Successful Appraisal of South Erregulla
Released
Released
Announcement PDF
5th October 2023
ASX: STX The Company Announcement Officer ASX Ltd via electronic lodgement
Successful Appraisal of
South Erregulla
•
Successful appraisal at SE2 extends the South Erregulla gas field to the South and
West. Logging and petrophysical analysis across the primary reservoir indicates:
o Conventional net gas pay of 16 metres.
o Porosities up to 18%.
o Reservoir pressures of approximately ~6,730 psia.
•
Successful appraisal of the SE CO₂ storage Jurassic Sandstone with 76m of
potential storage reservoir at a maximum of 24% porosity and an average of 18%.
Strike Energy Limited (Strike - ASX: STX) is pleased to provide an update on the appraisal results
from the SE2 well at the Company’s 100% owned South Erregulla gas field which sits within
Production License L24.
The SE2 well encountered the Kingia Sandstone at 4,843m measured depth (MD) where a gross
interval of 45m was observed. Mud logs, logging while drilling and wireline logging tools were used
to evaluate the Kingia Sandstone with cuttings and pressures having been collected.
The Kingia is made up of three sections of reservoir totalling 16m of net pay with an average porosity
of 11% and porosities up to 18%. Evaluation of the Kingia has used cutoffs consistent with Strike’s
other successful Kingia wells across the Erregulla region in the North Perth Basin. Pressure and
mobility data were collected, where reservoir pressures measured approximately 6,730psia.
Strike will now run and set the 7” liner before cementing it in place, install the 5-1/2” tubing string
along with the well head and christmas tree, before moving the rig to drill South Erregulla-3 (SE3).
The SE2 well confirms the presence of gas filled reservoir in the Kingia on the southwestern flank
of the field. This data, along with the future SE3 results, will form the basis for an independent review
and potential conversion of Contingent Resources in L24 to Reserves.
Carbon Capture and Storage
Strike conducted wireline logging over the Jurassic Sandstone to appraise the potential CO2 storage
capacity originally identified at SE1. The Jurassic Sandstone unit intersected at SE2 was observed
to be high quality with 76m of net reservoir, with an average porosity of 18% and a maximum porosity
of 24%. This supports the continuity of the potential storage reservoir to the southwest of SE1.
This announcement is authorised for release by the Managing Director and Chief Executive Officer
in accordance with the Company’s Continuous Disclosure Policy.
Company Contact
Emma Alexander
Investor Relations & Corporate Manager
Strike Energy Limited
emma.alexander@strikeenergy.com.au
strike@strikeenergy.com.au
ABN 59 078 012 745
Media Contacts
Paul Ryan
Citadel-MAGNUS
0409 296 511
pryan@citadelmagnus.com
www.strikeenergy.com.au
1, 40 Kings Park Rd, West Perth WA 6005
Share your feedback
Discover