Company Webinar Presentation - West Erregulla Unlocked
Released
Released
Announcement PDF
WEST ERREGULLA UNLOCKED
STRIKE ENERGY
1 September 2026
ASX:STX
DISCLAIMER AND IMPORTANT NOTICES
Summary information
This presentation contains summary information and statements about Strike Energy Limited (ASX:STX) (Strike), its subsidiaries
and their respective activities, which is current as at the date of this presentation (unless otherwise indicated).
The information in this presentation is general in nature and does not purport to be exhaustive. For example, this presentation
does not purport to contain all of the information that investors may require in evaluating a possible investment in Strike . It has
been prepared by Strike with due care but no representation or warranty, express or implied, is provided by Strike in relation to
the currency, accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this presentation.
This presentation should be read in conjunction with Strike’s other periodic and continuous disclosure announcements lodged with
the Australian Securities Exchange (ASX), which are available on the ASX website (at www.asx.com.au) and the Strike website (at
www.strikeenergy.com.au).
No person other than Strike has authorised or caused the issue, release, submission, distribution or provision of this presentation,
or takes any responsibility for, or makes or purports to make, any statements, representations or undertakings in this
presentation. Strike, to the maximum extent permitted by law, expressly excludes and disclaims all liability (including, without
limitation, any liability arising out of fault or negligence on the part of any person) for any direct, indirect, consequential or
contingent loss or damage, or for any costs or expenses, arising from the use of this presentation or its contents or otherwise
arising in connection with it. Strike does not make any representations or warranties (express or implied) to you about the
currency, accuracy, reliability or completeness of the information, opinions and conclusions in this presentation (including, without
limitation, any financial information, any estimates or projections and any other financial information).
Not an offer, and not investment or financial product advice
This presentation is not a prospectus, product disclosure statement or other disclosure document under the Corporations Act, or
other offering document under Australian law or any other law. This presentation has not been lodged with the Australian
Securities and Investments Commission. This presentation, and the information contained in it, is provided for information
purposes only and is not an offer or solicitation or an invitation or recommendation to subscribe for, acquire or buy securities of
Strike, or any other financial products or securities, in any place or jurisdiction.
This presentation may not be released to US wire services or distributed in the United States. This presentation does not constitute
an offer to sell, or the solicitation of an offer to buy, any securities in the United States or any other jurisdiction in which such an
offer would be unlawful. The securities referred to in this document have not been, and will not be, registered under the US
Securities Act of 1933 (US Securities Act) and may not be offered or sold in the United States except in transactions exempt from,
or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.
This presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or
investment advice (nor tax, accounting or legal advice) or a recommendation to acquire any securities of Strike. It has been
prepared without taking into account the objectives, financial or tax situation or particular needs of any individual. Any investment
decision, should be made based solely upon appropriate due diligence and other inquiries. Before making any investment decision,
investors should consider the appropriateness of the information having regard to their own objectives, financial and tax situation
and needs and seek professional advice from their legal, financial, taxation or other independent adviser (having regard to the
requirements of all relevant jurisdictions). Strike is not licensed to provide financial product advice in respect of an investment in
securities, and do not purport to give advice of any nature. An investment in any listed company, including Strike, is subject to risks
of loss of income and capital.
Past performance
Past performance metrics and figures, as well as pro forma financial information, included in this presentation are given for
illustrative purposes only and should not be relied upon as (and are not) an indication of Strike’s views on Strike's future financial
performance or condition or prospects (including on a consolidated basis). Investors should note that past performance of Strike,
including in relation to the historical trading price of shares, production, reserves and resources, costs and other historical financial
information cannot be relied upon as an indicator of (and provide no guidance, assurance or guarantee as to) future performance,
including the future trading price of shares. The historical information included in this presentation is, or is based on, information
that has previously been released to the market.
Investment risk
As noted above, an investment in shares in Strike is subject to investment and other known and unknown risks, some of which are
beyond the control of Strike. These risks, together with other general risks applicable to all investments in listed securities not
specifically referred to, may affect the value of shares in Strike in the future. Strike does not guarantee any particular rate of
return or the performance of Strike, nor guarantee the repayment of capital from Strike, or any particular tax treatment. When
making any investment decision, investors should make their own enquires and investigations regarding all information in this
presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect future operations of
Strike, and the impact that different future outcomes may have on Strike. Refer to the risk factors starting on page 31 of the 2025
Annual Report for a summary of certain general and Strike Energy specific risk factors that may affect Strike Energy.
Strike Energy | ASX:STX 2
WEST ERREGULLA DEVELOPMENT
A step-change in the scale of Strike’s energy business
Strong alignment with JV providing pathway to market by mid-2029
Binding heads of agreement for gas processing through Belisama
Toll based on an agreed and binding fixed Capacity Charge
$30M Hancock-funded Pre-FID program loan1, repayable from first gas
$30M Macquarie facility now available for balance sheet capacity2
WA gas market supply deficit from 2030 supports strong gas pricing3
3
1. Subject to finalising documentation and Macquarie consent. Refer to ASX announcement dated 31 August 2026 entitled “Company Update” for more
information, in particular Annexure C.
2. Refer to ASX announcement dated 31 August 2026 entitled “Company Update” for more information.
3. AEMO 2025 WA Gas Statement of Opportunities released on 19 December 2025.
Strike Energy | West Erregulla Unlocked
Pre-FID funding
agreement with
Hancock Energy3
WEST ERREGULLA
UNLOCKED
A step-change in the scale of Strike’s energy business
4
A NEW SOURCE OF CASHFLOW GENERATION
1. Target production rate is 50% of the proposed 87 TJ/day West Erregulla development targeted
production rate and is underpinned by Strike’s 251 PJ net 2P Reserves. The target is subject to
completion of development activities, finalisation of joint venture and gas processing arrangements
with Hancock Energy, final investment decision and other customary development conditions.
2. Refer to slide 14 for important information relating to reserves and resources estimates.
3. Subject to finalising documentation and Macquarie consent. Refer to ASX announcement dated 31
August 2026 entitled “Company Update” for more information, in particular Annexure C.
Status
Pre-FID
Target Production Rate
43.5 TJ/day1
Proposed Development
Belisama Gas
Plant
Reserves & Resources
2P: 251 PJ2
2C: 48 PJ2
251 PJ1 RESOURCE UPSIDE FUNDED PATHWAY
Gas sales over
project life
Strike share
Material potential
across L25 and L26
First gas targeted
early to mid-CY29
Strike Energy | West Erregulla Unlocked
Strike Energy | West Erregulla Unlocked
WEST ERREGULLA POSITIONED TO
SUPPLY A TIGHTENING WA GAS MARKET
Market fundamentals support strong gas pricing for WE
5
WA GAS SUPPLY VS DEMAND OUTLOOK
AEMO 2025 WA GSOO
0
100
200
300
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
2026 2030 2035 2040 2045
Domestic Gas Demand
Supply - anticipated
Supply - existing and committed
PJ
AEMO flags structural gas shortfall emerging beyond 2030
Source: AEMO 2025 WA Gas Statement of Opportunities, 19 December 2025
https://www.aemo.com.au/energy-systems/gas/gas-forecasting-and-planning/wa-gas-statement-of-opportunities-wa-gsoo
Under-investment driving reliance on uncommitted supply
REFRESHED LEADERSHIP
New leadership focussed on execution and shareholder value
• Shelley Robertson appointed Managing Director & CEO
• Nev Power appointed Chair
• Reconstituted Board and management team
Strike Energy | West Erregulla Unlocked
A NEW CHAPTER FOR STRIKE
A refreshed leadership team, near-term operational catalysts and a clear pathway to scale
6
NEAR-TERM DELIVERY
Scaling production and earnings
• Walyering producing with compression program underway
• 85 MW SEPP approaching commercial operations
• West Erregulla development pathway unlocked
POSITIONED TO SCALE
The platform to build a larger WA energy business
• Core assets spanning natural gas production and power
• Increasing diversity of revenue and earnings
• Exploration portfolio provides the next phase of growth
Walyering West adds
reserves and extends
infrastructure value
PRODUCING
TODAY
OPTIMISING
PRODUCTION
EXTENDING FIELD
LIFE
Supplying WA gas under
firm offtake agreements
Compression to optimise
production
Revenue per annum
Strike Energy | West Erregulla Unlocked
Status
Online
Target Rate1
20 TJ/day
Nameplate Capacity
33 TJ/day
Reserves & Resources
2P: 16.5 PJ2
2C: 17 PJ2
WALYERING
An established production base
1. Currently producing at 13 TJ/d as of 31 August 2026, targeting to ramp up to 20 TJ/d through September.
2. Refer to slide 14 for important information relating to reserves and resources estimates.
7
~$52m
Strike Energy | West Erregulla Unlocked
SOUTH ERREGULLA
PEAKING POWER PLANT
Set to deliver firming capacity into WA’s primary electricity grid,
integral in WA’s Energy Transition
85 MW fully
integrated peaking
gas power
development
Own gas = low cost Currently in final
phase of
commissioning
Strong revenue from
electricity sales and
guaranteed capacity
credits
Increasing demand
to support
renewables
High value add to gas
resource through
vertical integration
8
Strike Energy | West Erregulla Unlocked
WA ELECTRICITY MARKET
Battery charging adding aggregate demand to the market
9
AEMO WEM Reference Trading Price
July 11th 2026 (Example trading day)1
Coal exits targeting 2030 reducing firm generation capacity
Source: AEMO 2026 WA Electricity Statement of Opportunities, 23 June 2026
https://www.aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem/wem-forecasting-and-planning/wem-
electricity-statement-of-opportunities-wem-esoo
Electrification and industrial loads driving demand growth
1. AEMO Market Data – Real Time Market
Note: Peak Period from 4:00pm to 10:00pm. CY2026 prices from 1 Jan to 31 July 2026.
2. 2026 Reserve Capacity Price for 2028 represents BRCP of $488k to be determined in Q4CY26
Supports flexible generation from SEPP
$217/MWh
$154/MWh
$108/MWh
Morning Midday Evening
Increased need for flexible generation as provided by SEPP
0
100,000
200,000
300,000
400,000
500,000
600,000
0
20
40
60
80
100
120
140
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Reference Trading Price ($/MWh)
Reserve Capacity Price ($/MW)
Reference Trading Price
($/MWh)
Reserve Capacity Price
$/MW
WHOLESALE ELECTRICITY PRICES
AEMO WEM Reference Trading Price & Reserve Capacity Price2
0
50
100
150
200
250
300
350
400
$/MWh
RTP @ 11/07/2026
Average Price @ 11/07/2026
Average Peak Period Price @ 11/07/2026
Average Price CY2026
FUTURE OPTIONALITY
10
Multiple value enhancement opportunities available to Strike
STRIKE’S 3,500 HA
FREEHOLD LAND
Owned by Strike Energy Limited
SEPP
85 MW
Peaking Power
Pant
KINGIA PLAINS
~310 MW
Potential Wind
Capacity
WEST ERREGULLA
251 PJ 2P + 48 PJ 2C1
SOUTH ERREGULLA
45 PJ 2P + 37 PJ 2C1
Existing 132 KV
transmission line
Recently
constructed
transmission
GERALDTON
~100km
BRAND
HWY
~30km
PERTH
~400km
1. Refer to slide 14 for important information relating to reserves and resources estimates.
A PIPELINE OF GROWTH
Multiple paths to grow production, revenue and cash flow
1. Currently producing at 13 TJ/d as of 31 August 2026, subject to change.
2. Based on firm Reserve Capacity Pricing for the first two years of operation, subject to receiving approval to generate and commencing commercial operations.
3. Refer to slide 14 for important information relating to reserves and resources estimates.
4. Forecast by AEMO in the 2025 WA Gas Statement of Opportunities.
WALYERING SOUTH ERREGULLA WEST ERREGULLA
OCEAN HILL +
KADATHINNI
~$52m
REVENUE p.a.
~$52m
CAPACITY REVENUE
over first two years of operations2
+
ELECTRICITY SALES
REVENUE
2025 avg peak price ~$120/MWh
251 PJ3
STRIKE SHARE
MATERIAL
UPSIDE
Producing First power targeted 2026 First gas targeted mid-CY29
Exploration pipeline and
future upside
Revenue at current firm
offtake arrangements
Gas available
for marketing
Potential future
Gas supply
targeting
20 TJ/day1
Production in September 2026
85 MW capacity
Expected run rate 4-10hrs/day
Supportive market
Growing WA gas supply shortfall4
Large exploration
inventory
PRODUCING
NOW
NEAR-TERM
CASH FLOW
DEVELOPMENT
PIPELINE
FUTURE
UPSIDE
Strike Energy | West Erregulla Unlocked 11
SCALING STRIKE
BEYOND 2030
12
OCEAN HILL L26 KADATHINNI
180 PJ 2C1
MATERIAL
SCALE
Appraisal
opportunity
Future drilling
inventory
Emerging large-scale
untested potential
100%-owned
gas discovery
NEAR-FIELD
UPSIDE
Significant prospects
surrounding West Erregulla
Large prospects and leads
across Strike’s 100%-owned
acreage
Beyond the core
asset plan
ADDITIONAL
UPSIDE
Exploration success provides
the potential to:
Extend production
Grow future gas
supply
Leverage existing
infrastructure
1. Refer to slide 14 for important information relating to reserves and resources estimates.
Strike Energy | West Erregulla Unlocked
Click to edit Master subtitle style
ASX:STX
WHY STRIKE? WHY NOW?
ASX:STX
WEST ERREGULLA
UNLOCKED
A clear development
pathway for one of WA’s
largest onshore
conventional gas
resources.
REVENUE GROWTH
Walyering, South
Erregulla and West
Erregulla combined
providing the pathway to
a materially larger
production and earnings
base.
DIVERSIFIED ENERGY
EXPOSURE
Natural gas production
and dispatchable power
provide exposure to two
increasingly important
markets generating solid
revenue streams.
FUNDING PATHWAY
Development funding
support and aligned
partners provide a
pathway to progress the
portfolio while preserving
financial flexibility.
ORGANIC GROWTH
~3,000 km2 of Perth Basin
acreage provides multiple
material opportunities –
creating value via the drill
bit.
UNDERVALUED
World class asset base with
three significant revenue
streams targeted for 2029
and untapped exploration
upside creates opportunity
for increasing shareholder
returns.
DIVERSIFIED ASSETS | DIVERSIFIED EARNINGS | A NEW SCALE FOR STRIKE
13
Click to edit Master subtitle style
ASX:STX
FORWARD LOOKING STATEMENTS AND OTHER INFORMATION
Reserves and Resources Estimates
Information in this presentation relating to:
• the West Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 18 March 2026 entitled “West
Erregulla and Erregulla Deep Reserves and Resources Statement”. Strike’s equity interest is 50%. The estimates, classification
and risking presented are Strike evaluated and independently audited by Miller & Lents, Ltd. and have not been evaluated or
audited for or on behalf of the Joint Venture;
• the South Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 24 June 2024 entitled “South
Erregulla Reserves”. Strike’s equity interest is 100%;
• the Walyering Reserve and Resource estimate is set out in ASX announcement dated 17 August 2026 entitled "Walyering
Reserves Statement". Strike 's equity interest is 100%;
• the Ocean Hill 2C Contingent Resource and 2U Prospective Resource is set out in ASX announcement dated 27 August 2025
entitled "Ocean Hill Resource Update". Strike’s equity interest is 100%;
• the Kadathinni 2U Prospective Resource estimate is set out in ASX announcement dated 7 May 2025 entitled “Exploration
Update". Strike’s equity interest is 100%;
The above announcements are available to view on Strike Energy's website at www.strikeenergy.com.au.
Strike confirms that, as at the date of this presentation, it is not aware of any new information or data that materially affects the
information contained in the referenced announcements, and that all material assumptions and technical parameters
underpinning the estimates in those announcements continue to apply.
These reserves and resources estimates must be read in conjunction with the full text of the ASX releases referred to. The
Reserves and Resources are unrisked.
Forward looking statements
This presentation contains forward looking statements about Strike. Often, but not always, forward looking statements can be
identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements in this presentation regarding
intent, belief, expectations, plans, strategies and objectives of management, indications of and guidance on synergies, future
earnings or financial position or performance, future acquisitions, anticipated production rates or construction commencement
dates, costs or production outputs for each of Strike and the future operation of Strike. Strike does not make any representation
or warranty as to the currency, accuracy, reliability or completeness of any forward-looking statements contained in this
presentation.
To the extent that this presentation materials contains forward looking information, the forward-looking information is subject to
a number of risks, including those generally associated with the gas industry more broadly.
Any such forward looking statement inherently involves known and unknown risks, uncertainties and other factors that may cause
actual results, performance and achievements to be materially greater or less than estimated. These may include, but are not
limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development (including the risks of obtaining
necessary licenses and permits and diminishing quantities or grades of reserves), political and social risks, changes to the
regulatory framework within which Strike operate or may in the future operate, environmental conditions including extreme
weather conditions, geological and geotechnical events, and other environmental issues, the recruitment and retention of key
personnel, industrial relations issues, litigation and outbreaks of disease or pandemics.
Any such forward looking statements are based on assumptions, qualifications and contingencies which are subject to change and
which may ultimately prove to be materially incorrect, as are statements about market and industry trends, which are based on
interpretations of current market conditions. Investors should consider any forward-looking statements contained in this
presentation in light of such matters (and their inherent uncertainty) and not place reliance on such statements. Forward looking
statements are not guarantees or predictions of future performance and may involve significant elements of subjective judgment,
assumptions as to future events that may not be correct, known and unknown risks, uncertainties and other factors, many of
which are outside the control of Strike. Any forward-looking statements are based on information available to Strike as at the date
of this presentation. Refer to the risk factors starting on page 31 of the FY25 Annual Report for a summary of certain general and
Strike Energy specific risk factors that may affect Strike Energy. There can be no assurance that actual outcomes will not differ
materially from these statements. Investors should consider the forward looking statements contained in this presentation in light
of those disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and its directors, officers,
employees, advisers, agents and other intermediaries disclaim any obligation or undertaking to provide any additional or updated
information, whether as a result of new information, future events or results or otherwise (including to reflect any change in
expectations or assumptions).
Nothing in this presentation will, under any circumstances (including by reason of this presentation remaining available and not
being superseded or replaced by any other presentation or publication with respect to Strike or any other matter the subject
matter of this presentation), create an implication that there has been no change in the affairs of Strike since the date of this
presentation.
Effect of rounding and Financial data
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this presentation. All
dollar values are in Australian dollars ($ or A$ or AUD) unless stated otherwise. All references to USD or US$ or USD are to the
currency of the United States of America.
14
Click to edit Master subtitle style
ASX:STX
energy future
Delivering a secure
ASX:STX
Strike Energy | ASX:STX
APPENDIX A: STRIKE ENERGY COMPANY SNAPSHOT
A leading Perth Basin pure play
L25
50%
Waitsia
Lockyer &
North Erregulla
Beharra
EP503
100%
EP505
100%
EP506
100%
EP495
100%
EP488
100%
EP447
100%
EP489
100%
Walyering
(STX 100%)
Woodada
Ocean Hill
(STX 100%)
South Erregulla
(STX 100%)
West Erregulla
(STX 50%)
PGP
The Precinct
(STX 100%)
Operator in all
permits
Erregulla Deep
(STX 50%)
L23
100%
L24
100%
DBNGP
Kadathinni
(STX 100%)
EP504
100%
L26
50%
One of the largest discovered gas portfolios in the
onshore Perth Basin.
Supplying domestic gas into the WA market,
Strategically located near key processing and
transmission infrastructure.
Developing WA’s only fully integrated gas-fired
power generation at South Erregulla in the Mid-
West.
At current market cap, Reserves and Resources
valued at $0.68 per GJ (2P + 2C)2,3 with material
exploration upside.2
Market Cap
$414m1
Shares on issue
3.6b
Total Reserves and Resources
1.Market capitalisation based on a closing share price of $0.115 as at 31 August 2026.
2. Refer to slide 14 for important information relating to reserves and resources estimates.
3. Based on Strike Energy Limited market capitalisation as at 31 August 2026. Reserves and Resources comprise 2P Reserves and 2C Contingent Resources (net to Strike) as most recently disclosed. Value per GJ calculated
by dividing market capitalisation by total 2P + 2C volumes.
01
02
03
04
Prospective Resource Estimate Information & Cautionary statement
The estimated quantities of petroleum that may potentially be recovered by the application of a future exploration and
development project(s) relate to undiscovered accumulations. This estimate is un-risked, probabilistically determined and has a risk
of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons.
2P 2C 2U
17%
2% 4%
51%
19%
Total
313
292
1,459 2,064
8%
West Erregulla
Walyering
South Erregulla
Ocean Hill & OHS
Kadathinni
L26
Strike Perth Basin 2P Reserves,
2C Resources & 2U Resources (PJe)2
16
Share your feedback
Discover