STRIKE ENERGY LIMITED
QUARTERLY REPORT
For the period ending 30 September 2015
Strike Energy Limited - Quarterly Report: September 2014
September Quarter Performance Summary
Key Achievements
Australia
Klebb Phase 3 Flow Testing Program commenced
Southern Cooper
Basin Gas Project
Klebb 2 and 3 more effective at constraining the Klebb 1 drainage area than anticipated – a critical objective
of this program
Immediate establishment of gas flows from Klebb 2 and Klebb 3 post-stimulation
Increasing gas flows measured at the Klebb pilot location
Cash on hand of $9.6 million on hand at the end of the quarter – fully funded to meeting current forward
program.
Strong
Funding Position
FY 15 ATO Research & Development (R&D) refund of $8.5 million received.
FY 15 R&D Macquarie facility of $5.9 million repaid with the FY 16 R&D facility of up to $4.0 million in place.
Continued strong interest in additional gas offtake.
Strike Energy Limited - Quarterly Report: September 2015
1
Managing Director’s Comments
I am pleased to report on another active quarter for Strike.
During the quarter we focused on the completion of the fracs at Klebb 2 and
Klebb 3 and the installation and commissioning of a new beam pump at Klebb 1
for the Phase 3 extended flow test program. Following the successful completion
of the workover program, flow testing commenced in August and continued for
the balance of the quarter with all wells on pump and producing gas. During
the quarter, we also received $8.5 million from the ATO relating to expenditure
incurred on the Group’s eligible R&D activities undertaken during the FY 15 year
while establishing a new $4.0 million R&D funding facility with Macquarie to
provide additional non-dilutive liquidity to accelerate our commercialisation
program.
We commenced the quarter with the workovers of the Klebb wells for the Phase
3 flow test program, which is designed to accelerate reservoir pressure reduction
around Klebb 1 to enable the productive potential of the reservoir to be validly
tested. The objective of the Phase 3 program is to demonstrate flow rates achievable
from a small scale, single stage completion to underpin a larger scale multi-stage
commercial development.
The Klebb 2 and 3 fracs were successfully pumped and are about double the size
of the original Klebb 1 frac. The Klebb 2 and 3 fracs have resulted in very pleasing
increases in productivity following improved frac design and execution. Construction
and commissioning of a beam pump at Klebb 1 was completed during August, with
steady production and good availability through to the end of the quarter.
Strike Energy Limited - Quarterly Report: September 2015
At the end of the quarter, the Klebb 1 well was shut in following a combination of gas
breakout and surging in the tubing string and a build up in the casing. As a result, a
work over rig has been mobilised to site to install a new downhole pump assembly
with improved capacity to handle increasing gas flow. We expect to bring the Klebb
1 well back into production shortly, re-establishing the momentum that had been
achieved prior to the shut in.
Klebb 2 and 3 have continued to produce steadily in October with a significant
acceleration in gas rates observed over the past two weeks.
Design work for a demonstration gas processing and compression facility is
advancing steadily in anticipation of the reclassification to reserves of the 1C, 2C and
3C Contingent Resource as previously certified by DeGolyer and MacNaughton and
as outlined in the Company’s ASX announcement dated 27 April 2015.
At quarter end, the Company reported cash on hand of $9.6 million.
The fracture stimulation of Klebb 2 and 3 and the progress we have made
since recommissioning the wells has provided a demonstrable improvement
in performance, confirming our confidence that the Phase 3 flow testing of the
Klebb wells will realise results in the near term that demonstrate the commercial
potential of the project.
Below: Klebb 3 frac operations
2
Southern Cooper Basin Gas Project: Strike’s Strategic Objectives
Strategic objectives
Timing
Supply targets
2020/21
Production
FID
Cost competitive third
party gas supply for
LNG exporters
Development
~5 Tcf over 20 years
Equivalent to gas supply
for one LNG train
Expanded resource delineation
across STX acreage
2017/18
Production
New source of
affordable gas supply
for east coast domestic
customers
~1 Tcf over 20 years
FID
Initial development
Equivalent to 35%
of NSW gas supply
Current
PEL 96
Appraisal/
Commercialisation
Strike is positioning the Southern Cooper Gas Project as a long-life resource for domestic and export gas supply
Strike Energy Limited - Quarterly Report: September 2015
3
Southern Cooper Basin Gas Project: Quarterly Achievements
Field operations at PEL 96 (STX 66.7%, EWC 33.3%) during the quarter were focused
on the completion of the Klebb workover and fracture stimulation program. All
three wells were successfully commissioned early in the quarter with the results
to date from the Phase 3 flow testing indicating that the pilot is working more
effectively than expected. Flow testing progressed steadily with gas rates increasing
at all wells until a gas-lock and subsequent mechanical issue with the downhole
pump in Klebb 1 resulted in its shut-in. Flow testing of Klebb 2 and 3 has continued,
unaffected by the shut-in of Klebb 1.
Klebb Phase 3 Flow Testing Program Results
Testing recommenced at Klebb 2 on 24 July and at quarter end 25,000 bbls of water
had been produced from the well including a period of controlled production ramp
up. Testing recommenced at Klebb 3 on 12 August and at quarter end 20,000 bbls of
water had been produced from the well including a period of controlled production
ramp up. Quarter end exit water production rates of around 450 to 550 bwpd have
been maintained at each of the wells during October.
After a commissioning period, the Klebb 1 beam pump achieved stable flow on 29
August and by quarter end produced 4,500 bbls of water.
Klebb Phase 3 Flow Testing Program Overview
The objective the Phase 3 program is to accelerate reservoir pressure reduction
to maximise the volume of gas able to desorb from the coal. The Klebb wells are
designed to facilitate a close spaced, confined flow test of the Patchawarra Vu Upper
coal horizon centred on Klebb 1.
K3
K1
K2
Increases in pumping rates have been managed in a controlled manner and the
response of the wells, confirmed by pressure data, water and gas production rates
and other field information has reinforced the effectiveness of this approach.
The performance of Klebb 2 and Klebb 3 has been particularly pleasing. The
immediate establishment of gas flows from both Klebb 2 and 3 following stimulation
is similar to that observed during the initial testing of Le Chiffre 1. Pressure data has
confirmed that higher gas flows are being observed from the wells at higher bottomhole pressures than achieved pre-stimulation.
Further, Klebb 2 and 3 have also proven to be more effective than expected in
constraining the Klebb 1 drainage area – a critical objective of this program.
Production rates of approximately 200 bwpd at Klebb 1 are now sufficient to reduce
bottom hole flowing pressure whereas flow rates in excess of 500 bwpd were
required in previous testing phases.
A workover of Klebb 1 to replace the downhole pump with a re-engineered unit is
currently underway and the well will be returned to test as soon as these operations
are complete.
Vu Upper frac
Strike Energy Limited - Quarterly Report: September 2015
The consistent flow testing of the three Klebb wells is a critical step toward
confirming the commercial potential of the SCBGP and remains the primary focus of
activities.
4
Southern Cooper Basin Gas Project: Phase 3 Program Current Status
Phase 3 production testing continued during October with water production
maintained at stable rates of 450 – 550 bwpd from Klebb 2 and 3. Observations
taken at Klebb 1 indicate that a stable average reservoir pressure of around 2,400
psi has been maintained in the area bounded by the wells.
Over the last few weeks, the trend of steady increases in gas production has
accelerated sharply with significant increases in average and peak daily gas rates
observed. We have been pleasantly surprised by this unexpected performance
which demonstrates that the pilot program, with only two of three wells producing,
is on the verge of transitioning to substantial gas desorption and flow rates.
We have known for some time that the Patchawarra coals at Klebb and Le
Chiffre have the fundamental gas content and reservoir attributes required to
deliver commercial gas flow rates. The Klebb pilot wells have now proven that
reservoir pressure (although still relatively high on average) has been reduced to
the point where gas flows are starting to rapidly build. Therefore, as consistent
and stable testing continues, we expect the Klebb Phase 3 pilot wells will build
to and exceed our threshold commercial gas rates.
The workover of Klebb 1 is currently underway and recommencement of production
is anticipated in early November. Klebb 1 will then work together with Klebb 2
and Klebb 3 to further reduce average reservoir pressure leading to increasing
gas production rates as more substantial volumes of coal reach critical desorption
pressures.
Above: Klebb 2 flare
Strike Energy Limited - Quarterly Report: September 2015
5
Southern Cooper Basin Gas Project: PEL 96 Commercialisation Strategy
Objective
Funding (1)
Increased
reserves and
resources
Commence Q1 2016
Objective
Le Chiffre pilot wells + testing
Continue Klebb pilot production
Phase 4
Pre-development activities
Commence Q3 2015
Funding (1)
Frac Klebb 2 & 3
Phase 3
Install new pumps at Klebb 1, 2 & 3
Klebb pilot test - In progress
Funded (1)
Commence Q1 2015
Continue testing Le Chiffre 1 and Klebb 1-3
Install new pump at Klebb 1
Understand multi-well pressure drawdown
effects
Phase 2
Dec 2014
Funded (1)
Phase 1
Infill wells
Single well tests
Le Chiffre 1 and Klebb 1
Drill and complete Klebb
2 and 3
Demonstration
project
Planning
Objective
Commercial
gas flows
Initial reserves
Objective
Build gas flows
(in progress)
Objective
Sustained gas flows
Technical feasibility
Commercial feasibility
(1) Funded from existing cash resources
A disciplined, capital efficient and funded appraisal program is being followed to establish commerciality
Strike Energy Limited - Quarterly Report: September 2015
6
US Operations: Production and Operations Update
US Exploration and Evaluation Activities
The Company continues to hold its interests in the Permian Basin, Eagle Ford Shale and
Eagle Landing Joint Ventures with no exploration and/or field development activities
occurring during the quarter.
EAGLE LANDING JOINT VENTURE
The Company has no plans for further investment into these projects in the near term.
US Production
Strike currently produces oil and gas from three independent assets. Total oil
production for the quarter was 3,725 bbls down 11% on the prior quarter and gas
production was 69,620 Mcf down 5% on the prior quarter.
SEP QTR 2015
JUN QTR 2015
QUARTERLY
CHANGE
Gas (Mcf)
65,598
68,073
(4%)
Oil (Bbl)
1,218
1,486
(18%)
Total Revenue (USD’000)
232
258
(10%)
PERMIAN BASIN – MB CLEARFORK PROJECT
Gas (Mcf)
3,485
4,586
(24%)
Oil (Bbl)
1,860
1,986
(6%)
The Eagle Landing Joint Venture (Strike 40% WI) produced 65,598 Mcf of gas and 1,218
bbls of oil net to Strike during the quarter, down 4% for gas and down 18% for oil on
the previous quarter. The decrease in oil production for the quarter is a result of the
well’s natural production decline.
Total Revenue (USD’000)
99
106
(7%)
Gas (Mcf)
537
639
(16%)
Oil (Bbl)
647
694
(7%)
The MB Clearfork Project (Strike 25% WI) produces oil from 20 conventional Permian
Basin wells in Martin County, Texas. During the quarter, the MB Clearfork Project
produced 3,485 Mcf of gas and 1,860 bbls of oil net to Strike, down 24% for gas and
down 6% for oil from the previous quarter. The decrease in gas production for the
quarter is due to issues experienced with certain salt water injection wells, which
continued to be monitored.
Total Revenue (USD’000)
29
39
(26%)
Gas (Mcf)
69,620
73,298
(5%)
Oil (Bbl)
3,725
4,166
(11%)
Total Revenue (USD’000)
360
403
(11%)
Total Revenue (AUD’000)
496
531
(7%)
The Eagle Ford shale project (Strike 27.5% WI) produces oil and gas from the Bigham
1H well in Fayette County, Texas. The well produced 537 Mcf of gas and 647 bbls of
oil net to Strike during the quarter, down 16% for gas and down 7% for oil on the
previous quarter. The decrease in gas production for the quarter is as a result of minor
compressor problems which affected production over 9 days during the quarter.
EAGLE FORD SHALE – BIGHAM 1H
TOTAL
Based on industry convention energy equivalence 6 Mcf of gas = 1 Bbl of oil
Average realised prices during the quarter were US$46.17/Bbl, down 9% from
US$50.89/Bbl in the previous quarter for oil and US$2.70/Mcf, up 4% from US$2.61/
Mcf for gas in the previous quarter.
Strike Energy Limited - Quarterly Report: September 2015
7
Finance, Commercial and Corporate Update
Corporate Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
E: strike@strikeenergy.com.au
W: www.strikeenergy.com.au
During the September quarter the Company continued to
advance a number of its financial and commercial initiatives
in support of the appraisal and accelerated development and
commercialisation of the SCBGP.
Key highlights include:
•
As outlined in the Company’s ASX announcement dated
21 September 2015, the Company received an $8.5 million
refund in respect of its eligible R&D activities undertaken
during the financial year ended 30 June 2015. Upon receipt
of these funds, the Company repaid in full the $5.9 million
outstanding under the FY 15 Macquarie Facility.
•
Following the repayment of the FY 15 Macquarie Facility, the
Company executed an amending document which extended
the Macquarie R&D facility through to 30 November 2016,
with a new facility limit of up to $4.0 million being available
to be drawn upon based upon the Company’s anticipated
eligible R&D expenditure for the 2016 financial year.
•
The Company continues to advance its planning for an
initial development project within PEL 96 in response to
the successful achievement of all of the key objectives
for the current appraisal program with the SCBGP. During
the quarter, work has continued to scope and assess the
feasibility of a demonstration scale modular gas processing
facility that will be designed to process, compress and deliver
sales gas produced from the multi-well testing program into
the Moomba to Adelaide pipeline. Design work is advancing
and discussions with engineering groups and equipment
suppliers to identify long lead items are actively proceeding.
Registered Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
Securities Exchange
ASX : STX
Securities on Issue
Shares: 833,330,946
Options: 11,700,000
Performance Rights: 29,100,000
Analyst Coverage
Firm
Analyst
Ord Minnett
John Young
Euroz
Michael Skinner
Bell Potter
Peter Arden
The Company completed the quarter with $9.6 million cash on
hand and is well placed to continue its’ field operations and
demonstration scale processing facility planning and design.
Strike Energy Limited - Quarterly Report: September 2015
8
Strike’s Southern Cooper Basin Gas Project: Gas resource
Prospective
Resource
PEL 96
4,492 Bcf*
PEL 96 Phase
One Area
1,123Bcf*
Moomba
2C
Contingent
Resource*
Marsden 1
104 Bcf
Davenport 1
PEL 94
STX 35%
PEL 95
STX 50%
Mount Isa
Gladstone
Le Chiffre 1
Klebb production
testing area
Moomba
PELA 640
STX 100%
Brisbane
PEL 96
STX 66.67%
0
20
Sydney
Adelaide
Kilometers
PEL 96 Phase One Area
Strike Phase One Area wells drilled
Gas Pipeline
Strike Wells Drilled
Oil Pipeline
PEL 96 Offset Wells
Strzelecki Track
PEL 96 and PELA 640 - STX Operated
Hobart
* Mean estimate (net to Strike determined on a probalistic basis) per ASX announcement dated 19 Feb 2014 and adjusted for announced
contingent resource estimate per ASX announcement dated 27 April 2015.
** The estimated quantities of petroleum that may potentially be recovered by the application of a future development project relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration
appraisal and evaluation is required to determine the existence of a significant quantity of potentially movable hydrocarbons.
PEL
Net STX Acres
PEL 94
77,925
PEL 95
160,248
PEL 96
443,880
PELA 640
850,786
Total
1,532,839
Strike has an ideally positioned long-life multi-Tcf resource
directly connected to the ~40 Tcf Eastern Australian gas market
Strike Energy Limited - Quarterly Report: September 2015
9
Important Notice
This presentation does not constitute an offer, invitation or recommendation to subscribe for,
or purchase any security and neither this presentation nor anything contained in it shall form
the basis of any contract or commitment.
Reliance should not be placed on the information or opinions contained in this presentation.
This presentation does not take into consideration the investment objectives, financial
situation or particular needs of any particular investor. Any decision to purchase or subscribe
for any shares in Strike Energy Limited should only be made after making independent
enquiries and seeking appropriate financial advice.
No representation or warranty, express or implied, is made as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Strike Energy Limited and its affiliates
and related bodies corporate, and their respective officers, directors, employees and agents
disclaim liability (including without limitation, any liability arising from fault or negligence) for
any loss arising from any use of or reliance on this presentation or its contents or otherwise
arising in connection with it.
Contingent Resource Estimate
DeGolyer and MacNaughton was engaged by Strike to undertake an Independent Review of
the gas resource in PEL 96 based on the data and information acquired to date by Strike from
the drilling and flow testing programs carried out at the Le Chiffre 1 and Klebb 1, Klebb 2 and
Klebb 3 wells.
DeGolyer and MacNaughton has estimated a contingent gas resource on a probalistic basis for
the initial zones that have been flow tested within the Le Chiffre 1 and Klebb 1 wells. As these
zones only represent a portion of the net coal encountered at these locations, successful flow
testing of additional zones will enable an increased contingent resource to be booked.
The table below summarises the Contingent Resource Estimates.
Contingent Gas Resource Estimates - PEL 961
Well
1C2
2C2
3C2
Statements contained in this presentation, including but not limited to those regarding the
possible or assumed future costs, performance, dividends, returns, production levels or
rates, oil and gas prices, reserves, potential growth of Strike Energy Limited, industry growth
or other projections and any estimated company earnings are or may be forward looking
statements.
Productive area (acres)
2,171
2,938
3,931
Le Chiffre 1 - Patchawarra Vu
Upper and Vu Lower zones (bcf)
62.9
93.2
132.4
Klebb 1 - Patchawarra Vu Upper
zone 9 (bcf)
42.1
62.2
93.3
Such statements relate to future events and expectations and as such involve known and
unknown risk and uncertainties, many of which are outside the control of Strike Energy
Limited. Actual results, actions and developments may differ materially from those expressed
or implied by the statements in this presentation.
Total Gross Contingent Resource
(bcf)
105.00
155.4
225.7
1.
Subject to any continuing obligations under applicable law and the Listing Rules of ASX
Limited, Strike Energy Limited does not undertake any obligation to publicly update or
revise any of the forward looking statements in this presentation or any changes in events,
conditions or circumstances on which any such statement is based.
Contingent Resource Estimates have been prepared in accordance with the Petroleum
Resources Management System “PRMS”. Contingent Resource Estimates are those
quantities of gas (produced gas less carbon dioxide and fuel gas) that are recoverable
from known accumulations but which are not yet considered commercially recoverable.
2.
1C, 2C and 3C estimates in this table are P90, P50 and P10 respectively for each well and
have been summed arithmetically
3.
Net to Strike’s 66.7% interest in PEL 96
Strike Energy Limited - Quarterly Report: September 2015
10
Important Notice: continued
Competent Persons Statement
The information in this presentation that relates to the PEL 96 contingent resources estimate
has been taken from the independent reports as prepared by DeGolyer and MacNaughton,
a leading independent international petroleum industry consultancy firm, and has been
reviewed by Mr Chris Thompson (Chief Operating Officer of the Company). All other reported
resource and or reserves information in this presentation is based on, and fairly represents,
information prepared by, or under the supervision of Mr Thompson.
Mr Thompson holds a Graduate Diploma in Reservoir Evaluation and Management and
Bachelor of Science Degree in Geology. He is a member of the Society of Petroleum Engineers
and has worked in the petroleum industry as a practicing reservoir engineer for over 20 years.
Mr Thompson is a qualified petroleum reserves and resources evaluator within the meaning
of the ASX Listing Rules and consents to the inclusion in this release of the resource and or
reserves information in the form and context in which that information is presented.
About DeGolyer and MacNaughton
The information contained in this release pertaining to the PEL 96 contingent resources
estimate is based on, and fairly represents, information prepared under the supervision of Mr
Paul Szatkowski, Senior Vice President of DeGolyer and MacNaughton. Mr Szatkowski holds
a Bachelor of Science degree in Petroleum Engineering from Texas A&M, has in excess of 40
years of relevant experience in the estimation of reserves and contingent resources, and is a
member of the International Society of Petroleum Engineers and the American Association of
Petroleum Geologists. Mr Szatkowski is a qualified petroleum reserves and resources evaluator
within the meaning of the ASX Listing Rules and consents to the inclusion of the contingent
resource estimate related information in the form and context in which that information is
presented.
While not yet commercial, these results confirm that the coals will be capable of substantial
gas production rates and highly economic per well recoveries as the reservoir pressure is
reduced at increasing distances from the wells.
Strike Energy Limited - Quarterly Report: September 2015
11
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
STRIKE ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
59 078 012 745
30 September 2015
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
Receipts from product sales and related debtors
Payments for (a) exploration & evaluation
(b) development
(c) production (1)
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (2)
547
(3,799)
(11)
(747)
(1,090)
‐
‐
‐
‐
‐
8,573
547
(3,799)
(11)
(747)
(1,090)
‐
‐
‐
‐
‐
8,573
Net operating cash flows
3,473
3,473
‐
‐
(3)
‐
‐
(3)
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
(3)
(3)
3,470
3,470
Cash flows related to operating activities
1.1
1.2
1.3
1.4
1.5
1.6
1.7
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
(1) Production payments for the current quarter and on a YTD basis include prepayments made under an existing gas transmission
agreement for the Groups US assets totalling $US 338K.
(2) Other for the current quarter and on a YTD basis includes the receipt of $ 8.5 million from the ATO received as a result of the eligible R&D
activities undertaken during this FY 15 year.
+ See chapter 19 for defined terms.
17/12/2010
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
3,470
3,470
Proceeds from issues of shares, options (net of costs)
Proceeds from sale of forfeited shares
Proceeds from borrowings (2)
Repayment of borrowings
Dividends paid
Other:
a. Interest and other cost of financing paid
b. Interest & other items of a similar nature received
‐
‐
750
(6,046)
‐
‐
‐
750
(6,046)
‐
(390)
35
(390)
35
Net financing cash flows
(5,651)
(5,651)
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Net decrease in cash held
(2,181)
(2,181)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
11,694
40
11,694
40
1.22
Cash at end of quarter
9,553
9,553
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2 (a)
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
347
‐
Explanation necessary for an understanding of the transactions
(a) In addition to the respective salary and fee payments made to Directors, during the quarter, the Group also made payments to M H
Carnegie & Co Pty Ltd (a director related entity via Mr M Carnegie) under the terms of an office leasing agreement ($34,347).
Non‐cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
N/A
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reporting entity has an interest
N/A
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
$A’000
3.1
Loan facilities (1) (2)
3.2
Credit standby arrangements
Amount used
$A’000
10,179
6,929
‐
‐
(1) The Group continues to be a party to both the BlueRock Facility and the Orica Facility on the same terms and conditions as disclosed in the annual
financial report for the year ended 30 June 2015.
(2) During the Quarter, the Group repaid in full the $5.9 million outstanding under the terms of the FY 15 Macquarie Facility from the proceeds of its
FY 15 R&D refund. On 21 September 2015, the Group executed an amendment to the FY 15 Macquarie Facility (the FY 16 Macquarie Facility) to
provide pre‐funding for eligible Research and Development (R&D) expenditure to be incurred during the year ended 30 June 2016. The FY 16
Macquarie Facility has a limit of $4.0 million which can be drawn down after the related eligible R&D expenditure incurred is validated by the
Group’s R&D advisors in accordance with the prescribed ATO guidelines and requirements. The FY 16 Macquarie Facility is collateralised in full
from the proceeds of the Company’s 2016 R&D refund which is anticipated to be received by November 2016. An initial draw down of $750,000
under the terms of the FY 16 Macquarie Facility was made on 29 September 2015.
+ See chapter 19 for defined terms.
Appendix 5B Page 2
31/03/2015
Appendix 5B
Mining exploration entity quarterly report
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
3,574
4.2
Development
‐
4.3
Production
359
4.4
Administration
984
Total
4,917
The above estimated cash outflows for the next quarter do not take into account the benefit of cash inflows from the sale of production
or forward gas sales prepayment agreements, cash inflows associated with committed lines of financing and the effect of other cash flow
positive activities.
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown
in the consolidated statement of cash flows) to the
related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Current quarter
$A’000
Previous quarter
$A’000
6,096
8,199
Deposits at call
19
19
5.3
Bank overdraft
‐
‐
5.4
Other – Share of JV bank accounts
3,438
3,476
Total: cash at end of quarter (item 1.22)
9,553
11,694
Changes in interests in mining tenements
Tenement
reference
6.1
6.2
Interests in mining
tenements relinquished,
reduced or lapsed
Interests in mining
tenements acquired or
increased
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
N/A
N/A
+ See chapter 19 for defined terms.
17/12/2010
Appendix 5B Page 3
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference +securities
(description)
Changes during quarter
(a) Increases through issues
(b) Decreases through returns of
capital, buy‐backs, redemptions
+Ordinary securities
7