Booth-1 result
Released
Released
Announcement PDF
7th August 2024
ASX: STX The Company Announcement Officer ASX Ltd via electronic lodgement
Booth-1 Result
•
Booth-1 exploration well reaches Total Depth with no moveable hydrocarbons
discovered.
Strike Energy Limited (Strike - ASX: STX) provides an update on the drilling of Booth-1 in L7 in
the north Perth Basin. The L7 operator, Triangle Energy Global Ltd. (Triangle - ASX: TEG), has
informed Strike that Booth-1 has reached Total Depth (TD) just before 9:00am on 7 August
2024, with no moveable hydrocarbons discovered in any of the reservoir targets.
The Booth-1 well was drilled ahead of schedule and within budget and will be plugged and
abandoned over the coming days.
About the Booth-1 Exploration Campaign
The Booth-1 well was targeting gas in the Kingia-High Cliff reservoirs, with potential for oil or gas
in the overlying sandstones within the Dongara and Cattamarra formations, with a TD of 2,812 m
measured depth (md).
The Booth-1 well, drilled in the L7 permit in the North Perth Basin, has surface location and
elevation details as follows:
Location Lat / Long:
S 29° 7' 56.63459", E 115° 9' 7.67690"
Location Grid N/E:
N 6775934.040 m, E 320231.150 m
TVD Reference Elevation:
228.910 m above MSL
Seabed / Ground Elevation:
220.180 m above MSL
The L7 joint venture is comprised of:
• Triangle Energy: 50% & Operator
• Strike Energy: 25%
• Echelon Resources: 25%
This announcement is authorised for release by the Managing Director and Chief Executive
Officer in accordance with the Company’s Continuous Disclosure Policy.
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
Strike Energy Limited
+61 419 877 137
emma.alexander@strikeenergy.com.au
strike@strikeenergy.com.au
ABN 59 078 012 745
Media Contacts
Paul Ryan
Senior Director
Sodali & Co.
+61 409 296 511
paul.ryan@sodali.com
www.strikeenergy.com.au
1, 40 Kings Park Rd, West Perth WA 6005
Share your feedback
Discover