Walyering West Update
• Walyering West - 1 flow testing commenced with initial operations recovering
hydrocarbons to surface from the C 1 sand .
• Testing program to include the A Sub1 , C 1 and D1- D4 sands within the primary
target of the Cattamarra Formation .
• Testing program and evaluation expected to be completed by end June .
• Walyering gas field production temporarily suspended to facilitate the installation
of field compression facilities.
Strike Energy Limited (Strike - ASX: STX) advises that flow testing operations have
commenced at the Walyering West - 1 exploration well, located in Production Licence
L23 (100% net to Strike) in the Perth Basin .
The testing program is designed to evaluate reservoir productivity and gather pressure
and flow rate data from the A Sub1, C 1 and D 1- 4 sands within the primary target of the
Cattamarra Formation, following the successful drilling and completion of the well .
F low testing operations conducted over
the C 1 Sand ha ve successfully flowed
hydrocarbons to surface , with testing
ongoing . Data acquisition, including flow
rate and pressure information, is
continuing and remains subject to
further analysis with testing and
interpretation expected to conclude by
30 June 2026 .
Walyering Gas Processing Facility Update
Production from the Walyering gas field
is undergoing a planned shutdown to
facilitate the installation and
commissioning of field compression
facilities. The compression project is
progressing as planned, with facility
restart anticipated 10 June 2026 and
commissioning activities expected to be
completed in late June 2026.
The installation of compression is
expected to enhance reservoir recovery
and support continued production from
the Walyering gas field.
ASX: STX The Company Announcement Officer ASX Ltd via electronic lodgement
9th
June 202 6
Initial flow test operations at Walyering West-1
2
Commenting on the commencement of flow testing, Strike Managing Director and Chief
Executive Officer, Shelley Robertson said:
“The Walyering West - 1 flow testing program is an important step in evaluating the
commercial potential of the Walyering West discovery and its ability to contribute to
future production from the Walyering field.
If flow testing is successful and demonstrates economically recoverable hydrocarbons,
Walyering West could provide an opportunity to support existing production and
contract commitments, while leveraging Strike’s established infrastructure position in
the Perth Basin. I look forward to updating shareholders on the outcomes of the testing
program."
About the Walyering West-1
Exploration Campaign
The Walyering West - 1 well is
located at Lat: 30° 43' 40.00" S,
Long: 115° 27' 00.52" E. The
well was drilled to a Total
Depth of 3,650m MDRT to test
Jurassic aged conventional
sandstone reservoirs within a
fault bound, 4 - way dip closure.
Walyering West - 1 is located
approximately 2 kilometres
west of the producing
Walyering - 5 gas well where
pre - drill estimates interpreted
a potential 2U Prospective
Resource of 46 PJ 1
within the A
to D Sands of the Cattamarra
Formation. On success, and
subject to the results of the
current flow testing, Walyering
West - 1 will be tied into the
Walyering Gas Processing
Facility located approximately 3 kilometers to the north east .
Prospective Resource Estimate Information & Cautionary statement: The above
estimated quantities of petroleum that may potentially be recovered by the application
of a future exploration and development project(s) relate to undiscovered
accumulations. These pre - drill estimates are un - risked, probabilistically determined,
and have both an associated chance of discovery of 26% and a chance of development
estimated to be 90%. Further exploration, appraisal and evaluation is required via drilling
and testing to determine the existence of a significant quantity of potentially moveable
hydrocarbons.
1
Refer to the Important Notices for Resource Information.
3
This announcement is authorised for release by the Managing Director and Chief
Executive Officer in accordance with the Company’s Continuous Disclosure Policy .
Company Contact
Shelley Robertson
Managing Director & Chief Executive Officer
Strike Energy Limited
shelley.robertson@strikeenergy.com.au
Important Notices
Resource Information
Unless otherwise stated, information in this release that relates to the Prospective Resource Estimate for
the Walyering West Prospective Resource is set out in the ASX announcement dated 19 August 202 5
entitled “ Walyering Reserves & Resources Update and Resulting Impairment ”. Strike equity interest is
100%.
Pending the outcome of the well test, Strike is unaware of any new information that materially impacts the
information in th at release and confirms that all the material assumptions and technical parameters
underpinning the estimate in the that release continue to apply and have not materially changed.
Forward looking Statements
Statements contained in this release, including but not limited to those regarding the possible or assumed
future costs, projected timeframes, performance, dividends, returns, revenue, exchange rates, potential
growth of Strike, industry growth, commodity or price forecasts, or other projections and any estimated
company earnings are or may be forward looking statements. Forward looking statements can generally
be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’, ‘outl ook’, ‘schedule’,
‘estimate’, ‘target’, ‘guidance’ ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar
expressions. Forward looking statements including all statements in this document regarding the
outcomes of prelimin ary and definitive feasibility studies, projections, guidance on future earnings and
estimates are provided as a general guide only and should not be relied upon as an indication or guarantee
of future performance. These statements relate to future events and expectations and as such involve
known and unknown risks and significant uncertainties, many of which are outside the control of Strike.
Actual results, performance, actions and developments of Strike may differ materially from those
expressed or impli ed by the forward - looking statements in this release. Such forward - looking statements
speak only as of the date of this document. Refer to the risk factors starting on page 31 of the FY25 Annual
Report for a summary of certain general and Strike Energy spe cific risk factors that may affect Strike
Energy. There can be no assurance that actual outcomes will not differ materially from these statements.
Investors should consider the forward looking statements contained in this release in light of those
disclosu res. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and any of
its affiliates and their directors, officers, employees, agents, associates and advisers disclaim any
obligations or undertaking to release any updates or revi sions to the information in this document to
reflect any change in expectations or assumptions; do not make any representation or warranty, express
or implied, as to the accuracy, reliability or completeness of the information in this document, or likeliho od
of fulfilment of any forward - looking statement or any event or results expressed or implied in any forward -
looking statement; and disclaim all responsibility and liability for these forward - looking statements
(including, without limitation, liability fo r negligence). Nothing in this release will under any circumstances
create an implication that there has been no change in the affairs of Strike since the date of this
document.
Share your feedback
Discover