Exploration Update
Released
Released
Announcement PDF
7th May 2025
ASX: STX The Company Announcement Officer ASX Ltd via electronic lodgement
Exploration Update
•
Strike has completed mapping and interpretation of the Ocean Hill 3D seismic
survey, resulting in multiple attractive exploration and appraisal well locations.
•
Mapping and interpretation of the Kadathinni 2D seismic indicates significant
potential at both Jurassic and Permian level that warrants further exploration.
Strike Energy Limited (Strike - ASX: STX) is
pleased to provide an exploration update on its
Ocean Hill and Kadathinni prospects within
the Perth Basin.
Strike holds a dominant acreage position in the
Perth Basin, one of Australia’s most attractive
and emerging gas provinces. The region offers
significant exploration upside, supported by
proximity to existing pipeline infrastructure and
a tightening domestic gas market with growing
demand.
Interpretation of recent seismic acquired by
Strike in 2024 has confirmed significant
prospectivity at both the Permian aged
Kadathinni prospect in EP503 and the Jurassic
aged Ocean Hill prospect in EP495, which
supports further exploration and appraisal.
Both permits are 100% Strike owned and
operated exploration acreage.
Kadathinni offers significant potential scale, as
interpreted by Strike, and is strategically
positioned to provide backfill for existing and
future Strike and/or third party owned basin
infrastructure. Ocean Hill’s proximity to a
compressor station on the Dampier to Bunbury
Natural Gas Pipeline and its favourable gas specification provides a clear, low-cost pathway to
market, enhancing its commercial appeal and development potential.
Comments from Executive Director and Acting CEO, Jill Hoffmann:
“The results from our two recent seismic surveys are extremely encouraging, reaffirming the
potential across our 100%-owned and operated exploration acreage in the Perth Basin.
These outcomes highlight both the depth of Strike’s portfolio and the significant growth
potential available to us.
This technical work underscores the exciting prospectivity of the region and aligns with our
strategic focus. It’s a strong endorsement of our team’s capability and the disciplined
approach we’re taking to unlock long-term value.”
strike@strikeenergy.com.au
ABN 59 078 012 745
www.strikeenergy.com.au
1, 40 Kings Park Rd, West Perth WA 6005
Ocean Hill
Ocean Hill is located in EP
495 and is 100% owned and
operated by Strike.
Ocean Hill was discovered in
1991 with the Ocean Hill-1
well, which intersected over
100m of net gas pay within
multiple stacked sandstones.
A production test flowed gas
to surface at uncommercial
rates and the well was
plugged and abandoned. Gas
samples have proven a similar
gas specification to that of
Walyering, which will likely
allow for a low-cost, fast to
market development when
compared
with
Permian
developments that require
significant CO2 processing.
Strike acquired the 256 km2
Ocean Hill 3D seismic survey
in April 2024 with a full PreStack Time Migration (PSTM)
and
Pre-Stack
Depth
Migration (PSDM) seismic
processing
workflow
conducted over 6 months
with data delivered in Q4
2024.
The 3D provided significant improvements to the dataset. Strike has now completed internal
mapping and interpretation, which has resulted in multiple attractive exploration and appraisal
well locations being identified across the Ocean Hill structure.
Overall, the 3D showed significantly fewer large-scale continuous faults and less
compartmentalisation than previously mapped on 2D seismic. Amplitude extractions on the 3D
indicate the presence of stacked channels running north-south. The Ocean Hill-1 discovery well
appears to have been drilled in a sub-optimal location with low amplitudes, which may explain
the outcome.
Based on initial interpretation of the Ocean Hill 3D seismic, Strike interprets there to be potential
for material upside to the current Contingent Resources independently certified by RISC
Advisory Pty. Ltd. (RISC) and reported on 10 October 2022. Strike expects an appraisal program
of 3 wells will be required to test the Ocean Hill structure and prove up the additional interpreted
upside. Strike will look to engage RISC to independently certify a review of the Ocean Hill
Contingent Resources and expect this to occur in line with end of financial year reserves
reporting.
The timing and execution of the appraisal program is being considered as part of the Strategic
Review, with a target of having the Ocean Hill 2 drill ready by as early as Q4 CY25.
Kadathinni
Kadathinni is located in EP 503 and is 100%
owned and operated by Strike.
The Kadathinni 2D seismic survey was
conducted in Q2 CY24 with 27 2D lines
acquired, covering ~484 line kilometers and a
survey area of over 1000 km2.
The survey was shot primarily along roads and
tracks to avoid surface constraints such as
cropping and native vegetation. PSTM
processing was delivered in late Q3 CY24 and
seismic data quality is considered fair with
significant improvements compared to the
legacy 2D seismic. Tie-lines were acquired
into nearby 3D seismic surveys to allow the
data to be tied to existing interpretations.
Strike has identified significant prospectivity
at both Permian level in the Kingia Formation
and at Jurassic level in the Eneabba
Formation. The Eneabba is an emerging play
in the Perth Basin, where shows have been
present at Erregulla-1 and South Erregulla-1,
with minor oil recovered at Erregulla-1. The
phase of hydrocarbons at Kadathinni may be oil or gas. Preliminary internal prospective volumes
for Kadathinni are outlined below with a view to mature the Tathra- 1 exploration well to drill ready
in 2026.
Kadathinni Prospective Resources (100% net to Strike)
Low Estimate
1U
Best Estimate
2U
High Estimate
3U
Gross
Gross
Gross
OGIP (bcf)
118
356
902
Net Sales Gas (PJ)
85
254
646
OGIP (bcf)
25
186
753
Net Sales Gas (PJ)
17
131
539
Total Net Sales Gas (PJ)
102
385
1184
Kingia
Eneabba
Prospective Resource Estimate Information & Cautionary statement: The above estimated quantities of petroleum
that may potentially be recovered by the application of a future exploration and development project(s) relate to
undiscovered accumulations. These estimates are un-risked, probabilistically determined, and have both an
associated risk of discovery (POS of 28% for Kingia, and 23% for Eneabba) and a risk of development (POS 60% for
both prospects). Further exploration, appraisal and evaluation is required via further seismic or drilling to determine
the existence of a significant quantity of potentially moveable hydrocarbons. The timing of this is subject to the
outcomes of Strike’s ongoing strategic review. Volumes are stated in gross with 100% net to Strike. The estimates have
been compiled using Strike’s seismic mapping and reservoir/resource parameters common with the existing
Reserves estimates in the Erregulla region, which includes a BCF to PJ conversion of 1.081 and 5.8% shrinkage. The
Prospective Resource estimates are as at 7th May 2025 and have been estimated in accordance with the definitions
and guidelines of the Petroleum Resources Management System 2018, published by the Society of Petroleum
Engineers (SPE PRMS).
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
0419877137
emma.alexander@strikeenergy.com.au
Important Notices
Forward looking statements
Statements contained in this Interim Financial Report, including but not limited to those regarding the possible or
assumed future costs, projected timeframes, performance, dividends, returns, revenue, exchange rates, potential
growth of Strike, industry growth, commodity or price forecasts, or other projections and any estimated company
earnings are or may be forward looking statements. Forward looking statements can generally be identified by the
use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’, ‘outlook’, ‘schedule’, ‘estimate’, ‘target’, ‘guidance’
‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. Forward looking statements
including all statements in this document regarding the outcomes of preliminary and definitive feasibility studies,
projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied
upon as an indication or guarantee of future performance. These statements relate to future events and expectations
and as such involve known and unknown risks and significant uncertainties, many of which are outside the control of
Strike. Actual results, performance, actions and developments of Strike may differ materially from those expressed
or implied by the forward-looking statements in this Interim Financial Report. Such forward-looking statements
speak only as of the date of this document. Refer to the risk factors set out in Talon Energy Limited’s Scheme Booklet
dated 3 November 2023 in relation to the acquisition by Strike Energy (through its wholly owned subsidiary) of all of
the issued shares in Talon Energy by way of scheme of arrangement pursuant to Part 5.1 of the Corporations Act 2001
(Cth) for a summary of certain general, Strike Energy specific and acquisition specific risk factors that may affect
Strike Energy. There can be no assurance that actual outcomes will not differ materially from these statements.
Investors should consider the forward looking statements contained in this Interim Financial Report in light of those
disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and any of its affiliates
and their directors, officers, employees, agents, associates and advisers disclaim any obligations or undertaking to
release any updates or revisions to the information in this document to reflect any change in expectations or
assumptions; do not make any representation or warranty, express or implied, as to the accuracy, reliability or
completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any
event or results expressed or implied in any forward-looking statement; and disclaim all responsibility and liability for
these forward-looking statements (including, without limitation, liability for negligence). Nothing in this Interim
Financial Report will under any circumstances create an implication that there has been no change in the affairs of
Strike since the date of this document.
Oil and gas resource estimation process
Strike estimates and reports its petroleum resources in accordance with the definitions and guidelines of the
Petroleum Resources Management System 2018, published by the Society of Petroleum Engineers (SPE PRMS).
About Igesi Pty Ltd:
The Prospective Resources estimated in this announcement have been made by Mr. Tony Cortis (M.Sc. Geology) of
Igesi Consulting who has consented to the inclusion in this report of matters based on his information in the form
and context in which they appear. Mr. Cortis has over 36 years of industry experience, 28 years of which were with
Shell International, and is a member of APEGA and the AAPG. He has extensive technical and delivery experience
across numerous conventional clastic and carbonate plays worldwide and has experience across all unconventional
resource play types: tight clastic, shale and coal bed reservoirs.
About Strike:
The estimates in this release that relate to the Igesi Consulting Pty Ltd certified prospective resource estimates is
based on information compiled or reviewed by are based on, and fairly represent, information and supporting
documentation prepared by, or under the supervision of a Qualified Petroleum Reserves and Resources Evaluator
(QPRRE) employed by Strike. The QPRRE is Mr Andrew Farley who holds a B.Sc in Geology, and is a member of the
Society of Petroleum Engineers. Mr Farley is the General Manager – Subsurface and Exploration for the Group and
has worked in the petroleum industry as a practicing geologist for more than 22 years. Mr Farley has consented to the
inclusion in this report of matters based on his information in the form and context in which it appears.
Share your feedback
Discover