December 2015 - Quarterly Report & Appendix 5B
Released
Released
Announcement PDF
STRIKE ENERGY LIMITED
QUARTERLY REPORT
For the period ending 31 December 2015
Strike Energy Limited - Quarterly Report: September 2014
September Quarter Performance Summary
Key Achievements
Australia
Record gas flow rates
Southern Cooper
Basin Gas Project
Key reservior parameters point to highly commercial well productivity
Klebb pilot accessing a larger reservoir volume than expected – potential for increased well recoveries
Low cost pump capacity increase underway
Cash on hand of $6.4 million at the end of the quarter – fully funded to meet forward program
Strong Funding
and Commercial Position
Scoping and preliminary design confirms that development of an independent, low cost modular gas processing
and compression facility in PEL 96 (Demonstration Facility) is technically and commercially feasible
In principal agreement to collaborate on the development, funding and operation of the Demonstration Facility
with a leading midstream gas infrastructure owner and operator
Progressed discussions for the sale of gas produced by the Demonstration Facility with significant market interest
to contract further gas on a full production basis
Strike Energy Limited - Quarterly Report: December 2015
1
Managing Director’s Comments
I am pleased to report on another active quarter for Strike. During the quarter
we focused on the Phase 3 extended flow test program, with excellent progress
resulting in record gas flow rates from the Klebb pilot by quarter end.
At this stage, it is worth recapping on our progress to date and how we are tracking
towards our objective of commercialising the Southern Cooper Basin Gas Project.
The data we have now obtained from the extended testing of the Klebb wells is
building a very exciting picture of the reservoir.
Firstly, the Klebb pilot is reducing the average reservoir pressure over a much larger
than expected area around the wells. We are very pleased with this result which we
expect will lead to the potential for increased ultimate gas recoveries per well.
Secondly, gas flow rates increase sharply following incremental increases in water
production above a threshold reservoir inflow rate. Assessment of the test data
indicates that the increase in gas production is sourced from a limited volume of
coal very close to individual well bores.
The gas flows being generated by relatively small coal volumes around the wells,
when extrapolated to the large reservoir volumes the wells are actually seeing,
indicates that the full productive potential of the wells is well above threshold
commercial rates.
Demonstration Facility were also progressed with finalisation of these discussions
anticipated in the near term.
The Company has also progressed discussions for the sale of gas from the
Demonstration Facility with strong interest from customers in the South Australian
gas market, where gas prices have been steadily increasing.
During January a new well, Klebb 4, was drilled to support the next phase of
development of the project. The drilling program was successfully completed and
established a materially lower well cost benchmark for the project. Once completed
and tied in, the well will accelerate progression to production growth from the
Klebb pilot.
The excellent progress we are making, set against a domestic market
characterised by low service costs and strengthening gas prices, provides the ideal
platform and timing to accelerate development activities through 2016. Strike’s
strategic ‘domestic’ objective to develop a project with the potential to provide
substantial new supply for east coast customers is rapidly gaining industry
support and momentum.
With these key reservoir performance parameters pointing towards a highly
commercial outcome, our focus is on accelerating field activities to demonstrate
the full potential of the reservoir. As gas rates have built, we are reaching the limits
of our existing pump capacity and planning for a low cost upgrade of pump capacity
has been completed with work currently underway and scheduled to be completed
and commissioned in March. This upgrade will enable increased water production
rates to be maintained as gas rates build.
The scoping and preliminary design phase for the Demonstration Facility was
also successfully completed confirming that construction and operation of
an independent, low cost gas processing facility in PEL 96 is technically and
commercially feasible. Discussions with a leading midstream gas infrastructure
owner and operator regarding the development, funding and operation of the
Strike Energy Limited - Quarterly Report: December 2015
2
Southern Cooper Basin Gas Project: Strike’s Strategic Objectives
Strategic objectives
Timing
Supply targets
2020/21
Production
FID
Cost competitive third
party gas supply for
LNG exporters
Development
~5 Tcf over 20 years
Equivalent to gas supply
for one LNG train
Expanded resource delineation
across STX acreage
2017/18
Production
New source of
affordable gas supply
for east coast domestic
customers
~1 Tcf over 20 years
FID
Initial development
Equivalent to 35%
of NSW gas supply
Current
PEL 96
Appraisal/
Commercialisation
Strike is positioning the Southern Cooper Gas Project as a long-life resource for domestic and export gas supply.
Strike Energy Limited - Quarterly Report: December 2015
3
Strikes Southern Cooper Basin Gas Project: Value Drivers
GAS
MARKET
GAS PROCESSING &
TRANSPORTATION
LOW SUPPLY
COST
Domestic offtake secured
Direct connection to
Eastern Australian gas
markets
STX full lifecycle cost
<$4.50/GJ
GAS
RESOURCE
PEL 96 prospective
resource
4.5 Tcf (net STX)
LNG export market for
competitive gas supply
Midstream gas
infrastructure
Well costs
EUR testing in progress
Strike’s PEL 96 resource is emerging as a compelling project with the value drivers in place to deliver a strong
outcome for shareholders.
Strike Energy Limited - Quarterly Report: December 2015
4
Southern Cooper Basin Gas Project: Quarterly Activities
Klebb pilot highlights
•
Record gas flow rates achieved during the quarter
•
Field measurements confirm that the Klebb pilot is accessing a very large
reservoir volume with only a very limited volume of coal below desorption
pressure
•
Klebb 1 workover completed and stable pump operation established
•
Very high facility availability for jet pump and beam pump operations with
improved operating and maintenance procedures
Good progress has been made at the Klebb pilot during the quarter with record
gas rates being recorded and water flows 50% higher than the previous quarter.
This improved performance was a direct result of the fracture stimulation and
recompletion of the Klebb 2 and Klebb 3 wells, combined with very high facility
availability resulting from improved operating and maintenance procedures and the
relocation of the Le Chiffre surface pump to Klebb.
Data gathered during the shut-in of Klebb 1 in October confirmed that the average
reservoir pressure continues to be reduced and that the pilot as a whole is accessing
a larger than expected volume. The workover of Klebb 1 was successfully completed
with the well returned to service in November and performance now stabilised and
much improved.
Testing results show flow rates as low as 15 - 20 bwpd above the threshold inflow
rate are sufficient to generate sharp increases in gas rate – implying that the
additional gas quantities are still being sourced from very small volumes of coal
moving below the desorption pressure.
The small reservoir volumes from which gas is currently being desorbed provides
tangible evidence that ongoing testing will yield commercial gas rates as we
increase the portion of the Klebb reservoir volume that is producing gas.
While the existing Klebb pilot pump infrastructure is able to establish water flow
rates above the threshold rate, water production starts declining as gas rates
increase due to reduced pump efficiency caused by “cavitation” effects in the
downhole jet pump configuration. As a result, after creating and initiating an
incremental expansion of the low pressure zone, increased gas production impacts
pump efficiency and the low pressure zone and gas rates stabilise.
Ongoing improvements in pump configuration and operating procedures are proving
effective in maintaining water producing rates for longer periods as gas rates
increase.
As a result of the reservoir pressure reduction to date and improved performance
of Klebb 2 and Klebb 3, very encouraging and significant improvements in gas flows
have been recorded when water production is maintained above a rate of between
400 – 450 bwpd at each of Klebb 2 and 3.
The sharp increases in gas rate achieved when water rates are maintained above this
threshold rate result from more coal reaching the critical desorption pressure.
This threshold rate is equivalent to the formation inflow rate for current reservoir
conditions. Water production above the formation inflow rate expands the low
pressure zone around the well while production at or below the inflow rate results in
a static or shrinking low pressure zone with gas production tending to stabilise.
Strike Energy Limited - Quarterly Report: December 2015
5
Southern Cooper Basin Gas Project: Project Status
Klebb Facility Pump Upgrade
In order to increase and maintain water rates above the threshold inflow rate and
further build gas rates, an additional surface pump with a higher pressure capacity
will be installed in the March quarter. This new pump will:
Importantly, Klebb 4 is the lowest cost well which Strike has drilled to date, with
cost reductions realised through improved well design, drilling performance and
lower drilling and service costs.
•
Enable the installation of a revised downhole jet pump configuration in Klebb 2
and Klebb 3 with reduced sensitivity to cavitation and allow higher water rates
to be realised and maintained as gas rates build.
A large fracture stimulation is planned for Klebb 4, following which the well will be
tied into existing infrastructure. Once tie-in is complete, Klebb 4 will contribute to
the ongoing testing activities at Klebb by accelerating the growth of the existing low
pressure zone at Klebb and provide increased well redundancy across the pilot.
•
Allow stable water rates to be maintained if jet pump efficiency drops by
increasing surface pump pressure.
The cost of the completion work is forecast to be well below previous programs and
will lead to a material reduction in full field drilling and completion cost estimates.
Klebb 4
Following quarter end, the Klebb 4 well was drilled to a total depth of 2,188m and
cased with 5-1/2” casing. Klebb 4 is a pre-development well which was directionally
drilled and cased with larger 5.5” casing to facilitate increased water and gas
production capacity.
The drilling program was completed without any material safety or environmental
incidents and within budget. The objective of the Klebb 4 well is to validate
development plan assumptions relating to drilling and completions by:
•
Successfully drilling a deviated well.
•
Establish a lower well cost structure by drilling and completing a “development”
type well by trialling the use of real time logging equipment in a directional well
to eliminate conventional logs.
•
Establishing lower drilling and completion cost benchmarks for the project
•
Performing a large fracture stimulation of the Vu Upper zone and installing a
larger downhole jet-pump completion than previously utilised.
The bottom hole location of Klebb 4 is approximately 300m SE of the midpoint
between the Klebb 1 and Klebb 3 wells. The directional program has validated the
multi-well pad design on which the field development concept is based.
Strike Energy Limited - Quarterly Report: December 2015
6
Southern Cooper Basin Gas Project: Klebb 4
Klebb 4
1,000m
Klebb 1, 2 & 3
1,100m
Toolachee Formation (36m net coal)
Epsilon Formation (23m net coal)
Vm3 (15m net coal)
Vu upper (34m net coal)
Patchawarra
Formation
Vu lower (15m net coal)
Strike Energy Limited - Quarterly Report: December 2015
7
Southern Cooper Basin Gas Project: PEL 96 Commercialisation Strategy
Objective
Funded (1)
Infill wells
Increased
reserves and
resources
Commence Q1 2016
Objective
Incremental pilot wells + testing
Continue Klebb pilot production
Phase 4
Pre-development activities
Commence Q3 2015
Funded (1)
Frac Klebb 2 & 3
Phase 3
Install new pumps at Klebb 1, 2 & 3
Klebb initial pilot test
Completed
Commence Q1 2015
Continue testing Le Chiffre 1 and Klebb 1-3
Install new pump at Klebb 1
Understand multi-well pressure drawdown
effects
Phase 2
Dec 2014
Completed
Phase 1
Single well tests
Le Chiffre 1 and Klebb 1
Drill and complete Klebb
2 and 3
Demonstration
project
Planning
Objective
Commercial
gas flows
Initial reserves
Progressing towards
commercial gas
flows
Objective
Build gas flows
(in progress)
Objective
Sustained gas flows
Technical feasibility
Commercial feasibility
(1) Funded from existing cash resources
A disciplined, capital efficient and funded appraisal program is being followed to establish commerciality
Strike Energy Limited - Quarterly Report: December 2015
8
US Operations: Production and Operations Update
US Exploration and Evaluation Activities
The Company continues to hold its interests in the Permian Basin, Eagle Ford Shale and
Eagle Landing Joint Ventures with no exploration and/or field development activities
occurring during the quarter.
EAGLE LANDING JOINT VENTURE
The Company has no plans for further investment into these projects in the near term.
US Production
Strike currently produces oil and gas from three independent assets. Total oil
production for the quarter was 3,058 bbls down 18% on the prior quarter and gas
production was 66,937 Mcf down 4% on the prior quarter.
DEC QTR 2015
SEP QTR 2015
QUARTERLY
CHANGE
Gas (Mcf)
63,790
65,598
(3%)
Oil (Bbl)
1,209
1,218
(1%)
Total Revenue (USD’000)
190
232
(18%)
PERMIAN BASIN – MB CLEARFORK PROJECT
Gas (Mcf)
2,683
3,485
(23%)
Oil (Bbl)
1,254
1,860
(33%)
The Eagle Landing Joint Venture (Strike 40% WI) produced 63,790 Mcf of gas and 1,209
bbls of oil net to Strike during the quarter, down 3% for gas and down 1% for oil on the
previous quarter. The decrease in production for the quarter is a result of the well’s
natural production decline.
Total Revenue (USD’000)
61
99
(38%)
Gas (Mcf)
465
537
(13%)
Oil (Bbl)
596
647
(8%)
The MB Clearfork Project (Strike 25% WI) produces oil from 20 conventional Permian
Basin wells in Martin County, Texas. During the quarter, the MB Clearfork Project
produced 2,683 Mcf of gas and 1,254 bbls of oil net to Strike, down 23% for gas and
down 33% for oil from the previous quarter. The decrease in gas production for the
quarter is due to issues experienced with certain salt water injection wells, which
continued to be monitored.
Total Revenue (USD’000)
24
29
(17%)
Gas (Mcf)
66,937
69,620
(4%)
Oil (Bbl)
3,058
3,725
(18%)
Total Revenue (USD’000)
275
360
(24%)
Total Revenue (AUD’000)
382
496
(23%)
The Eagle Ford shale project (Strike 27.5% WI) produces oil and gas from the Bigham
1H well in Fayette County, Texas. The well produced 465 Mcf of gas and 596 bbls of
oil net to Strike during the quarter, down 13% for gas and down 8% for oil on the
previous quarter. The decrease in gas production for the quarter is as a result of minor
compressor problems and well mainenance during the quarter.
EAGLE FORD SHALE – BIGHAM 1H
TOTAL
Based on industry convention energy equivalence 6 Mcf of gas = 1 Bbl of oil
Average realised prices during the quarter were US$40.87/Bbl, down 11% from
US$46.17/Bbl in the previous quarter for oil and US$2.24/Mcf, down 17% from
US$2.70/Mcf for gas in the previous quarter.
Strike Energy Limited - Quarterly Report: December 2015
9
Finance, Commercial and Corporate Update
During the December quarter, the Company continued to advance
Corporate Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
E: strike@strikeenergy.com.au
W: www.strikeenergy.com.au
a number of its financial and commercial initiatives in support of
the appraisal and accelerated development and commercialisation
of the SCBGP.
Key highlights include:
•
Registered Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
Securities Exchange
•
ASX : STX
Securities on Issue
Shares: 833,330,946
Options: 11,200,000
Performance Rights: 28,950,000
Analyst Coverage
Firm
Red Leaf Securities
Ord Minnett
Euroz
Bell Potter
Analyst
Andrew Williams
John Young
Michael Skinner
Peter Arden
management, operational and financial capabilities to develop
a new midstream gas infrastructure asset. Once executed, the
MOU will provide the parties with a framework to negotiate the
underlying operational, commercial and funding arrangements
to support this initiative.
•
Planning continued for a demonstration scale, modular gas
processing facility (Demonstration Facility) to process, compress
and deliver sales gas produced from the multi-well testing
program within PEL 96 into the Moomba to Adelaide pipeline.
A scoping and preliminary design phase for the Demonstration
Facility was successfully completed confirming that construction
and operation of an independent, low cost gas processing
facility in PEL 96 is technically and commercially feasible.
Two leading engineering contractors have now been invited
to independently develop their engineering design and cost
proposals for the Demonstration Facility. It is expected that this
work will be completed in the June 2016 quarter with the award
of an EPC contract to the preferred engineering contractor.
The objective of this Demonstration Facility is to validate the
technical and commercial feasibility of a new standalone in-field
gas processing and compression system. The Facility is being
designed so that it can be rapidly and cost effectively scaled up
to support future production growth from the Southern Cooper
Basin Gas Project.
In parallel with these engineering and design activities, the
Company has agreed a Memorandum of Understanding (MOU)
to collaborate on the development, funding and operation
of the Demonstration Facility with a leading midstream
gas infrastructure owner and operator. This innovative and
collaborative approach will allow Strike to focus its’ capital
and expertise on the acceleration of production and reserves
growth while allowing the partner to use their substantial asset
Strike Energy Limited - Quarterly Report: December 2015
•
The Company has also progressed discussions for the sale of
processed gas on an interruptible basis from the Demonstration
Facility.
•
The Company expects to formally announce the finalisation of
both of these commercial initiatives over coming weeks.
•
Following the execution of the amendment to the Macquarie
R&D Facility (as announced in the September 2015 quarterly
update) an additional $1.1 million was drawn down during the
quarter based upon the Company’s anticipated eligible R&D
expenditure for the 2016 financial year.
The MOU initiative, the level of interest from major domestic
South Australian and east coast gas consumers to buy gas from the
Demonstration Facility and to secure longer term gas supplies from
an independent producer, such as Strike, reinforce the commercial
potential of the SCBGP in the domestic gas market – a market that
has been permanently changed by the commencement of LNG
exports from Gladstone.
The Company completed the quarter with $6.4 million cash on
hand and is well placed to continue its’ field operations and next
stage design activities for the Demonstration Facility.
10
Strike’s Southern Cooper Basin Gas Project: Gas resource
Prospective
Resource
PEL 96
4,492 Bcf*
PEL 96 Phase
One Area
1,123Bcf*
Moomba
2C
Contingent
Resource*
Marsden 1
104 Bcf
Davenport 1
PEL 94
STX 35%
PEL 95
STX 50%
Mount Isa
Gladstone
Le Chiffre 1
Klebb production
testing area
Moomba
PELA 640
STX 100%
Brisbane
PEL 96
STX 66.67%
0
20
Sydney
Adelaide
Kilometers
PEL 96 Phase One Area
Strike Phase One Area wells drilled
Gas Pipeline
Strike Wells Drilled
Oil Pipeline
PEL 96 Offset Wells
Strzelecki Track
PEL 96 and PELA 640 - STX Operated
Hobart
* Mean estimate (net to Strike determined on a probalistic basis) per ASX announcement dated 19 Feb 2014 and adjusted for announced
contingent resource estimate per ASX announcement dated 27 April 2015.
** The estimated quantities of petroleum that may potentially be recovered by the application of a future development project relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration
appraisal and evaluation is required to determine the existence of a significant quantity of potentially movable hydrocarbons.
PEL
Net STX Acres
PEL 94
77,925
PEL 95
160,248
PEL 96
443,880
PELA 640
850,786
Total
1,532,839
Strike has an ideally positioned long-life multi-Tcf resource
directly connected to the ~40 Tcf Eastern Australian gas market
Strike Energy Limited - Quarterly Report: December 2015
11
Important Notice
This presentation does not constitute an offer, invitation or recommendation to subscribe for,
or purchase any security and neither this presentation nor anything contained in it shall form
the basis of any contract or commitment.
Reliance should not be placed on the information or opinions contained in this presentation.
This presentation does not take into consideration the investment objectives, financial
situation or particular needs of any particular investor. Any decision to purchase or subscribe
for any shares in Strike Energy Limited should only be made after making independent
enquiries and seeking appropriate financial advice.
No representation or warranty, express or implied, is made as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Strike Energy Limited and its affiliates
and related bodies corporate, and their respective officers, directors, employees and agents
disclaim liability (including without limitation, any liability arising from fault or negligence) for
any loss arising from any use of or reliance on this presentation or its contents or otherwise
arising in connection with it.
Contingent Resource Estimate
DeGolyer and MacNaughton was engaged by Strike to undertake an Independent Review of
the gas resource in PEL 96 based on the data and information acquired to date by Strike from
the drilling and flow testing programs carried out at the Le Chiffre 1 and Klebb 1, Klebb 2 and
Klebb 3 wells.
DeGolyer and MacNaughton has estimated a contingent gas resource on a probalistic basis for
the initial zones that have been flow tested within the Le Chiffre 1 and Klebb 1 wells. As these
zones only represent a portion of the net coal encountered at these locations, successful flow
testing of additional zones will enable an increased contingent resource to be booked.
The table below summarises the Contingent Resource Estimates.
Contingent Gas Resource Estimates - PEL 961
Well
1C2
2C2
3C2
Statements contained in this presentation, including but not limited to those regarding the
possible or assumed future costs, performance, dividends, returns, production levels or
rates, oil and gas prices, reserves, potential growth of Strike Energy Limited, industry growth
or other projections and any estimated company earnings are or may be forward looking
statements.
Productive area (acres)
2,171
2,938
3,931
Le Chiffre 1 - Patchawarra Vu
Upper and Vu Lower zones (bcf)
62.9
93.2
132.4
Klebb 1 - Patchawarra Vu Upper
zone 9 (bcf)
42.1
62.2
93.3
Such statements relate to future events and expectations and as such involve known and
unknown risk and uncertainties, many of which are outside the control of Strike Energy
Limited. Actual results, actions and developments may differ materially from those expressed
or implied by the statements in this presentation.
Total Gross Contingent Resource
(bcf)
105.00
155.4
225.7
1.
Subject to any continuing obligations under applicable law and the Listing Rules of ASX
Limited, Strike Energy Limited does not undertake any obligation to publicly update or
revise any of the forward looking statements in this presentation or any changes in events,
conditions or circumstances on which any such statement is based.
Contingent Resource Estimates have been prepared in accordance with the Petroleum
Resources Management System “PRMS”. Contingent Resource Estimates are those
quantities of gas (produced gas less carbon dioxide and fuel gas) that are recoverable
from known accumulations but which are not yet considered commercially recoverable.
2.
1C, 2C and 3C estimates in this table are P90, P50 and P10 respectively for each well and
have been summed arithmetically
3.
Net to Strike’s 66.7% interest in PEL 96
Strike Energy Limited - Quarterly Report: December 2015
12
Important Notice: continued
Competent Persons Statement
The information in this presentation that relates to the PEL 96 contingent resources estimate
has been taken from the independent reports as prepared by DeGolyer and MacNaughton,
a leading independent international petroleum industry consultancy firm, and has been
reviewed by Mr Chris Thompson (Chief Operating Officer of the Company). All other reported
resource and or reserves information in this presentation is based on, and fairly represents,
information prepared by, or under the supervision of Mr Thompson.
Mr Thompson holds a Graduate Diploma in Reservoir Evaluation and Management and
Bachelor of Science Degree in Geology. He is a member of the Society of Petroleum Engineers
and has worked in the petroleum industry as a practicing reservoir engineer for over 20 years.
Mr Thompson is a qualified petroleum reserves and resources evaluator within the meaning
of the ASX Listing Rules and consents to the inclusion in this release of the resource and or
reserves information in the form and context in which that information is presented.
About DeGolyer and MacNaughton
The information contained in this release pertaining to the PEL 96 contingent resources
estimate is based on, and fairly represents, information prepared under the supervision of Mr
Paul Szatkowski, Senior Vice President of DeGolyer and MacNaughton. Mr Szatkowski holds
a Bachelor of Science degree in Petroleum Engineering from Texas A&M, has in excess of 40
years of relevant experience in the estimation of reserves and contingent resources, and is a
member of the International Society of Petroleum Engineers and the American Association of
Petroleum Geologists. Mr Szatkowski is a qualified petroleum reserves and resources evaluator
within the meaning of the ASX Listing Rules and consents to the inclusion of the contingent
resource estimate related information in the form and context in which that information is
presented.
While not yet commercial, these results confirm that the coals will be capable of substantial
gas production rates and highly economic per well recoveries as the reservoir pressure is
reduced at increasing distances from the wells.
Strike Energy Limited - Quarterly Report: December 2015
13
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
STRIKE ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
59 078 012 745
31 December 2015
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
Receipts from product sales and related debtors
Payments for (a) exploration & evaluation
(b) development
(c) production (1)
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (2)
426
(3,763)
(297)
(744)
240
973
(7,562)
(11)
(1,044)
(1,833)
8,813
Net operating cash flows
(4,138)
(664)
(8)
(11)
-
-
(8)
(11)
(4,146)
(675)
Cash flows related to operating activities
1.1
1.2
1.3
1.4
1.5
1.6
1.7
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
(1) Production payments on a YTD basis include prepayments made under an existing gas transmission agreement for the Groups US assets
totalling $US 338K.
(2) Other on a YTD basis includes the receipt of $ 8.5 million from the ATO received as a result of the eligible R&D activities undertaken during
this FY 15 year.
+ See chapter 19 for defined terms.
17/12/2010
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(4,146)
(675)
1,100
(36)
-
1,850
(6,082)
-
(185)
25
(575)
60
Net financing cash flows
904
(4,747)
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Proceeds from issues of shares, options (net of costs)
Proceeds from sale of forfeited shares
Proceeds from borrowings (2)
Repayment of borrowings
Dividends paid
Other:
a. Interest and other cost of financing paid
b. Interest & other items of a similar nature received
Net decrease in cash held
(3,242)
(5,422)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
9,553
50
11,694
89
1.22
Cash at end of quarter
6,361
6,361
Payments to directors of the entity and associates of the directors
Payment
Share your feedback