reserves) – The reserves were deemed commercial
as screened against the economic assumptions referred to above. The analytical
procedures used to estimate the Reserves were through proven well production, well
testing and production forecasting. The extraction method for the Reserves is
conventional gas production.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 8 7099 7400
E: strike@strikeenergy.com.au
Level 1, 40 Kings Park Road
West Perth WA 6005
4
•
LR 5.31.5 (Estimated Quantities (in aggregate) to be recovered) – All Reserves listed
under the RISC report are deemed as developed and the resulting recoverable quantities
of gas reflect the ultimate recoveries of the existing well inventory inclusive of
compression planned for installation in Q4 CY2025.
In respect to the updated Contingent Resources, Strike advises the following changes and or
additions to the information provided in the 20 September 2024 release under ASX Listing Rules
5.33.1 to 5.33.5:
•
LR 5.33.2 (Basis for confirmation of hydrocarbons and discovery)- In addition to the
basis disclosed in 2024, additional Contingent Resources in the A1 sand are mapped up
dip of Walyering 7.
•
LR 5.33.3 (Analytical procedures and key contingencies) – The analytical procedures
used to estimate the Contingent Resource are the same as used for the 2024 estimates.
The key contingencies that prevent the Contingent Resources from being classified as
Reserves are:
o
for the Walyering 1 Contingent Resources - drilling productive appraisal wells and
including them in the development; and
o
for the Walyering 7 Contingent Resources - drilling a new well or sidetrack from
the existing Walyering 7 and including them in the development.
Oil and gas Reserves and Resource estimates are expressions of judgment based on knowledge,
experience and industry practice. Estimates that were valid when originally calculated may alter
significantly when new information or techniques become available. Additionally, by their very
nature, Reserve and Resource estimates are imprecise and depend to some extent on
interpretations, which may prove to be inaccurate. As further information becomes available
through additional production, drilling and analysis, the estimates are likely to change. This may
result in alterations to development and production plans which may, in turn, adversely impact
the Company’s operations. Reserves estimates and estimates of future net revenues are, by
nature, forward looking statements and subject to the same risks as other forward looking
statements.
Oil and Gas Reserves and Resource Estimation Process
Strike Estimates and reports it petroleum Reserves and Resources in accordance with the
definitions and guidelines of the Petroleum Resources Management System 2018, published
by the Society of Petroleum Engineers (SPE PRMS).
About Strike:
The Reserves and Resources estimates in this release are based on, and fairly represent,
information and supporting documentation prepared by, or under the supervision of a Qualified
Petroleum Reserves and Resources Evaluator (QPRRE) employed by Strike. The QPRRE is Mr.
Andrew Farley who holds a B.Sc. in Geology, and is a member of the Society of Petroleum
Engineers. Mr. Farley is the General Manager – Subsurface and Exploration for the Group and
has worked in the petroleum industry as a practicing geologist for more than 23 years. Mr. Farley
has consented to the inclusion in this report of matters based on his information in the form and
context in which it appears.
About RISC:
The preparation of the Reserves and Resources report referred to in this release was managed
by Mr. Adam Craig who is an employee of RISC Advisory. Mr. Craig is a member of PESA (202124 Western Australia branch President), a certified Petroleum Geologist of the AAPG and a
Fellow of the Geological Society and holds a BSc (Geology). Mr Craig has over 30-years’
5
experience in the sector and is a qualified petroleum reserves and resources evaluator (QPRRE)
as defined by ASX listing rules.
RISC is an independent oil and gas advisory firm. All of the RISC staff engaged in this assignment
are professionally qualified engineers, geoscientists or analysts, each with many years of relevant
experience and most have in excess of 20 years.
RISC was founded in 1994 to provide independent advice to companies associated with the oil
and gas industry. Today the company has approximately 40 highly experienced professional
staff at offices in Perth, Brisbane, Jakarta and London. We have completed over 2,000
assignments in 70+ countries for nearly 500 clients. Our services cover the entire range of the
oil and gas business lifecycle.
Forward looking Statements
Statements contained in this release, including but not limited to those regarding the possible
or assumed future costs, projected timeframes, performance, dividends, returns, revenue,
exchange rates, potential growth of Strike, industry growth, commodity or price forecasts, or
other projections and any estimated company earnings are or may be forward looking
statements. Forward looking statements can generally be identified by the use of words such as
‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’, ‘outlook’, ‘schedule’, ‘estimate’, ‘target’, ‘guidance’ ‘aim’,
‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. Forward
looking statements including all statements in this document regarding the outcomes of
preliminary and definitive feasibility studies, projections, guidance on future earnings and
estimates are provided as a general guide only and should not be relied upon as an indication
or guarantee of future performance. These statements relate to future events and expectations
and as such involve known and unknown risks and significant uncertainties, many of which are
outside the control of Strike. Actual results, performance, actions and developments of Strike
may differ materially from those expressed or implied by the forward-looking statements in this
release. Such forward-looking statements speak only as of the date of this document. Refer to
the risk factors set out in ASX release dated 22 July 2025 titled “Strategic Placement to Fund
Strike’s Next Phase of Growth” for a summary of certain general and Strike Energy specific risk
factors that may affect Strike Energy. There can be no assurance that actual outcomes will not
differ materially from these statements. Investors should consider the forward looking
statements contained in this release in light of those disclosures. To the maximum extent
permitted by law (including the ASX Listing Rules), Strike and any of its affiliates and their
directors, officers, employees, agents, associates and advisers disclaim any obligations or
undertaking to release any updates or revisions to the information in this document to reflect
any change in expectations or assumptions; do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this
document, or likelihood of fulfilment of any forward-looking statement or any event or results
expressed or implied in any forward-looking statement; and disclaim all responsibility and
liability for these forward-looking statements (including, without limitation, liability for
negligence). Nothing in this release will under any circumstances create an implication that
there has been no change in the affairs of Strike since the date of this document.
6
Share your feedback