Southern Cooper Basin Contingent Resource
Released
Released
Announcement PDF
ASX Announcement
27 April 2015
The Company Announcement Officer ASX Ltd
via electronic lodgement
SOUTHERN COOPER BASIN GAS PROJECT
INDEPENDENT CONTINGENT RESOURCE CERTIFICATION
•
Multi-Tcf Southern Cooper Basin Gas Project accelerates towards commercialisation
•
First contingent gas resource (gross 1C = 105 Bcf, 2C = 155 Bcf, 3C = 225 Bcf)
independently certified and pathway to reserve certification now established
•
Low cost resource underpinned by existing gas sales agreements
Strike Energy Limited (ASX:STX) (“Strike”) is pleased to announce that leading international petroleum
industry consulting firm DeGolyer and MacNaughton has independently certified contingent gas
resources at the Southern Cooper Basin Gas Project in PEL 96 (Strike 66.7% and Operator, Energy
World Corporation (ASX:EWC) 33.3%).
Map 1 - Southern Cooper Basin Gas Project
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
CONTINGENT RESOURCE ESTIMATE
DeGolyer and MacNaughton was engaged by Strike to undertake an Independent Review of the gas
resource in PEL 96 based on the data and information acquired to date by Strike from the drilling and
flow testing programs carried out at the Le Chiffre 1 and Klebb 1, Klebb 2 and Klebb 3 wells.
DeGolyer and MacNaughton has estimated a contingent gas resource for the initial zones that have
been flow tested within the Le Chiffre 1 and Klebb 1 wells. As these zones only represent a portion
of the net coal encountered at these locations, successful flow testing of additional zones will enable
an increased contingent resource to be booked.
The table below, Map 2 and Fig 1 summarise the Contingent Resource Estimates.
Contingent Gas Resource Estimates – PEL 961
as of 31 March 2015
Well
1C2
(Bcf)
2C2
(Bcf)
3C2
(Bcf)
Productive area (acres)
2,171
2,938
3,931
Le Chiffre 1 – Patchawarra Vu Upper and Vu Lower
zones
62.9
93.2
132.4
Klebb 1 – Patchawarra Vu Upper zone
42.1
62.2
93.3
Total Gross Contingent Resource
105.0
155.4
225.7
Total Net Contingent Resource3
70.0
103.6
150.5
1
Contingent Resource Estimates have been prepared in accordance with the Petroleum Resources Management System
“PRMS”. Contingent Resource Estimates are those quantities of gas (produced gas less carbon dioxide and fuel gas) that
are recoverable from known accumulations but which are not yet considered commercially recoverable.
2
1C, 2C and 3C estimates in this table are P90, P50 and P10 respectively for each well and have been summed
arithmetically.
3
Net to Strike’s 66.7% interest in PEL 96.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
Map 2 - PEL 96 Phase One Area 45,500 acres
Fig 1 - Contingent Resource Zones
The Contingent Resource was estimated using probabilistic methods with reservoir data acquired
from all four of the Le Chiffre and Klebb wells being incorporated in the original gas in place (OGIP)
calculations and recovery factors derived from numerical simulation then being applied. The resulting
volumes were then adjusted for non-hydrocarbon fractions and an allowance for fuel gas.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
For the contingent resources to be classified as reserves, establishment of sustained commercial gas
flow rates from the Patchawarra Vu coals will be required to better define gas and water production
rates and volumes, the drainage pattern and well spacing. Additional drilling will also be required to
confirm the reservoir quality and gas content of the coals outside the existing contingent resource
areas in order to grow and upgrade the resource to reserves.
Importantly, the project already satisfies a range of other typical contingencies including low well
costs, gas sales agreements, proximity to pipeline infrastructure and market pricing.
DeGolyer and MacNaughton has estimated a threshold economic field size (TEFS) of 150 Bcf of sales
gas (gross) which is the minimum amount of gas required to be recovered to underpin a commercial
development. The TEFS estimate was based on actual cost data and indicates that the existing 2C sales
gas volume of 155 Bcf will be sufficient to underpin a project development.
IMPLICATIONS
This Independent Review of the Southern Cooper Basin Gas Project has a number of important
implications:
•
The review confirms Strike’s assessment of the results of the drilling and flow testing work
undertaken to date in particular the existence of high gas saturation and gas content and the
productive potential of the coals.
•
Only the initial zones which have been flow tested to date have been assigned contingent
resource estimates. These coal zones represent around 30% of the net coal observed in the
Le Chiffre 1 and Klebb 1 wells. Successful flow testing of additional zones in the wells will
allow additional contingent resources to be booked at these locations.
•
Strike has increased the Phase 1 area to 45,500 acres based on revised mapping of the coals
following recalibration of seismic data to drill results. Given that the contingent resource
estimates have been assigned to an aggregate of around 6,000 acres in the Le Chiffre 1 and
Klebb 1 areas, there is considerable scope to increase the size of the contingent resource with
planned infill drilling.
•
Successful results from Strike’s forward plan, including achievement of sustained commercial
gas flow rates at the wells will allow contingent resources to be converted to reserves. There
are only limited contingencies required to be addressed before reserves can be assessed in
PEL 96.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
FULLY FUNDED FORWARD PROGRAM
The next phases of the PEL 96 appraisal program are designed specifically to convert contingent
resources to reserves and increase the project’s resource base by:
1. Achieving commercial gas flow rates by upgrading the Klebb pilot wells through fracture
stimulation of the Klebb 2 and 3 wells and installation of new pumps. This will be followed by
drilling and flow testing of offset wells at the Le Chiffre location designed to confirm the
commercial production potential of a demonstration project in the pre-development phase.
2. Drilling additional infill wells to confirm the reservoir qualities and gas contents of the coals
outside of the existing contingent resource areas to add contingent resources and reserves.
Fig 2 - PEL 96 Appraisal Program
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
Orica Share Option Agreement
The announcement of the results of this Independent Review entitle Orica to exercise its Option (as
approved by Shareholders at a General Meeting of the Company on 28 May 2014) to subscribe for
new shares in the Company for a payment of $2.5million. The number of new shares to be issued by
the Company is to be no more 20,833,333 shares and will be determined with reference to a price
that is the higher of a 10% discount to the 10 day VWAP prior to the exercise date or 12 cents per
share. If Orica does not exercise this Option within 30 days, the Option will lapse.
Gas Sales Agreements
The positive outcome of the Independent Review triggers the mechanism for the final tranche of
Orora’s gas prepayment under their 45PJ Gas Sales Agreement and marks the commencement of a 30
day period for Orica to elect to make the first gas prepayment under their 250PJ Gas Sales Agreement.
MANAGING DIRECTORS COMMENT
“Strike is delighted that leading international petroleum industry consulting firm DeGolyer and
MacNaughton has confirmed that the results of our first appraisal wells in PEL 96 have defined a
significant contingent gas resource. This achievement represents an important milestone for the
project and defines a clear pathway towards building a substantial reserve base.
The review confirms that the project is already very close to being economic and our testing program
over coming months specifically targets the final results required to prove commerciality and achieve
reserve certification.
The Southern Cooper Basin Gas Project is one of the few projects actively moving forward with the
potential to supply substantial quantities of competitively priced gas to Eastern Australian gas
markets.”
Yours faithfully
DAVID WRENCH
Managing Director
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
ASX Announcement
27 April 2015
Competent Persons Statement
The information in this release that relates to the PEL 96 contingent resources estimate has been taken from independent
reports prepared by DeGolyer and MacNaughton, a leading independent international petroleum industry consultancy firm,
and has been reviewed by Mr Chris Thompson (Chief Operating Officer of the Company). All other reported resource and or
reserves information in this presentation is based on, and fairly represents, information prepared by, or under the
supervision of Mr Thompson.
Mr Thompson holds a Graduate Diploma in Reservoir Evaluation and Management and Bachelor of Science Degree in
Geology. He is a member of the Society of Petroleum Engineers and has worked in the petroleum industry as a practicing
reservoir engineer for over 20 years. Mr Thompson is a qualified petroleum reserves and resources evaluator within the
meaning of the ASX Listing Rules and consents to the inclusion in this release of the resource and or reserves information in
the form and context in which that information is presented.
About DeGolyer and MacNaughton
The information contained in this release pertaining to the PEL 96 contingent resources estimate is based on, and fairly
represents, information prepared under the supervision of Mr Paul Szatkowski, Senior Vice President of DeGolyer and
MacNaughton. Mr Szatkowski holds a Bachelor of Science degree in Petroleum Engineering from Texas A&M, has in excess
of 40 years of relevant experience in the estimation of reserves and contingent resources, and is a member of the
International Society of Petroleum Engineers and the American Association of Petroleum Geologists. Mr Szatkowski is a
qualified petroleum reserves and resources evaluator within the meaning of the ASX Listing Rules and consents to the
inclusion in this release of the contingent resource estimate related information in the form and context in which that
information is presented.
Strike Energy Limited ABN 59 078 012 745
www.strikeenergy.com.au
P: +61 2 9397 1420
E: strike@strikeenergy.com.au
120B Underwood Street, Paddington NSW 2021
Share your feedback
Discover