FY26 FULL YEAR RESULTS
Delivering a secure energy future
29 Sept 2026
ASX:STX
DISCLAIMER AND IMPORTANT NOTICES
Summary information
This presentation contains summary information and statements about Strike Energy Limited (ASX:STX) (Strike), its subsidiaries
and their respective activities, which is current as at the date of this presentation (unless otherwise indicated).
The information in this presentation is general in nature and does not purport to be exhaustive. For example, this presentation
does not purport to contain all of the information that investors may require in evaluating a possible investment in Strike . It has
been prepared by Strike with due care but no representation or warranty, express or implied, is provided by Strike in relation to
the currency, accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this presentation.
This presentation should be read in conjunction with Strike’s other periodic and continuous disclosure announcements lodged with
the Australian Securities Exchange (ASX), which are available on the ASX website (at www.asx.com.au) and the Strike website (at
www.strikeenergy.com.au).
No person other than Strike has authorised or caused the issue, release, submission, distribution or provision of this presentation,
or takes any responsibility for, or makes or purports to make, any statements, representations or undertakings in this
presentation. Strike, to the maximum extent permitted by law, expressly excludes and disclaims all liability (including, without
limitation, any liability arising out of fault or negligence on the part of any person) for any direct, indirect, consequential or
contingent loss or damage, or for any costs or expenses, arising from the use of this presentation or its contents or otherwise
arising in connection with it. Strike does not make any representations or warranties (express or implied) to you about the
currency, accuracy, reliability or completeness of the information, opinions and conclusions in this presentation (including, without
limitation, any financial information, any estimates or projections and any other financial information).
Not an offer, and not investment or financial product advice
This presentation is not a prospectus, product disclosure statement or other disclosure document under the Corporations Act, or
other offering document under Australian law or any other law. This presentation has not been lodged with the Australian
Securities and Investments Commission. This presentation, and the information contained in it, is provided for information
purposes only and is not an offer or solicitation or an invitation or recommendation to subscribe for, acquire or buy securities of
Strike, or any other financial products or securities, in any place or jurisdiction.
This presentation may not be released to US wire services or distributed in the United States. This presentation does not constitute
an offer to sell, or the solicitation of an offer to buy, any securities in the United States or any other jurisdiction in which such an
offer would be unlawful. The securities referred to in this document have not been, and will not be, registered under the US
Securities Act of 1933 (US Securities Act) and may not be offered or sold in the United States except in transactions exempt from,
or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.
This presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or
investment advice (nor tax, accounting or legal advice) or a recommendation to acquire any securities of Strike. It has been
prepared without taking into account the objectives, financial or tax situation or particular needs of any individual. Any investment
decision, should be made based solely upon appropriate due diligence and other inquiries. Before making any investment decision,
investors should consider the appropriateness of the information having regard to their own objectives, financial and tax situation
and needs and seek professional advice from their legal, financial, taxation or other independent adviser (having regard to the
requirements of all relevant jurisdictions). Strike is not licensed to provide financial product advice in respect of an investment in
securities, and do not purport to give advice of any nature. An investment in any listed company, including Strike, is subject to risks
of loss of income and capital.
Past performance
Past performance metrics and figures, as well as pro forma financial information, included in this presentation are given for
illustrative purposes only and should not be relied upon as (and are not) an indication of Strike’s views on Strike's future financial
performance or condition or prospects (including on a consolidated basis). Investors should note that past performance of Strike,
including in relation to the historical trading price of shares, production, reserves and resources, costs and other historical financial
information cannot be relied upon as an indicator of (and provide no guidance, assurance or guarantee as to) future performance,
including the future trading price of shares. The historical information included in this presentation is, or is based on, information
that has previously been released to the market.
Investment risk
As noted above, an investment in shares in Strike is subject to investment and other known and unknown risks, some of which are
beyond the control of Strike. These risks, together with other general risks applicable to all investments in listed securities not
specifically referred to, may affect the value of shares in Strike in the future. Strike does not guarantee any particular rate of
return or the performance of Strike, nor guarantee the repayment of capital from Strike, or any particular tax treatment. When
making any investment decision, investors should make their own enquires and investigations regarding all information in this
presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect future operations of
Strike, and the impact that different future outcomes may have on Strike. Refer to the risk factors starting on page 31 of the 2025
Annual Report for a summary of certain general and Strike Energy specific risk factors that may affect Strike Energy.
2
1.Market capitalisation based on a closing share price of $0.110as at 28 September 2026.
2. Refer to slide 18 for important information relating to reserves and resources estimates.
ASX-listed energy company (ASX: STX) focused on Perth Basin
gas.
Producing, development and exploration portfolio providing
multiple value drivers.
Exposure to the WA domestic gas market.
Market Cap
$414m1
Shares on issue
3.6b
STRIKE AT A GLANCE
3
A leading independent energy company delivering reliable domestic gas and flexible
power generation to Western Australia
Material reserves and resources base underpinning future growth.
Refreshed Leadership
Nev Power
Chair
Jill Hoffmann
Non-executive director
Stephen Bizzell
Non-executive director
Will Barker
Non-executive director
Shelley Robertson
CEO & MD
Experienced Board and management team with proven delivery
capability.
Positioned for transformational production growth through future
development projects.
1. Refer to slide 18 for important information relating to reserves and resources estimates.
2. Based on Strike Energy Limited market capitalisation as at 24 September 2026. Reserves and Resources comprise 2P Reserves and 2C Contingent Resources (net to Strike) as
most recently disclosed. Value per GJ calculated by dividing market capitalisation by total 2P + 2C volumes.
Prospective Resource Estimate Information & Cautionary statement
The estimated quantities of petroleum that may potentially be recovered by the
application of a future exploration and development project(s) relate to
undiscovered accumulations. This estimate is un-risked, probabilistically determined
and has a risk of development. Further exploration, appraisal and evaluation is
required to determine the existence of a significant quantity of potentially moveable
hydrocarbons.
2P 2C 2U
17%
2% 4%
51%
19%
Total
313
292
1,459 2,064
8%
West Erregulla
Walyering
South Erregulla
Ocean Hill & OHS
Kadathinni
L26
Strike Perth Basin 2P Reserves,
2C Resources & 2U Resources (PJe)2
OUR PORTFOLIO
4
Total Reserves and Resources
L25
50%
Waitsia
Lockyer &
North Erregulla
Beharra
EP503
100%
EP505
100%
EP506
100%
EP495
100%
EP488
100%
EP447
100%
EP489
100%
Walyering
(STX 100%)
Woodada
Ocean Hill
(STX 100%)
South Erregulla
(STX 100%)
West Erregulla
(STX 50%)
PGP
The Precinct
(STX 100%)
Operator in all
permits
Erregulla Deep
(STX 50%)
L23
100%
L24
100%
DBNGP
Kadathinni
(STX 100%)
EP504
100%
L26
50%
A leading Perth Basin pure play
At current market cap, Reserves and Resources valued at
$0.68 per GJ (2P + 2C)1,2 with material exploration
upside.1
Walyering Cash flow from production
West Erregulla Development led growth
Ocean Hill Future resource growth potential
South Erregulla Appraisal & expansion opportunities
Perth Basin Infrastructure-advantaged position
Kadathinni Exploration upside
FY26 HIGHLIGHTS & RECENT MILESTONES
1. As at 1 July 2026.
2. Refer to slide 18 for important information on the estimation of Reserves and Resources.
3. Subject to finalising documentation and Macquarie consent. Refer to ASX announcement dated 31 August 2026 entitled “Company Update” for more information, in particular Annexure C.
4. Facility made available and drawn down on the 7th of September 2026.
5
WEST ERREGULLA NET 2P RESERVES1
Increased 2P Reserves by 20% post Natta 3D
interpretation and an independently audited Reserves
and Resources review across L25 & L26
Increased from 13.6 PJ accounting for 5.7 PJ of FY26
production
HANCOCK ENERGY PRE-FID LOAN
AGREED IN-PRINCIPLE3
To support Strike’s share of West Erregulla development
activities through to FID
MACQUARIE FACILITY MADE AVAILABLE4
Additional funding capacity
DEVELOPMENT PATHWAY ESTABLISHED
Processing solution agreed with Hancock Energy,
targeting 43.5TJ/d of Strike production capacity and first
gas in 1H CY29
Building the platform for growth
Advanced through construction and commissioning
towards commercial operations targeted in Q4 CY26
SOUTH ERREGULLA POWER PROJECT WALYERING 2P SALES GAS RESERVES2
85MW 251PJ 16.4PJ1
$30M $30M WEST ERREGULLA
FY26 FINANCIAL RESULTS
1. Refer Appendix 1 ‘Reconciliation of Underlying EBITDA to Net Loss’ 6
Investing in growth
SALES REVENUE
$62.8m
UNDERLYING EBITDA1
$17.6m
CASH AT 30 JUNE 2026
$46.3m
Lower Walyering production
3rd party gas maintained firm
commitments
Investment increased
materially
Natural field decline and compression
requirements reduced own-gas
production to:
Strike supplemented production with
third-party gas during softer WA spot
gas pricing, purchasing and on-selling:
Major development program South
Erregulla, Walyering compression and
Walyering West, net assets rose to:
5.9 PJe 2.37 PJ $355.6m
CAPEX FY26
$151.3m
Status
Online
Production Rate1
20 TJ/day
Reserves Contingent Resources
2C: 17 PJ2
WALYERING
Restoring production & Rebuilding Reserves
1. As of 24 September 2026, subject to change.
2. Refer to slide 18 for important information relating to reserves and resources estimates.
7
13.6
16.4
5.7
8.5
FY25 2P FY26
Production
Reserves
Review
FY26 2P
16.4
13.6
PJ
LOWER FIELD PRODUCTION
INVESTMENT & INTERVENTION
STRONGER POSITION
Reservoir decline
Compression requirement
Third-party gas used to maintain firm
contract commitments
FY25
FY26
FY27
Second heat exchanger installed
2 compression packages installed
Walyering West-1 drilled and tested
21% Reserves increase
Compression supporting 20 TJ/d
Walyering West-1 tie-in progressing
through FEED
2P: 16.4 PJ2
2P Reserves Reconciliation
(PJ)
CAPACITY REVENUE2
CY27
CY28
CY29 up to
~ $19m
~ $31m
~ $42m3
SOUTH ERREGULLA
1. Refer to slide 18 for important information relating to reserves and resources estimates.
2. CY = Capacity Year from 1 October to 30 September.
3. Based on Benchmark Reserve Capacity Price of $488,500 per MW per annum, subject to final Reserve Capacity Price expected to be announced in November 2026.
4. Illustrative electricity sales revenue based on 6–10 hours/day utilisation and electricity pricing assumptions of ~$125/MWh (6 hrs/day) and ~$110/MWh (10 hrs/day).
Illustrative only and not a forecast. Actual revenue will vary with dispatch, realised electricity prices, plant availability and operating conditions. 8
Approaching commercial operations
GENERATING
CAPACITY
85MW
RESERVES &
RESOURCES
45 PJ 2P1
37 PJ 2C1
STRIKE OWNED &
OPERATED
100%
~ $23m p.a.
~ $34m p.a.
6 hrs/d
10 hrs/d
ELECTRICITY SALES
Revenue driven by electricity
price x utilisation
Illustrative scenarios4
+
A new high-margin earnings stream for Strike with exposure to both capacity
and electricity markets
STRATEGIC ENERGY & INFRASTRUCTURE POSITION
9
3,500 ha freehold land positioned at the intersection of energy, transmission and digital infrastructure
STRIKE’S 3,500 HA
FREEHOLD LAND
SEPP
85 MW
Peaking Power
Pant
KINGIA PLAINS
~310 MW
Potential Wind
Capacity
WEST ERREGULLA
251 PJ 2P + 48 PJ 2C1
SOUTH ERREGULLA
45 PJ 2P + 37 PJ 2C1
Existing 132 KV
transmission line
Recently
constructed
transmission
GERALDTON
~90km
BRAND
HWY
28km
PERTH
~350km
1. Refer to slide 18 for important information relating to reserves and resources estimates.
LARGE SCALE LAND
3,500 ha freehold land owned by
Strike provides scale for major
infrastructure and industry
ENERGY RESILIENCE
Combination of gas and potential
renewables that can be delivered
via the grid or behind-the-meter
delivers reliability
STRATEGIC LOCATION
~400 km from Perth with ability
for co-location and strong
infrastructure corridor access
MULTIPLE VALUE
PATHWAYS
Gas production, power,
renewables, potential digital
infrastructure and other energy
intensive industry
KADATHINNI
Material prospective resources
25km SE from South Erregulla
WEST ERREGULLA
A defined pathway to market
10
1. Target production rate is 50% of the proposed 87 TJ/day West Erregulla development targeted
production rate and is underpinned by Strike’s 251 PJ net 2P Reserves. The target is subject to
completion of development activities, finalisation of joint venture and gas processing arrangements
with Hancock Energy, final investment decision and other customary development conditions.
2. Refer to slide 18 for important information relating to reserves and resources estimates.
Status
Pre-FID
Target Production Rate
43.5 TJ/day1
Development Pathway
Belisama
Gas Plant
Reserves & Resources
2P: 251 PJ2
2C: 48 PJ2
INDICATIVE ANNUAL
REVENUE AT $8/GJ
$127M
TARGET UPSTREAM FID
MID FY28
TARGET FIRST GAS
MID CY29
Post year end agreements materially advanced one of Strike’s largest growth
opportunities
IMPLEMENTATION
AGREEMENT
Framework to progress
development toward FID
and finalise long-form
project agreements.
FIXED CAPACITY
CHARGE
Binding fixed processing
Capacity Charge provides
greater certainty over a key
future cost.
ALIGNED
DEVELOPMENT
Integrated upstream and
processing framework with
access to Hancock technical
and development
capability.
FUNDING THE NEXT PHASE
At 30 June 2026 ($m)
Facility Limit ($m) Drawn 30 Jun 26 Pricing Repayment
Macquarie debt – Tranche A1 60.0 60.0 BBSW + 6.0% From Dec 26; matures Mar 29
Macquarie debt – Tranche A2 13.0 13.0 BBSW + 6.0% From Dec 26; matures Mar 29
Macquarie debt – Tranche B1 17.0 17.0 BBSW + 6.0% From Dec 26; matures Mar 29
Macquarie debt – Tranche B2 23.01 - BBSW + 6.0% No amortization
Macquarie debt – Tranche C 40.0 - - Uncommitted; subject to CPs
Asset finance – gas engines 49.0 49.0 BBSY + 7.6% / 6.0% 5 years from Oct 26
Asset finance – other 15.0 14.7 BBSY + 7.6%/ 6.0% 5 years from Oct 26
Rabobank - farm mortgage 6.0 6.0 BBSW + 3.25% Bullet, Dec 28
Borrowings (book)
$157.7m
Cash
$46.3m
Net debt
$111.4m
Covenants
All complied with
1. Post year-end, Macquarie debt Tranche B2 was increased to $30m and made available, drawn down on 7 September 2026
CAPACITY REVENUE5
CY27
CY28
CY29 up to
~$19m
~$31m
~ $42m2
Illustrative gas price
A PIPELINE OF GROWTH
Multiple paths to grow production, revenue and cash flow
1. As of 24 September 2026, subject to change.
2. Based on Benchmark Reserve Capacity Price of $488,500 per MW per annum, subject to final Reserve Capacity Price expected to be
announced in November 2026.
3. Refer to slide 18 for important information relating to reserves and resources estimates.
4. Forecast by AEMO in the 2025 WA Gas Statement of Opportunities.
WALYERING SOUTH ERREGULLA WEST ERREGULLA
OCEAN HILL +
KADATHINNI
~$52m
REVENUE p.a.
251 PJ3 STRIKE SHARE
MATERIAL
UPSIDE
Producing First power targeted 2026 First gas targeted mid-CY29
Exploration pipeline and
future upside
Revenue at current firm
offtake arrangements
At a target production rate of 43.5 TJ/day7
Potential future
Gas supply
20 TJ/day1
Production rate
85 MW capacity
Expected run rate 6-10hrs/day
Supportive market
Growing WA gas supply shortfall4
Large exploration
inventory
PRODUCING
NOW
NEAR-TERM
CASH FLOW
DEVELOPMENT
PIPELINE
FUTURE
UPSIDE
12
TWO REVENUE STREAMS
~$23m p.a.
~$34m p.a.
6 hrs/d
10 hrs/d
ELECTRICITY SALES
Revenue driven by electricity
price x utilisation
Illustrative scenarios6
+
5. CY = Capacity Year from 1 October to 30 September.
6. Illustrative electricity sales revenue based on 6–10 hours/day utilisation and electricity pricing assumptions of ~$125/MWh (6 hrs/day) and
~$110/MWh (10 hrs/day). Illustrative only and not a forecast. Actual revenue will vary with dispatch, realised electricity prices, plant
availability and operating conditions.
7. Refer to Footnote 1 on slide 5.
Revenue
p.a.
($m)
111
127
143
159
175
191
$7 $8 $9 $10 $11 $12
SCALING STRIKE
BEYOND 2030
13
OCEAN HILL L26 KADATHINNI
180 PJ 2C1
MATERIAL
SCALE
Appraisal
opportunity
Future drilling
inventory
Emerging large-scale
untested potential
100%-owned
gas discovery
NEAR-FIELD
UPSIDE
Significant prospects
surrounding West Erregulla
Large prospects and leads
across Strike’s 100%-owned
acreage
Beyond the core
asset plan
ADDITIONAL
UPSIDE
Exploration success provides
the potential to:
Extend production
Grow future gas
supply
Leverage existing
infrastructure
1. Refer to slide 18 for important information relating to reserves and resources estimates.
Host a data centre
FY27 FINANCIAL PRIORITIES
1. Target production rate is 50% of the proposed 87 TJ/day West Erregulla development targeted production rate and is underpinned by Strike’s 251 PJ net 2P Reserves. The target is subject to completion of development activities, finalisation of joint venture and gas processing arrangements with Hancock Energy, final
investment decision and other customary development conditions 14
CONVERT SOUTH ERREGULLA INTO CASH FLOW
Total forecast project cost about $186m; practical completion forecast 31
October 2026.
01
SERVICE DEBT FROM OPERATING CASH FLOW
Asset finance amortises from October 2026; Macquarie debt from
December 2026.
02
FUNDING FOR WEST ERREGULLA TO FID
Hancock Energy loan of up to $30m, subject to long-form agreements and
Macquarie consent. Targeting 43.5TJ/d1 production net to Strike via
Hancock Energy’s proposed Belisama Gas Plant.
03
CAPITAL DISCIPLINE
Pursue exploration and development programmes through disciplined
capital management.
04
ASX: STX
WEST ERREGULLA
UNLOCKED
A clear development
pathway for one of WA’s
largest onshore
conventional gas
resources.
REVENUE GROWTH
Walyering, South
Erregulla and West
Erregulla combined
providing the pathway to
a materially larger
production and earnings
base.
DIVERSIFIED ENERGY
EXPOSURE
Natural gas production
and dispatchable power
provide exposure to two
increasingly important
markets generating solid
revenue streams.
FUNDING PATHWAY
Development funding
support and aligned
partners provide a
pathway to progress the
portfolio while preserving
financial flexibility.
ORGANIC GROWTH
~3,000 km2 of Perth Basin
acreage provides multiple
material opportunities –
creating value via the drill
bit.
UNDERVALUED
World class asset base with
three significant revenue
streams targeted for 2029
and untapped exploration
upside creates opportunity
for increasing shareholder
returns.
DIVERSIFIED ASSETS | DIVERSIFIED EARNINGS | A NEW SCALE FOR STRIKE
15
WHY STRIKE? WHY NOW?
Click to edit Master subtitle style
ASX:STX
energy future
Delivering a secure
ASX: STX
For further information:
strike@strikeenergy.com.au
strikeenergy.com.au
APPENDIX A: UNDERLYING EBITDA RECONCILIATION
Underlying EBITDA Reconciliation 2026
$’000
2025
$’000
Revenue from gas and oil sales 62,777) 72,717)
Cost of sales excluding depreciation and amortisation (29,954) (17,707)
Other income 1,376) 4,301)
Other operating excluding D&A (16,613) (17,700)
Underlying EBITDA 17,586 41,611)
Finance income 1,470) 969)
Finance expenses (8,470) (11,009)
Depreciation and amortisation (30,548) (51,974)
Abandonment expense (4,510) -
Impairment expense (2,715) (117,748)
Income tax expense - (19,177)
Loss for the period (27,187) (157,328)
Click to edit Master subtitle style
ASX:STX
FORWARD LOOKING STATEMENTS AND OTHER INFORMATION
Reserves and Resources Estimates
Information in this presentation relating to:
• the West Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 18 March 2026 entitled “West
Erregulla and Erregulla Deep Reserves and Resources Statement”. Strike’s equity interest is 50%. The estimates, classification
and risking presented are Strike evaluated and independently audited by Miller & Lents, Ltd. and have not been evaluated or
audited for or on behalf of the Joint Venture;
• the South Erregulla Reserve and Resource estimate is set out in the ASX announcement dated 24 June 2024 entitled “South
Erregulla Reserves”. Strike’s equity interest is 100%;
• the Walyering Reserve and Resource estimate is set out in ASX announcement dated 17 August 2026 entitled "Walyering
Reserves Statement". Strike 's equity interest is 100%;
• the Ocean Hill 2C Contingent Resource and 2U Prospective Resource is set out in ASX announcement dated 27 August 2025
entitled "Ocean Hill Resource Update". Strike’s equity interest is 100%;
• the Kadathinni 2U Prospective Resource estimate is set out in ASX announcement dated 7 May 2025 entitled “Exploration
Update". Strike’s equity interest is 100%;
The above announcements are available to view on Strike Energy's website at www.strikeenergy.com.au.
Strike confirms that, as at the date of this presentation, it is not aware of any new information or data that materially affects the
information contained in the referenced announcements, and that all material assumptions and technical parameters
underpinning the estimates in those announcements continue to apply.
These reserves and resources estimates must be read in conjunction with the full text of the ASX releases referred to. The
Reserves and Resources are unrisked.
Forward looking statements
This presentation contains forward looking statements about Strike. Often, but not always, forward looking statements can be
identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements in this presentation regarding
intent, belief, expectations, plans, strategies and objectives of management, indications of and guidance on synergies, future
earnings or financial position or performance, future acquisitions, anticipated production rates or construction commencement
dates, costs or production outputs for each of Strike and the future operation of Strike. Strike does not make any representation
or warranty as to the currency, accuracy, reliability or completeness of any forward-looking statements contained in this
presentation.
To the extent that this presentation materials contains forward looking information, the forward-looking information is subject to
a number of risks, including those generally associated with the gas industry more broadly.
Any such forward looking statement inherently involves known and unknown risks, uncertainties and other factors that may cause
actual results, performance and achievements to be materially greater or less than estimated. These may include, but are not
limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development (including the risks of obtaining
necessary licenses and permits and diminishing quantities or grades of reserves), political and social risks, changes to the
regulatory framework within which Strike operate or may in the future operate, environmental conditions including extreme
weather conditions, geological and geotechnical events, and other environmental issues, the recruitment and retention of key
personnel, industrial relations issues, litigation and outbreaks of disease or pandemics.
Any such forward looking statements are based on assumptions, qualifications and contingencies which are subject to change and
which may ultimately prove to be materially incorrect, as are statements about market and industry trends, which are based on
interpretations of current market conditions. Investors should consider any forward-looking statements contained in this
presentation in light of such matters (and their inherent uncertainty) and not place reliance on such statements. Forward looking
statements are not guarantees or predictions of future performance and may involve significant elements of subjective judgment,
assumptions as to future events that may not be correct, known and unknown risks, uncertainties and other factors, many of
which are outside the control of Strike. Any forward-looking statements are based on information available to Strike as at the date
of this presentation. Refer to the risk factors starting on page 30 of the FY26 Annual Report for a summary of certain general and
Strike Energy specific risk factors that may affect Strike Energy. There can be no assurance that actual outcomes will not differ
materially from these statements. Investors should consider the forward looking statements contained in this presentation in light
of those disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and its directors, officers,
employees, advisers, agents and other intermediaries disclaim any obligation or undertaking to provide any additional or updated
information, whether as a result of new information, future events or results or otherwise (including to reflect any change in
expectations or assumptions).
Nothing in this presentation will, under any circumstances (including by reason of this presentation remaining available and not
being superseded or replaced by any other presentation or publication with respect to Strike or any other matter the subject
matter of this presentation), create an implication that there has been no change in the affairs of Strike since the date of this
presentation.
Effect of rounding and Financial data
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this presentation. All
dollar values are in Australian dollars ($ or A$ or AUD) unless stated otherwise. All references to USD or US$ or USD are to the
currency of the United States of America.
18
Share your feedback
Discover