Q2-23 Quarterly Report
Walyering gas plant construction June ‘23
Highlights
Gas Acceleration Strategy
•
Strike’s Gas Acceleration Strategy, which involves the timely development of the Walyering,
Ocean Hill and the South and West Erregulla gas fields, has been awarded Lead Agency
Service by the Department of Jobs, Tourism, Science and Innovation of Western Australia.
WA Energy Market
•
•
Spot gas market prices reached $11.13/GJ during the quarter, which is the highest price in
WA since 2012.
Cold weather during the quarter caused Perth’s electricity system to experience an all-time
evening peak demand of 3,652 MW. At times during the quarter, gas fired generation made
up 58% of electricity on the South-West Interconnected System (SWIS).
Walyering
•
•
Construction of the Walyering gas field (L23) and facility are well progressed with
commissioning and production operations expected in Q3/23.
The L23 joint venture signed a condensate processing and offtake agreement with Santos
Limited and trucking agreement with RTA Australia for delivery to the point of sale in Port
Bonython.
South Erregulla
•
•
Strike has prepared the well pads for the South Erregulla appraisal drilling campaign, which
is expected to commence in August.
Pre-FID gas marketing activities have been ongoing with the Company receiving proposals
for firm gas supply at greater than $8/GJ.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 8 7099 7400
E: strike@strikeenergy.com.au
Level 1, 40 Kings Park Road
West Perth WA 6005
•
•
•
•
•
•
Detailed negotiations with a major WA industrial gas user for a 20 TJ/d, 5-year binding gas
supply agreement have commenced.
Strike has contracted globally recognised natural gas solutions business Enerflex to
undertake engineering design and provide a lump sum priced option for procurement and
fabrication of the proposed 40TJ/day SE Phase 1 processing modules.
Strike estimates the fully fabricated, constructed and installed cost of the South Erregulla
Phase 1 Gas Processing facility at $90 million (P50 Class 4 estimate) 1, which excludes the
cost of the export pipeline to the DBNGP.
RISC has independently assessed gross 2C Contingent Storage Resources of 4.8 million
tonnes of CO₂ 2, which would support the sequestration of the annual estimated scope 1
emissions from the staged deployment of up to four processing modules (40 TJ/d each)
for over 25 years.
Strike has prepared the well pads for the South Erregulla appraisal drilling campaign, which
is expected to commence in August.
The recent neighbouring Trigg-1 well drilled by Beach Energy Limited has proven that the
westerly Eneabba fault is sealing, which is a common bounding fault for the South Erregulla
field. This result supports Strike’s modelling and increases its confidence in achieving the
appraisal drilling objective of converting the 2C Contingent Resources to 2P Reserves. 3
West Erregulla & Permian Gas Fairway
•
Based on successful exploration results at the neighbouring North Erregulla Deep-1 (NED1) well, as reported by Mineral Resources in June 2023, Strike has high-graded the
prospectivity of its exciting North Perth Basin Permian exploration portfolio. Based on
Strike’s assessment, the NED-1 results have:
o
o
•
improved confidence in the prospectivity of the Erregulla Deep-1 near field exploration
well in EP469 due to be drilled by the EP469 JV in Q2/24.
confirmed prospectivity of Strike’s 100% held acreage along the Tathra Terrace, which
includes the major Arrino and Kadathinni Leads
Strike as operator has been engaging with the EP469 JV in preparation for the 2-well near
field exploration drilling campaign at West Erregulla, which will include Southwest
Erregulla-1 and Erregulla Deep-1. The work program and budget has been approved and
Strike expects to spud the first well in the campaign in Q2/24.
Exploration
•
•
Strike completed the 128km of 2D seismic over the Eneabba Deep prospect in the 100%
owned and operated EP506 with processed data due in the coming weeks.
Terex has been awarded the upcoming Ocean Hill 3D (EP495, 100% STX) and Kadathinni
2D (in EP503, EP504, EP505, STX 100%) seismic campaigns for acquisition in late CY23.
Corporate
•
•
1
Macquarie Bank Limited exercised 20.7 million options at 34 cents per share.
Strike finished the quarter with a liquidity position of ~$175 million ($128 million of cash and
$47 million of committed, undrawn debt facilities), plus an uncommitted $80 million
contingent debt facility for Strike’s South Erregulla domestic gas development 4.
Cost estimate is an AACEI Class-4 estimate with an aggregate accuracy range of -30%/+50% based on available inputs and to their relative maturity.
2 Refer to important notices at the end of this report for Resource and Reserve information.
3 Refer to important notices at the end of this report for Resource and Reserve information. Conversion of Resources to Reserves is subject to appraisal
drilling results. Neither the conversion nor the rate of conversion is guaranteed.
4 Uncommitted facility remains subject to lender credit approval.
2
Domestic Gas Business
WA Energy Market & Gas Acceleration Strategy
WA gas market conditions continued to tighten
during the quarter as demand rose against the
backdrop of reduced reliability of supply. The WA
spot market price, which reached a maximum of
$11.13/GJ during the quarter (the highest price
observed in WA since 2012), reflects the
uncertainty in both current and future supply
sources.
These market conditions have caused the WA
Government’s Economics and Industry Standing
Committee to launch its own Inquiry into the WA
Domestic Gas Policy. The Standing Committee
said “The committee will hear evidence about
how well the policy’s existing mechanisms
ensure the timely delivery of gas into the
domestic market and the transparency of both supply and prices of gas. It will also consider the
state government’s role in ensuring that WA has adequate domestic gas supplies into the future.”
Strike is preparing a submission in response to the inquiry given the recognition by AEMO, Rystad
Energy and Woodmac that the Perth Basin (where Strike has a dominant position) is likely to be the
source of most future supplies into the WA market.
Strike’s analysis shows WA is experiencing price increases as a result of a decrease in supply
against a rising demand. Strike believes the WA Government should, therefore, be looking at what
levers are available to increase the investment in new supply rather than trying to control price via
other policy mechanisms where recent Federal Government pricing caps and interventions in the
East Coast have appeared counterproductive.
During
the
quarter,
the
Australian Federal Department
of Industry Science and
Resources
released
their
‘Critical Minerals Strategy,
2023-2030’ to drive additional
investment in battery minerals
and rare earths. Of note is the
drive
towards
increasing
Australian processing capacity
and high grading of critical
mineral ores before export
from
Australia.
This
Government led initiative (in
partnership
with
allied
countries) is seeing a rise in
investment in new gas consuming infrastructure such as lithium hydroxide, rare earth and nickel
refining, magnetite mining and aluminium production. Just this quarter Albemarle sanctioned two
additional processing trains of lithium hydroxide capacity, which, based on Strike’s analysis, will
increase daily gas consumption in WA by 16 TJ/d.
Cooler weather throughout the quarter drove a surge in electricity consumption on the SWIS, where
all-time demand records were set. With the reduced reliability of WA’s aging coal fleet (and mines)
3
gas consumption rallied to fill the
void, which was exacerbated by very
low solar and wind generation.
Regularly over 50% of WA’s
electricity was being fuelled via gas,
which reached peaks of almost 60%
at certain times. The period also saw
diesel fired generation turned on
throughout areas of the State as gas
availability
peaked.
With
the
permanent retirements of the coal
fired generation planned in 2024,
2027 and 2029, new gas fired
generation and, more importantly,
gas supply will need to be
sanctioned as soon as possible in
order to avoid near term demand
management across WA’s industrial
and mining sectors during periods of
weather induced electricity demand
surging.
During the quarter, and in line with
the rising concern over future
domestic gas supplies and the rising
price environment in Western
Australia, Strike approached the
Department of Jobs, Tourism,
Science and Innovation to seek the
support of the Lead Agency Service
for Strike’s Gas Acceleration
Strategy. Strike’s Gas Acceleration
Strategy will look to exploit Strike’s
existing 371 PJ of net 2P Reserves
proven across the Greater Erregulla
and Walyering fields, convert Strike’s
existing 610 PJe of net 2C Contingent
Resources to Reserves and test 275
PJe of new net 2U Prospective Resources (refer to note to map above for Prospective Resource
Cautionary Statement) to delineate further gas resource upside. 5
This support was subsequently awarded. Under the Lead Agency framework, the Department of
Jobs, Tourism, Science and Innovation will provide Strike’s gas projects with case management for
government interfaces, and the coordination of approvals across a range of Government
departments. This will assist Strike in navigating the approvals processes and ensuring efficient
communication between Government agencies. Ultimately, this support will assist Strike to
accelerate the delivery of these four critical domestic gas projects into the WA market.
Walyering (L23, STX 55%)
•
5
During the quarter Strike commenced construction of the 33 TJ/d and 250 bbl/d production
facility at the Walyering gas field in Production Licence L23 where Strike is the operator and
owner of a 55% equity interest.
Refer important notices at the end of this report for information on reserves and resources.
4
•
•
Construction of the production facility is well progressed with commissioning and
production operations expected in Q3/23, noting that the late delivery of key materials has
delayed mechanical completion beyond the original schedule of Q2/23.
The EP447/L23 JV executed a condensate processing services agreement and liquids
aggregation agreement with Santos Limited for the processing and sale of condensate
produced from the Walyering gas field with delivery to Port Bonython.
Walyering Gas/Condensate Reserves & Resources (PJe, 55% net to Strike) 6
1P
2P
3P
1C
2C
3C
Reserves
19
32
48
-
-
-
Contingent Resources
-
-
-
11
19
30
South Erregulla (EP503: STX 100%)
•
•
6
Strike has concluded its pre-FID South Erregulla gas marketing process and
commenced detailed negotiations with a major WA industrial gas user for a 20 TJ/d, 5year binding gas supply agreement.
Phase 1 & 2 development includes:
Refer Important Notices at the end of this report for information relating to Reserves and Resource.
5
o Strike has contracted globally recognised natural gas solutions business Enerflex to
conduct engineering and provide a lump sum priced option for procurement and
fabrication of the SE Phase 1 (40TJ/day) processing modules.
o Enerflex estimates that the modules could be fabricated and ready for shipment to
Strike between 44 and 48 weeks of the orders being placed, facilitating Strike’s onstream target date in late 2024.
o Strike estimates the fully fabricated, constructed and installed cost of the South
Erregulla Phase 1 Gas Processing facility at $90 million (P50 Class 4 estimate) 7
which excludes the cost of the export pipeline to the DBNGP.
•
o Phase 2 will involve the expansion of the development to > 80TJ/day with additional
pre-fabricated modules upon conversion of 2C Contingent Resources to Reserves
following successful appraisal.
Phase 3 preparatory activities:
o RISC has independently assessed gross 2C Contingent Storage Resources of 4.8
million tonnes of CO₂ 8, which would support the sequestration of the annual
estimated scope 1 emissions from the staged deployment of up to four processing
modules (40 TJ/d each) for over 25 years.
o Strike with Hybrid Systems Australia has deployed its LiDAR wind data gathering
system to assess the generation capacity and support future renewable energy
infrastructure deployments at the Precinct.
Precinct with SE plant, pipeline and well locations
Visualisation of modular gas plant at South
Erregulla with associated solar array
South Erregulla Gas Reserves & Resources (PJ, 100% net to Strike) 9
1P
2P
3P
1C
2C
3C
Reserves
58
128
209
-
-
-
Contingent Resources
-
-
-
157
271
438
Gross South Erregulla Contingent Storage Resources 10
CO₂ Storage Resources
(million tonnes, gross to Strike 100%)
1C
2C
3C
2.20
4.80
9.20
7 Cost estimate is an AACEI Class-4 estimate with an aggregate accuracy range of -30%/+50% based on available inputs and to their relative maturity.
8 Refer to important notices at the end of this report for Resource and Reserve information.
9 Refer footnote 8.
10 Refer footnote 8.
6
•
Neighbouring Trigg-1 well result, 13.5 km south of South Erregulla (SE), confirmed the
Eneabba fault is sealing. This result has substantially reduced the risk of Strike’s
upcoming South Erregulla appraisal campaign, which is estimated to commence in
Q3/23.
Above: cross section from Beharra Springs Deep in the West to the Tathra Terrace in the East,
demonstrating the up-dip nature of the SE 2&3 appraisal wells and the location of the Eneabba
Fault on the Western side of the field that was tested and proven as an effective seal by Trigg-1.
West Erregulla (EP469: STX 50% and operator)
•
During the quarter the EP469 JV adopted the work program and budgets that will support
the upcoming two well near field exploration campaign where permitting and preparation is
ongoing.
West Erregulla Gas Reserves & Resources (PJ, 50% net to Strike) 11
1P
2P
3P
1C
2C
3C
Net Reserves
162
211
251
-
-
-
Net Contingent Resources
-
-
-
9
15
21
•
Erregulla Deep-1 will likely be the first well in the drilling campaign. The successful result at
North Erregulla Deep-1 from Mineral Resources supports an improvement in Kingia
reservoir quality and thickness in a South Easterly trend, which increases the prospectivity
of the Erregulla Deep structure.
West Erregulla Prospective Resources (PJ, 50% net to Strike) 12
1U
2U
3U
Southwest Erregulla
99
136
177
Erregulla Deep
105
139
178
Total
203
275
354
Prospective Resource Estimate Information & Cautionary statement: The above estimated quantities of petroleum that
may potentially be recovered by the application of a future exploration and development project(s) relate to
undiscovered accumulations. These estimates are un-risked, probabilistically determined, and have both an associated
risk of discovery (POS 42% for Erregulla Deep and 54% for Southwest Erregulla) and a risk of development. Further
exploration, appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons. Volumes are stated in gross and net to Strike (50% equity share).
Seismic Campaigns
11
Refer to important notices at the end of this report for Resource and Reserve information.
12
Refer footnote 11.
7
•
•
•
Eneabba Deep 128km 2D seismic in EP506
(STX 100%) was completed without incident
on schedule and budget with first seismic
data expected in the coming weeks.
Eneabba Deep 2D seismic acquisition
Kadathinni 484km 2D seismic campaign (in
EP503, EP504, EP505, STX 100%) has been
awarded to Terrex Seismic and, subject to
approvals, will be acquired this summer.
Ocean Hill 240km² 3D seismic campaign (in
EP495, STX 100%) has also been awarded to
Terrex Seismic and, subject to approvals, will
also be acquired this summer. The campaign
will help delineate a drilling location to support appraisal with Ocean Hill-2 designed to
convert the existing 306 PJe of independently certified 2C Contingent Resources to 2P
Reserves. 13
Mid-West Geothermal Power Project
•
Due to the overlapping tenure of Strike’s Geothermal Permit Application with other
petroleum and minerals permits, minimal activities occurred during the quarter; however,
the Department of Mines, Industry, Regulation & Safety released a draft guide on managing
subsisting petroleum and geothermal titles.
Corporate
•
•
•
•
•
During
the
quarter
Strike’s
expenditure focused on construction
activities at the Walyering gas field,
engineering for the Phase 1 South
Erregulla gas development, seismic
acquisition and long lead item / well
pad preparation for the upcoming 6well drilling campaign.
During
the
reporting
period
Macquarie Bank Limited exercised
20.7 million options at 34 cents per
share.
Strike finished the quarter with
Laying of Walyering-6 flowline
liquidity of ~$175 million, which
included $128 million in cash on hand, and $47 million in undrawn debt facilities, plus the
$80 million uncommitted contingent debt facility for the South Erregulla domestic gas
development (which remains subject to credit approval).
During the quarter Strike surrendered Cooper Basin permit PEL95, with PEL94 to follow in
the coming quarter.
As outlined in the attached Appendix 5B (section 6.1), $206,000 in payments were made
to related parties for director fees.
13
Refer to important notices at the end of this report for Resource and Reserve information. Conversion of Resources to Reserves is subject to appraisal
drilling results. Neither the conversion nor the rate of conversion is guaranteed.
8
Petroleum Tenements Held at the End of the Quarter
Permit
Basin
Play
Operator (parent)
STX Interest
Gross Area
(acres)
STX Net Area (acres)
EP469 (West Erregulla)
Perth Basin
Permian Gas
Strike
50%
55,500
27,750
EP503 (South Erregulla)
Perth Basin
Permian Gas
Strike
100%
138,626
138,626
EP504
Perth Basin
Permian Gas
Strike
100%
92,170
92,170
EP505
Perth Basin
Permian Gas
Strike
100%
18,533
18,533
EP506
Perth Basin
Permian Gas
Strike
100%
37,066
37,066
EP447 (Walyering)
Perth Basin
Jurassic Wet Gas
Strike
55%
274,287
150,857
EP488
Perth Basin
Jurassic Wet Gas
Strike
100%
73,390
73,390
EP489
Perth Basin
Jurassic Wet Gas
Strike
100%
36,572
36,572
EP495
Perth Basin
Jurassic Wet Gas
Strike
100%
73,637
73,637
PEL 94
Cooper Basin
Deep Coal
Beach
35%
222,963
78,037
PEL 96
Cooper Basin
Deep Coal
Strike
67%
668,098
444,953
PELA640
Cooper Basin
Deep Coal
Strike
100%
821,056
821,056
PEL 515
Cooper Basin
Western Flank
Strike
100%
750,483
750,483
PPL210 (Aldinga)
Cooper Basin
Shallow Oil
Beach
50%
988
494
*Permits that are shaded are in the process of being
handed back to the South Australian regulator. Cooper
Basin permit PEL95 was surrendered during the
quarter.
This announcement is authorised for release by the
Managing Director and Chief Executive Officer in
accordance with the Company’s Continuous Disclosure
Policy.
Important Notices
Information regarding Reserve, Resource & Storage Estimates
Unless otherwise stated, references in this report to:
•
the West Erregulla reserve and resource estimate is set out in the ASX announcement dated 27th
July 2022 entitled "West Erregulla Reserves Upgraded by 41%" and in ASX announcement dated
16 December 2022 entitled "Strike to test Southwest Erregulla and Erregulla Deep Prospective
Resource". Strike’s interest is 50%;
•
the South Erregulla reserve and resource estimate is set out in the ASX announcement dated 18
October 2022 entitled “Independent Certification of South Erregulla Wagina Gas Discovery”.
Strike Energy interest is 100%;
•
the Walyering reserve and resource estimate is set out in ASX announcement dated 21 July 2022
entitled "Independent Certification of Walyering Reserves". Strike 's equity interest is 55%;
•
the Oceanhill 2C Contingent Resource is set out in ASX announcement dated 10 October 2022
entitled "Independent Certification of Ocean Hill Gas Resource". Strike’s equity interest is 100%;
•
the Mid-West Geothermal Project inferred resource is set out in ASX announcement dated 5th
May 2022 entitled "Mid West Geothermal Power Project Inferred Resource Statement"; and
•
the South Erregulla Contingent Storage Resource Estimate is set out in ASX announcement
dated 15th June 2023 entitled “South Erregulla Update’.
9
The above announcements are available to view on Strike Energy's website at www.strikeenergy.com.au.
Strike confirms it is not aware of any new information or data that materially affects the information included
in the referenced announcements and that all the material assumptions and technical parameters
underpinning the estimates in those announcements continue to apply.
Future Statements
Statements contained in this announcement, including but not limited to those regarding the possible or
assumed future costs, projected timeframes, performance, dividends, returns, revenue, exchange rates,
potential growth of Strike, industry growth, commodity or price forecasts, or other projections and any
estimated company earnings are or may be forward looking statements. Forward looking statements can
generally be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘budget’, ‘outlook’,
‘schedule’, ‘estimate’, ‘target’, ‘guidance’ ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or
similar expressions. Forward looking statements including all statements in this document regarding the
outcomes of preliminary and definitive feasibility studies, projections, guidance on future earnings and
estimates are provided as a general guide only and should not be relied upon as an indication or guarantee
of future performance. These statements relate to future events and expectations and as such involve known
and unknown risks and significant uncertainties, many of which are outside the control of Strike. Actual
results, performance, actions and developments of Strike may differ materially from those expressed or
implied by the forward-looking statements in this announcement. Such forward-looking statements speak
only as of the date of this announcement. There can be no assurance that actual outcomes will not differ
materially from these statements. A number of important factors could cause actual results or performance
to differ materially from the forward looking statements, including the risk factors set out in Strike West Pty
Ltd’s (wholly owned subsidiary of Strike) bidder’s statement dated 23 December 2022 in relation to its offmarket takeover offer to acquire all of the shares in Warrego Energy Limited that Strike does not already own.
Investors should consider the forward looking statements contained in this announcement in light of those
disclosures. To the maximum extent permitted by law (including the ASX Listing Rules), Strike and its
affiliates and its directors, officers, employees, agents, associates and advisers disclaim any obligations or
undertaking to release any updates or revisions to the information in this announcement to reflect any
change in expectations or assumptions; do not make any representation or warranty, express or implied, as
to the accuracy, reliability or completeness of the information in this announcement, or likelihood of
fulfilment of any forward looking statement or any event or results expressed or implied in any forwardlooking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence). Nothing in this announcement will under any
circumstances create an implication that there has been no change in the affairs of Strike since the date of
this announcement.
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
Strike Energy Limited
emma.alexander@strikeenergy.com.au
Media Contacts
Paul Ryan
Citadel-MAGNUS
0409 296 511
pryan@citadelmagnus.com
10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
STRIKE ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
59 078 012 745
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
235
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(843)
(4,280)
(1,722)
(7,325)
-
-
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
419
441
1.5
Interest and other costs of finance paid
(153)
(2,706)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (cost recoveries from JVs)
770
2,819
1.9
Net cash from / (used in) operating
activities
(1,529)
(10,816)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(404)
(15,190)
(10,110)
(36,289)
-
-
(8,889)
(17,307)
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
oil & gas assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
135,735
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide detail if material)
(93)
1,010
2.6
Net cash from / (used in) investing
activities
(19,496)
67,959
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
30,000
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
7,038
19,214
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(1,200)
3.5
Proceeds from borrowings
-
11,550
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
(1,176)
(1,944)
3.8
Dividends paid
-
-
3.9
Other (security deposit)
-
(641)
3.10
Net cash from / (used in) financing
activities
5,862
56,979
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
143,096
13,905
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,529)
(10,816)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(19,496)
67,959
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
5,862
56,979
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
(56)
(150)
127,877
127,877
Current quarter
$A’000
Previous quarter
$A’000
21,307
20,563
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (share of JV bank accounts and bank
deposits)
106,570
122,533
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
127,877
143,096
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
206
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
73,000
26,250
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
73,000
26,250
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
46,750
Macquarie Bank Limited – Secured Facility – Tranche A ($13 million), B ($10 million), C
($10 million), D ($40 million)
Interest rate – 6% + bank bill swap rate (A, B &C) and 9% + bank bill swap rate (D)
Maturity Date – 30 June 2025 (Tranches A, B & C) and 31 December 2024 (Tranche D)
As per ASX announcement on 19 December 2023 "$153 million Domestic Gas Financing
Package", Macquarie Bank Limited agreed to refinancing of Facilities A, B and C, additional
committed faci
Share your feedback
Discover