Highlights
•
Final investment decision (FID) taken for the South Erregulla 85 MW fully integrated
peaking gas power station.
•
Flow testing at Erregulla Deep confirmed a significant gas discovery with stabilised
flow rates limited by surface equipment of 53 mmscf/d with a flowing well head
pressure of 5,515 psi on a 46/64” choke.
•
Drilling at Walyering East-1 identified a potential gas discovery with 13.4m of net gas
pay, maximum porosities of 16% and pressures of 4,953 psi.
•
The West Erregulla L25/EP469 Joint Venture received primary environmental
approvals for the development of the upstream infrastructure.
Comments from Executive Director, Jill Hoffmann:
“The quarter was highlighted by the sanctioning of the South Erregulla fully integrated 85 MW
peaking gas power station consistent with Strike’s Gas Acceleration Strategy. The project has
now moved into the execution phase and will be supported by the financing package to be
provided by Macquarie Bank.
Furthermore, a significant new gas discovery at Erregulla Deep was confirmed via testing, and
independent analysis indicates a potential new gas discovery at Walyering East-1, subject to
testing.
Subsequent to the quarter, CEO & MD, Stuart Nicholls departed after 8 years in the role. Mr
Nicholls leaves the company well positioned to develop its significant gas reserves in the
Perth Basin, and to continue to grow its portfolio via further exploration and appraisal.
I look forward to guiding Strike through the transition as Acting CEO and as the Board
undertakes a Strategic Review of the company’s project portfolio with the objective of
maximising value for all Strike shareholders.”
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 8 7099 7400
E: strike@strikeenergy.com.au
Level 1, 40 Kings Park Road
West Perth WA 6005
Key Performance Metrics
Sep Q1
FY25
Dec Q2
Q1 FY25
Qtr on Qtr
change
FY24
YTD
FY25
YTD
Change
(PJe net)
2.40
2.25
(6%)
1.94
4.66
>100%
(PJe net)
2.40
2.25
(6%)
1.07
4.66
>100%
18.28
17.53
(4%)
14.77
35.81
>100%
18.28
17.53
(4%)
8.13
35.81
>100%
Cash and cash equivalents
44.52
33.13
(26%)
66.78
33.13
(50%)
Undrawn debt
17.00
-1
(100%)
46.75
-
(100%)
Total Liquidity
61.52
33.13
(46%)
113.53
33.13
(71%)
Sep Q1
FY25
Dec Q2
Q1 FY25
Qtr on Qtr
change
FY24
YTD
FY25
YTD
Change
PJ
2.31
2.04
(12%)
1.86
4.35
>100%
PJ
2.31
2.04
(12%)
1.02
4.35
>100%
kbbl
16.78
14.01
(17%)
14.89
30.79
>100%
kbbl
16.78
14.01
(17%)
8.19
30.79
>100%
PJe
2.40
2.13
(11%)
1.94
4.53
>100%
PJe
2.40
2.13
(11%)
1.07
4.53
>100%
MMboe
0.39
0.35
(11%)
0.32
0.74
>100%
MMboe
0.39
0.35
(11%)
0.16
0.74
>100%
A$ million unless indicated
Sales volume (gross)
Sales volume (net to Strike)
Sales revenue (gross)
Sales revenue (net to Strike)
Key Production Metrics
Production by product
Sales gas (gross) 2
Sales gas (net to strike)
Condensate (gross)
Condensate (net to strike)
Total production (gross)
Total production (net to Strike)
Total production (gross)
Total production (net to Strike)
Note: Net to Strike is 55% equity to 31 Dec 2023 and 100% thereafter.
WA Energy Market Conditions Support Asset Value Growth
•
WA gas market conditions softened but remain
high with maximum spot prices at an average of
$8.38 per gigajoule 3.
•
All-time maximum operational demand record
of 4,486 MW in the South West Interconnect
System (SWIS) on 20 February 2025, reflecting
continuing increase in electricity demand
across the economy.
•
Electricity markets continue to be a major driver
of gas demand and pricing dynamics, with gas
contributing significantly to the electricity fuel
mix during the quarter.
•
Benchmark Reserve Capacity Price for the
2027-28 capacity year of ~$361k per MW per
annum published, an increase of 57% from the previous year.
1 Subject to execution of definitive financing documentation, see ASX release dated 30 Jan 2025 entitled “Credit approval for $162 million development facility”.
2 Sales gas production includes gas invoiced in a prior period and taken as ‘banked gas’ pursuant to the ‘Take or Pay’ contract with Santos WA Ltd.
3 Prices sourced from Gas Trading Australia Pty Ltd: https://www.gastrading.com.au/spot-market/historical-prices-and-volume/price-history-table.
2
•
Energy Offer Price Ceiling increased by 36% to $1,000/MWh effective 1 January 2025.
•
Volume weighted average cost for electricity in WA was $78/MWh, with average peak
electricity price (4pm – 9pm) of $160/MWh.
Production, Exploration & Development
Walyering (L23 & EP447, 100% and operator)
•
Produced ~2.1 PJe of gas and
condensate or just over 22 TJ/d of
sales gas and 150 bbls/d of
condensate.
•
Production reduced by 11%
quarter-on-quarter largely due to
10 days of planned annual facility
maintenance.
•
Walyering-7 tie-in complete,
approved for startup by the
regulator in late December and
brought into production.
•
Walyering East-1 exploration well
successfully drilled to 3,858m
measured depth (MD).
•
o
Prospectivity observed in the
D-Sands
within
the
Cattamarra Formation.
o
Independent
petrophysical
assessment indicates at least
13.4m of net gas pay in two
distinct blocks from a 42.7m
gross interval with maximum
porosities of 16% and an
average of 12%, and reservoir
pressures of 4,953 psi (also
indicating a gas gradient).
o
Well cased, to be prepared for
a production test where gas
samples will be collected and,
subject to the results of the
sampling,
a
discovery
declared.
APA Group completed the construction of the inter-pipeline connection at Mondarra with
commissioning ongoing.
3
West Erregulla (L25 & EP469, STX 50% and operator)
•
Received final key environmental approvals for the development of the upstream
infrastructure for the West Erregulla gas field under the Commonwealth’s Environment
Protection and Biodiversity Act 1999.
•
Submitted the Erregulla Deep-1 discovery assessment report to the regulator.
•
Prepared for the Natta 3D seismic survey, which should provide high resolution definition of
the Erregulla Deep gas discovery and improved structural definition across the northern
extent of the West Erregulla gas field.
South Erregulla (L24, STX 100% and operator)
•
Final Investment Decision taken for the fully integrated 85 MW South Erregulla peaking gas
power plant project (the Project), following the award of Reserve Capacity Credits
commencing in the 2026-27 capacity year and Network Access Quantity.
•
The Project will deliver 85 MW of firming power into the SWIS via a connection to the existing
132 kV line between Geraldton and Three Springs.
•
The Project will be constructed on the 3,500ha strategic landholding known as The Precinct,
which sits above the South Erregulla gas field and on Production Licence L24, all of which are
100% owned by Strike.
•
Key economic inputs and outputs for the Project and on which FID was based include:
Key Economic Input / Output
Start date
01-Oct-26
Operating life
21 years
South Erregulla Independently Certified 2P Reserves 4
45 PJ
Capex (nominal)
$137 million
Opex (2024$)
$7.1 million pa
Modelled utilisation
30%
Average realised energy price (2024$)
$135 MWh
Reserve capacity price (Year 1) (nominal)
$216k per MW pa
Reserve capacity price (Year 2) (nominal)
$354k per MW pa
Forecast average reserve capacity price (Years 3+) (nominal)
$258k per MW pa
NPV₈ (Pre-tax unlevered) 6
$250 million
IRR
27%
5
Refer to ASX announcement dated 28 November 2024 entitled “South Erregulla Peaking Gas Power Station Final
Investment Decision” for further details and the assumptions on which the above inputs/outputs are based.
Revenue estimates are based on energy and capacity price forecasts from Strike’s independent consultants.
•
Post FID, Benchmark Reserve Capacity Price for the 2027/28 Capacity Year was published
as $362k per MW per annum. A 57% increase from the previous year.
4 Refer Important Notices for Reserves information. Supports plant operating life at ~2 PJs per annum.
5 Draft Benchmark Reserve Capacity Price published by the Economic Regulation Authority on 6 November 2024 and is subject to change on final Capacity Price release by
AEMO on 1 October 2025.
6 Pre-tax NPV uses an 8% discount rate versus traditional 10% for Aus O&G projects due to large percentage of underwritten revenues by AAA-credit rated WA Government
through capacity payments.
4
Ocean Hill (EP495, STX 100% and operator)
•
Progressed final mapping and interpretation of the Ocean Hill 3D as Strike assesses the asset
for future drilling opportunities.
Arrino-Kadathinni (EP503, 504 & 505, STX 100% and operator)
•
Completed processing of the Kadathinni 2D seismic survey with mapping and interpretation
ongoing as Strike assesses the assets for future drilling opportunities.
L7 Joint Venture (L7, STX 25% and non-operator)
•
Operator, Triangle Energy, prepared for the drilling of Becos-1, including well pad
construction, which was completed post quarter end.
Financial
•
Total sales revenue decreased 4% quarter on quarter due to planned facility shutdown, largely
offset by higher realised prices.
•
Gas sales revenues totalled ~$16 million. Averaged realised gas prices were ~$7.34 GJ (up 4%
q-o-q). Planned maintenance resulted in lower condensate liftings and sales from Port
Bonython totalling ~$1.53 million (down 25% q-o-q) and averaged ~$122/bbl (1% up q-o-q).
•
Capital expenditure totalled $25.42 million, which included ~$12 million in development costs
at South Erregulla and Walyering, and ~$13.4 million in exploration expenditure across the
portfolio.
•
Credit approval received for a $162 million committed debt and asset financing facility with
Macquarie Bank Limited to refinance existing $43 million drawn debt and to support
execution of Strike’s Perth Basin projects. A further $55 million ($15 million in asset
financing for the South Erregulla Project and $40 million for the West Erregulla
development) is subject to credit approval from Macquarie Bank Limited. Definitive
documentation for the facilities is expected to be finalised by the end of the current quarter.
Revenue
Note: Net to Strike is 55% equity to 31 Dec 2023 and 100% thereafter.
Sep
Q1
FY25
Dec Q2
Q1 FY25
Qtr on
Qtr
change
FY24
YTD
FY25
YTD
Change
16.23
16.01
(1%)
13.38
32.24
>100%
Gas (net to Strike)
16.23
16.01
(1%)
7.36
32.24
>100%
Condensate (gross)
2.04
1.53
(25%)
1.40
3.57
>100%
2.04
1.53
(25%)
0.77
3.57
>100%
18.28
17.53
(4%)
14.78
35.81
>100%
18.28
17.53
(4%)
8.13
35.81
>100%
A$ million
Sales Revenue
Gas (gross) 7
Condensate (net to Strike)
Total Sales Revenue (gross)
Total Sales Revenue (net to Strike)
Average Realised Prices
Gas
($/GJ)
7.04
7.34
4%
6.94
7.18
4%
Condensate
($/bbl)
121.49
122.16
1%
101.13
121.78
20%
7 Sales gas revenue includes gas banked not taken or produced pursuant to the ‘Take or Pay’ contract with Santos WA Ltd.
5
Capital Expenditure
Sep Q1
FY25
Dec Q2
Q1 FY25
Qtr on
Qtr
change
FY24
YTD
FY25
YTD
Change
Exploration & Appraisal
7.92
13.43
70%
56.37
21.35
(62%)
Development
4.71
11.98
155%
7.27
16.69
130%
12.63
25.42
101%
63.64
38.04
(40%)
Sep Q1
FY25
Dec Q2
Q1 FY25
Qtr on
Qtr
change
FY24
YTD
FY25
YTD
Change
Cash & Cash Equivalents
44.52
33.13
(26%)
66.78
33.13
(50%)
Undrawn Debt
17.00
-
(100%)
46.75
-
(100%)
61.52
33.13
(46%)
113.53
33.13
(71%)
A$ million
8
Total Capital Expenditure
Liquidity
A$ million
Total Liquidity
Corporate & Commercial
•
Strike divested its interest in the Mid-West Geothermal Project (comprising an application
for a geothermal exploration permit) to the original owners of the project in favour of deploying
its capital towards its Gas Acceleration Strategy. The project was divested for nominal
consideration and a full discharge and release of its further obligations under the original
purchase agreement. The issued 6 Class A Convertible Redeemable Performance Shares
and 6 Class B Convertible Redeemable Performance Shares issued to the vendors as part
consideration for the original acquisition will, following Strike shareholder approval to be
sought at the next shareholders’ meeting, be transferred to Strike and cancelled, with
beneficial ownership of those securities held by Strike in the interim.
•
During the quarter $240,701 in payments were made to related parties for director fees.
8 Development expenditure includes Walyering 7 drilling and associated tie back capital.
6
Petroleum Tenements Held at the End of the Quarter
Permit
Type
Basin
Play
Operator
(parent)
STX Interest
Gross Area
(acres)
STX Net Area
(acres)
L23 (Walyering)
Production
Perth Basin
Jurassic Wet
Gas
Strike
100%
18,222
18,222
L24
(South Erregulla)
Production
Perth Basin
Permian Gas
Strike
100%
18,409
18,409
L25 (West Erregulla)
Production
Perth Basin
Permian Gas
Strike
50%
36,914
18,457
L7 (Mount Horner)
Production
Perth Basin
Permian
Gas/Oil
Triangle
25%
37,021
9,255
EP469
(Erregulla Deep)
Exploration
Perth Basin
Permian Gas
Strike
50%
36,911
18,456
Exploration
Perth Basin
Permian Gas
Strike
100%
120,217
120,217
Exploration
Perth Basin
Permian Gas
Strike
100%
92,170
92,170
EP505
Exploration
Perth Basin
Permian Gas
Strike
100%
18,533
18,533
EP506
Exploration
Perth Basin
Permian Gas
Strike
100%
37,066
37,066
Strike
100%
127,849
127,849
Strike
100%
73,390
73,390
Strike
100%
36,572
36,572
Strike
100%
73,637
73,637
Triangle
25%
176,861
44,215
EP503
(Arr-Kadathinni)
EP504
(Arr-Kadathinni)
Jurassic Wet
Gas
Jurassic Wet
Gas
Jurassic Wet
Gas
Jurassic Wet
Gas
Permian
Gas/Oil
EP447 (Wal-East)
Exploration
Perth Basin
EP488
Exploration
Perth Basin
EP489
Exploration
Perth Basin
EP495 (Ocean Hill)
Exploration
Perth Basin
EP437
Exploration
Perth Basin
PPL210 (Aldinga)
Production
Cooper Basin
Shallow Oil
Beach
50%
988
494
PEL 96
Exploration
Cooper Basin
Deep Coal
Strike
67%
668,098
444,953
This report is authorised for release by the Board of Directors.
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
Strike Energy Limited
+61 419 877 137
emma.alexander@strikeenergy.com.au
Media Contacts
Paul Ryan
Sodali & Co.
+61 409 296 511
paul.ryan@sodali.com
Important Notices
Reserves and Resources Information
Unless otherwise stated, references in this Interim Financial Report to the South Erregulla Reserves and
Resources Estimate is to the reserves and resource estimates set out in ASX announcement dated 24th
June 2024 entitled “South Erregulla Reserves”. This announcement is available to view on Strike Energy's
website at www.strikeenergy.com.au. Strike confirms it is not aware of any new information or data that
materially affects the information included in the referenced announcement and that all the material
assumptions and technical parameters underpinning the estimates in that announcement continues to
apply.
7
Forward looking Statements
Statements contained in this Interim Financial Report, including but not limited to those regarding the
possible or assumed future costs, projected timeframes, performance, dividends, returns, revenue, exchange
rates, potential growth of Strike, industry growth, commodity or price forecasts, or other projections and any
estimated company earnings are or may be forward looking statements. Forward looking statements can
generally be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’, ‘outlook’,
‘schedule’, ‘estimate’, ‘target’, ‘guidance’ ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or
similar expressions. Forward looking statements including all statements in this document regarding the
outcomes of preliminary and definitive feasibility studies, projections, guidance on future earnings and
estimates are provided as a general guide only and should not be relied upon as an indication or guarantee
of future performance. These statements relate to future events and expectations and as such involve known
and unknown risks and significant uncertainties, many of which are outside the control of Strike. Actual
results, performance, actions and developments of Strike may differ materially from those expressed or
implied by the forward-looking statements in this Interim Financial Report. Such forward-looking statements
speak only as of the date of this document. Refer to the risk factors set out in Talon Energy Limited’s Scheme
Booklet dated 3 November 2023 in relation to the acquisition by Strike Energy (through its wholly owned
subsidiary) of all of the issued shares in Talon Energy by way of scheme of arrangement pursuant to Part 5.1
of the Corporations Act 2001 (Cth) for a summary of certain general, Strike Energy specific and acquisition
specific risk factors that may affect Strike Energy. There can be no assurance that actual outcomes will not
differ materially from these statements. Investors should consider the forward looking statements contained
in this Interim Financial Report in light of those disclosures. To the maximum extent permitted by law
(including the ASX Listing Rules), Strike and any of its affiliates and their directors, officers, employees,
agents, associates and advisers disclaim any obligations or undertaking to release any updates or revisions
to the information in this document to reflect any change in expectations or assumptions; do not make any
representation or warranty, express or implied, as to the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward-looking statement or any event or
results expressed or implied in any forward-looking statement; and disclaim all responsibility and liability for
these forward-looking statements (including, without limitation, liability for negligence). Nothing in this
Interim Financial Report will under any circumstances create an implication that there has been no change
in the affairs of Strike since the date of this document.
8
Quarterly Activities &
Financials
Q2-FY25
Ensign 970 at Walyering East-1
Cautionary note and disclaimer
Summary information
This presentation contains summary information and statements about Strike Energy Limited (ASX:STX) (Strike), its subsidiaries and their respective activities, which is current as at the date of this
presentation (unless otherwise indicated).
The information in this presentation is general in nature and does not purport to be exhaustive. For example, this presentation does not purport to contain all of the information that investors may require in
evaluating a possible investment in Strike . It has been prepared by Strike with due care but no representation or warranty, express or implied, is provided by Strike in relation to the currency, accuracy,
reliability, fairness or completeness of the information, opinions or conclusions in this presentation.
This presentation should be read in conjunction with Strike’s other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX), which are available on the
ASX website (at www.asx.com.au) and the Strike website (at www.strikeenergy.com.au).
No person other than Strike has authorised or caused the issue, release, submission, distribution or provision of this presentation, or takes any responsibility for, or makes or purports to make,
any statements, representations or undertakings in this presentation. Strike, to the maximum extent permitted by law, expressly excludes and disclaims all liability (including, without limitation, any liability
arising out of fault or negligence on the part of any person) for any direct, indirect, consequential or contingent loss or damage, or for any costs or expenses, arising from the use of this presentation or its
contents or otherwise arising in connection with it. Strike does not make any representations or warranties (express or implied) to you about the currency, accuracy, reliability or completeness of the
information, opinions and conclusions in this presentation (including, without limitation, any financial information, any estimates or projections and any other financial information).
Not an offer, and not investment or financial product advice
This presentation is not a prospectus, product disclosure statement or other disclosure document under the Corporations Act, or other offering document under Australian law or any other law. This
presentation has not been lodged with the Australian Securities and Investments Commission. This presentation, and the information contained in it, is provided for information purposes only and is not an
offer or solicitation or an invitation or recommendation to subscribe for, acquire or buy securities of Strike, or any other financial products or securities, in any place or jurisdiction.
This presentation may not be released to US wire services or distributed in the United States. This presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securities in
the United States or any other jurisdiction in which such an offer would be unlawful. The securities referred to in this document have not been, and will not be, registered under the US Securities Act of 1933
(US Securities Act) and may not be offered or sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US Securities Act and applicable US
state securities laws.
This presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or investment advice (nor tax, accounting or legal advice) or a recommendation
to acquire any securities of Strike. It has been prepared without taking into account the objectives, financial or tax situation or particular needs of any individual. Any investment decision, should be made
based solely upon appropriate due diligence and other inquiries. Before making any investment decision, investors should consider the appropriateness of the information having regard to their own
objectives, financial and tax situation and needs and seek professional advice from their legal, financial, taxation or other independent adviser (having regard to the requirements of all relevant jurisdictions).
Strike is not licensed to provide financial product advice in respect of an investment in securities, and do not purport to give advice of any nature. An investment in any listed company, including Strike, is
subject to risks of loss of income and capital.
Past performance
Past performance metrics and figures, as well as pro forma financial information, included in this presentation are given for illustrative purposes only and should not be relied upon as (and are not) an
indication of Strike’s views on Strike's future financial performance or condition or prospects (including on a consolidated basis). Investors should note that past performance of Strike, including in relation
to the historical trading price of shares, production, reserves and resources, costs and other historical financial information cannot be relied upon as an indicator of (and provide no guidance, assurance or
guarantee as to) future performance, including the future trading price of shares. The historical information included in this presentation is, or is based on, information that has previously been released to
the market.
Investment risk
As noted above, an investment in shares in Strike is subject to investment and other known and unknown risks, some of which are beyond the control of Strike. These risks, together with other general risks
applicable to all investments in listed securities not specifically referred to, may affect the value of shares in Strike in the future. Strike does not guarantee any particular rate of return or the performance of
Strike, nor guarantee the repayment of capital from Strike, or any particular tax treatment. When making any investment decision, investors should make their own enquires and investigations regarding all
information in this presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect future operations of Strike, and the impact that different future outcomes
may have on Strike. Refer to the risk factors set out in Talon Energy Limited’s Scheme Booklet dated 3 November 2023 in relation to the acquisition by Strike Energy (through its wholly owned subsidiary) of
all of the issued shares in Talon Energy by way of scheme of arrangement pursuant to Part 5.1 of the Corporations Act 2001 (Cth) for a summary of certain general, Strike Energy specific and acquisition
specific risk factors that may affect Strike Energy.
2
Highlights for Q2-FY25
South Erregulla
FID
Erregulla Deep
flow testing
85 MW fully integrated peaking
gas power station
Confirmed significant gas discovery
West Erregulla
environmental
approvals received
Contingent discovery
at Walyering East-1
3
Q2-FY25 Financials
Commentary
Average Realised
Gas Price
Total quarterly revenue generation of
~$17.5m
$17.53m (-4%)
$7.34 (+4%)
Realised gas price increased to $7.34/
GJ and condensate prices of ~$122/bbl
Average Realised
Condensate Price
Exploration & App.
Expenditure
Sales revenue
Revenue decrease related to planned
annual shutdown for maintenance
Exploration expenditure related to
Walyering East-1 drilling & ED-1 testing
$122.16 (+1%)
$13.34m (+70%)
Development expenditure related to
South Erregulla procurement &
Walyering 7 drilling
Development
Expenditure
Total Liquidity
$162m committed funding via
Macquarie facility announced1
$11.98m (+155%)
$33.13 (-46%)
Temporary liquidity reduction of $17m
due to transition to new financing facility
1.
Refer to ASX Announcement dated 31 Jan 2025 entitled “Credit approval
for $162 million development facility” for more information.
4
Strategic Review
5
Gas Acceleration Strategy
Operator in all permits,
except L7/EP437
Pre-FID
Online & In-construction
Walyering
West Erregulla & ED
(STX 100%, operator)
(STX 50%, operator)
EP437 L7
25% 25%
Lockyer
N. Erregulla
Waitsia
West Erregulla
EP469
50%
Beharra
87 TJ/d >20 years
South Erregulla
Ocean Hill
85 MW Peaking Power
Highly prospective
(STX 50%)
L25
50%
(STX 50%)
33 TJ/ day capacity
Erregulla Deep
L24
100%
South Erregulla
Arrino– Kadathinni
Complex
(STX 100%)
EP505
100%
(STX 100%)
The Precinct
(STX 100%)
EP506
100%
Woodada
(STX 100%, operator)
(STX 100%, operator)
EP503
100%
EP504
100%
EP495
100%
Ocean Hill
(STX 100%)
Total Discovered Reserves & Resources
Strike Independent Perth Basin 2P Reserves, 2C Resources and Erregulla Deep 2U (PJe)1
139
811
17%
374
EP488
100%
38%
EP447
100%
298
10%
7%
EP489
100%
28%
DBNGP
PGP
Wal East
Walyering
East
(STX 100%)
(STX 100%)
Walyering
L23
100%
(STX 100%)
1. Refer to slide 12 for important information regarding reserve and resource estimations.
2P
2C
West Erregulla
South Erregulla
Walyering
Ocean Hill
2U
Total
Erregulla Deep
Prospective Resource Estimate
Information
&
Cautionary
statement:
The
estimated
quantities of petroleum that may
potentially be recovered by the
application
of
a
future
exploration and development
project(s) relate to undiscovered
accumulations. This estimate is
un-risked,
probabilistically
determined and has a risk of
development.
Further
exploration,
appraisal
and
evaluation
is
required
to
determine the existence of a
significant quantity of potentially
moveable hydrocarbons. Refer
to slide 12 for Reserves and
Resource estimate information.
6
South Erregulla Peaking Gas Power Station
The start of Strike’s energy Precinct
Post FID²
•
•
•
•
•
•
Start-up Oct 26
$250m NPV₈
27% IRR
$137m Capex
~$7m p.a. Opex
~2 PJ pa.
Surveyed 330 KV corridor
Existing 132 KV line
Production
Licence L24
South Erregulla Reserves1
82 PJ 2P plus 2C
85 MW Peaking
Power Plant
>20 years of 2P Gas
Reserves
Forecast Revenue $5055m p.a. over first 5
years2
Network Access
Capacity Credits
Environmental Approval
Production Licence
1.
2.
3.
Transmission Corridor
Why Peaking Power?
Incremental value from the
spark-spread during short
term power prices coinciding
with lower renewable
generation.
Capacity credit mechanism
in force in WA.
Strike’s 3,500ha Precinct
Wind: up to 310 MW at 45% net CF3
CCS: 4.8mt 2C CO2 storage1
Geographical competitive
advantage over traditional
WA domestic gas market
(Carnarvon Basin)
incumbents and other nonintegrated generators.
Existing approvals and
planning work from the
previous South Erregulla
domestic gas project.
Refer to Slide 12 for important information on Reserves and Resources.
Refer to ASX Announcement dated 28 Nov 2024 entitled “South Erregulla Peaking Gas Power Station Final Investment Decision” for assumptions and inputs on which NPV, IRR and revenue projections are based and to Slide 12 for forward 7
looking statement important notices. Both NPV and IRR are pre-tax. Refer to Slide 9 for forecast revenue breakdown.
CF = Capacity factor. Independent analysis completed by WSP post 12 months of LiDAR data collection at the Precinct.
South West Interconnected System (SWIS)
Annual Generation by Fuel Mix
The WA govt. is
aiming to
decarbonise and
diversify the SWIS
via the introduction
of the Capacity
Market to enable
investment into new
gas power gen. &
renewables
Wind
Rooftop Solar
18%
Grid Solar
Landfill Gas
Battery
16%
Broome
Karratha
34%
30%
Gas
Coal
(to be retired
by Oct 2030)
Major Generators
Other
16%
Geraldton
Synergy
NewGen 11%
42% (WA Govt. owned)
~5 GW
SWIS
Kalgoorlie
Perth
Blue Waters
Bunbury
13%
(to be retired by Oct 2030)
Esperance
18%
Alinta
Source: https://aemo.com.au/en/energy-system