June 2015 - Quarterly Report and Appendix 5B
Released
Released
Announcement PDF
STRIKE ENERGY LIMITED
QUARTERLY REPORT
For the period ending 30 June 2015
Strike Energy Limited - Quarterly Report: September 2014
June Quarter Performance Summary
Key Achievements
Australia
Increasing gas flows measured at the Klebb 1 and Le Chiffre 1 wells
Establishment of gas flows from the Klebb 3 well
Southern Cooper
Basin Gas Project
Sustained reservoir pressure reductions at Klebb and Le Chiffre locations confirmed
Initial contingent resource estimate independently certified by leading international petroleum consultants
DeGolyer and MacNaughton (as announced on 27 April 2015)
Klebb 2 and 3 frac program commenced and successfully completed post quarter end with encouraging
initial flows
Cash of $11.7 million on hand at the end of the quarter – fully funded to meet current forward program
Strong
Funding Position
Prepayment funding received during the quarter under the terms of the respective gas off take agreements with
Orica and Orora
FY15 ATO R&D rebate estimated to be in excess of $8.2 million
Continued strong interest in additional gas offtake
USA
Operations
Strike Energy Limited - Quarterly Report: June 2015
US asset portfolio net operating cash flow positive
No further US investment planned
1
Managing Director’s Comments
I am pleased to report on another active quarter for Strike.
We continued to achieve increased gas flows at the Le Chiffre and Klebb wells and,
towards the end of the quarter, commenced work on the upgrade of the three
Klebb wells ahead of the Phase 3 testing program. In addition, during the quarter
DeGoyler and MacNaughton certified 1C, 2C and 3C Contingent Resource estimates
around the Le Chiffre and Klebb locations with gas sales prepayments also being
received from Orica and Orora.
The results of the flow testing program to date have been extremely encouraging,
with early sustained gas flows confirming high gas saturations. Further, reservoir
pressure data confirms that sustained reservoir pressure reductions have been
achieved at both the Le Chiffre and Klebb locations. A direct relationship between
reservoir pressure reduction and increasing gas flow exists and therefore the
objective of the next phase of flow testing is to accelerate reservoir pressure
reduction focused at the Klebb location to demonstrate the commercial flow
potential of the formation.
By the end of the quarter, Klebb 2 had been fracture stimulated and was awaiting
recompletion with the workover at Klebb 3 underway. The necessary site preparation
works have been undertaken for the installation of a beam-pump at Klebb 1, which
is expected to be commissioned by the end of July 2015. The improved productivity
of the stimulated Klebb 2 and Klebb 3 wells, in combination with a revised well
completion and pump for Klebb 1, is designed to shorten the period required to
satisfy the resource contingency of sustained commercial gas flows. Le Chiffre 1 was
shut in for pressure build up measurement.
Strike Energy Limited - Quarterly Report: June 2015
During the quarter, the Company was pleased to announce the results of the
independent review of the Phase 1 testing program by DeGolyer and MacNaughton
who certified 1C, 2C and 3C Contingent Resources with limited contingencies
remaining to be satisfied for these resources to be reclassified as reserves.
Orica and Orora made prepayments under their respective Gas Sales Agreements
– to date the Company has received a total of $17 million in funding from our gas
offtakers.
Planning and conceptual design work has advanced for a demonstration gas
processing facility that will be designed to produce sales gas. The deployment of a
modular, demonstration processing and compression facility will provide invaluable
information to support the development of a commercial scale project within PEL
96 that will deliver gas through existing pipeline networks into the innovative offtake
agreements already in place with Orica, Orora and Brickworks.
At quarter end, the Company reported cash on hand of $11.7 million and is currently
estimating a rebate for eligible Research & Development (R&D) expenditure incurred
during the 2015 financial year of in excess of $8.2 million which in part will be used
to repay the Macquarie facility. As a result, the Company is well funded to complete
its planned activities.
We are right on track to achieve our near term objective of commercial gas flows.
Below: Klebb 3 frac operations
2
Southern Cooper Basin Gas Project: Strike’s Strategic Objectives
Strategic objectives
Timing
Supply targets
2020/21
Production
FID
Cost competitive third
party gas supply for
LNG exporters
Development
~5 Tcf over 20 years
Equivalent to gas supply
for one LNG train
Expanded resource delineation
across STX acreage
2017/18
Production
New source of
affordable gas supply
for east coast domestic
customers
~1 Tcf over 20 years
FID
Initial development
Equivalent to 35%
of NSW gas supply
Current
PEL 96
Appraisal/
Commercialisation
Strike is positioning the Southern Cooper Gas Project as a long-life resource for domestic and export gas supply
Strike Energy Limited - Quarterly Report: June 2015
3
Southern Cooper Basin Gas Project: Quarterly Achievements
Field operations at PEL 96 (STX 66.7%, EWC 33.3%) during the quarter were
focused on improving the performance of the Klebb wells, with enhanced flow
management procedures being implemented and the fracture stimulation of Klebb
2 being completed. Le Chiffre 1 was shut-in for an extended pressure build-up to
determine the average reservoir pressure reduction achieved to date.
At the end of the quarter, Klebb 2 had been fracture stimulated and was awaiting
recompletion, the workover had commenced at Klebb 3 and Klebb 1 was awaiting
conversion to a beam-pump.
During the quarter, DeGolyer and MacNaughton (D&M) completed an independent
review of the historical PEL 96 flow test data and assessed an initial ‘2C’ Contingent
Resource of 155.4 Bcf (103.6 Bcf Net to STX) for the producing zones only in limited
areas around the Le Chiffre 1 and Klebb 1 wells. A small number of contingencies
remain to be satisfied to reclassify this contingent resource estimate to a reserve,
with further testing and the establishment of sustained commercial gas flow rates
from the Patchawarra Vu coals necessary to better define gas and water production
rates and volumes; and the well drainage pattern and spacing. Importantly, the
project already satisfies a range of other typical resource contingencies including
low well costs, gas sales agreements, proximity to pipeline infrastructure and market
pricing. Using actual cost data, D&M also estimated the minimum volume of gas
required to underpin a commercial development or ‘threshold economic field size’
(TEFS) as being 150 Bcf of sales gas (gross).
Le Chiffre Flow Testing
Flow testing operations at Le Chiffre 1 commenced on 8 November 2014. During the
quarter flow test operations continued with sustained gas flows and a cumulative
87,000 bbls of water being recorded prior to shutting-in the well late in April for an
extended pressure-build-up. The purpose of the shut-in was to confirm the decrease
in average reservoir pressure realised to date.
Strike Energy Limited - Quarterly Report: June 2015
The reservoir pressure build-up data combined with nearly four months of flow
test data confirms that a sustained average reservoir pressure reduction has been
achieved at Le Chiffre and that the well is connected to a large reservoir volume. The
sustained decrease in average reservoir pressure confirms that the well is not directly
connected to external aquifers, while the large drainage area means that fewer
wells will likely be required to develop the resource and a high per well ultimate gas
recovery is possible.
Klebb Flow Testing
Flow testing operations at Klebb 1 commenced on 31 October 2014 and a cumulative
five months of flow test data and 60,000 bbls of water had been produced from
the well at the end of the quarter. Gas continued to be measured and flared during
the quarter. Modified well start-up and ramp-up procedures resulted in significant
performance improvements during the quarter, with daily rates consistently above
previous peak rates. Pressure build-up data acquired during the period also confirmed
that a sustained average reservoir pressure reduction has been achieved.
The Klebb 2 well was flow tested intermittently during the period prior to pulling the
completion and fracture stimulating the existing 35m thick Patchawarra Vu Upper.
Pressure data has confirmed that Klebb 2 is in pressure communication with Klebb 1.
Klebb 3 productivity continued to improve during the period, with maximum water
flow in excess of 400 bbls/d being repeatedly achieved and gas production being
initiated and sustained prior to the shut-in for workover and fracture stimulation.
Results from Klebb 3 have confirmed that unstimulated wells can be productive.
Workover and fracture stimulation activities were completed following the end of the
quarter and the well will be returned to flow test in the near future.
The improved productivity of the stimulated Klebb 2 and Klebb 3 wells, in
combination with a revised well completion and pump for Klebb 1, is designed
to shorten the period required to satisfy the resource contingency of sustained
commercial gas flows.
4
Southern Cooper Basin Gas Project: Phase 3 Program Update
Klebb pilot production test schematic
Flow testing of the three Klebb wells over the coming months
is a critical step towards confirmation of the commercial
potential of the SCBGP.
Phase 3 Program Objective
K1
K3
Testing to date has clearly established a direct relationship
between pressure reduction and increased gas flows, but the
relationship between pressure and gas volumes recovered from
coal reservoirs is not linear. While modest pressure reductions
have been achieved to date, we know that more than 50% of
the gas stored by these coals will only be recovered at pressures
in the 500-1,000 psi range (or less than 20-30% of the initial
reservoir pressure).
K2
The objective of the Phase 3 program is therefore to accelerate
reduction of reservoir pressure to maximise the volume of gas
able to desorb from the coal. The Klebb wells are designed to
facilitate a close spaced, confined flow test of the Patchawarra
Vu Upper coal horizon centred on Klebb 1.
Program
The larger fracs now completed at Klebb 2 and 3 are designed
to increase the productivity of these offset wells to compete
with Klebb 1. This will constrain the Klebb 1 drainage volume
allowing a more rapid pressure decline.
Vu Upper (35m seam)
Klebb 3
Klebb 1
Klebb 2
Proppant pumped
104,000 lbs
59,000 lbs
125,800 lbs
Fluid pumped
1,780 bbls
460 bbls
1,803 bbls
PUMP TYPE
Jet
Beam
Jet
FRAC DETAILS
Strike Energy Limited - Quarterly Report: June 2015
Vu Upper frac
Following completion of the workover program, we expect the
combined flow capacity of the Klebb wells to be more than
double the maximum flow rate achieved to date of 800 – 900
bbls water per day. Klebb 1 has also been re-configured for
downhole gas and water separation so that much lower bottom
hole flowing pressures can be maintained.
A controlled flow rate ramp up will be implemented based on
the procedures developed over the last 6 months, which have
proved effective in optimising the long-term productivity of the
formation. Re-commissioning of the Klebb wells and pumps is
scheduled over the coming week.
5
Southern Cooper Basin Gas Project: PEL 96 Commercialisation Strategy
Objective
Funding (1) (2)
Commence Q3 2015
Frac Klebb 2 & 3
Install new pumps at Klebb 1, 2 & 3
Phase 3
Klebb pilot test
Funded (1)
Phase 1
Commence Q4 2015
Objective
Pre-development activities
Funding (1)
Funded (1)
Increased
reserves and
resources
Le Chiffre pilot wells + testing
Continue Klebb pilot production
Phase 4
Phase 2
Infill wells
Commence Q1 2015
Continue testing Le Chiffre 1 and Klebb 1-3
Install new pump at Klebb 1
Understand multi-well pressure drawdown
effects
Dec 2014
Single well tests
Le Chiffre 1 and Klebb 1
Drill and complete Klebb
2 and 3
Demonstration
project
Planning
Objective
Commercial
gas flows
Initial reserves
In progress
Objective
Build gas flows
(in progress)
Objective
Sustained gas flows
Technical feasibility
Commercial feasibility
(1) Funded from existing cash resources
(2) Activities will be refined based on outcomes of Phase 3 planned activity
A disciplined, capital efficient and funded appraisal program is being followed to establish commerciality
Strike Energy Limited - Quarterly Report: June 2015
6
US Operations: Production and Operations Update
US Exploration and Evaluation Activities
The Company continues to hold its interests in the Permian Basin, Eagle Ford Shale and
Eagle Landing Joint Ventures with no exploration and development activity occurring
during the quarter.
EAGLE LANDING JOINT VENTURE
The Company has no plans for further investment in these projects in the near term.
US Production
Strike currently produces oil and gas from three independent assets. Total oil
production for the quarter was 4,166 bbls down 11% on the prior quarter and gas
production was 73,298 Mcf down 2% on the prior quarter.
JUN QTR 2015
MAR QTR 2015
QUARTERLY
CHANGE
Gas (Mcf)
68,073
71,736
(5%)
Oil (Bbl)
1,486
1,306
14%
Total Revenue (USD’000)
258
264
(2%)
PERMIAN BASIN – MB CLEARFORK PROJECT
Gas (Mcf)
4,586
2,392
92%
Oil (Bbl)
1,986
2,669
(26%)
The Eagle Landing Joint Venture (Strike 40% WI) produced 68,073 Mcf of gas and 1,486
bbls of oil net to Strike during the quarter, down 5% for gas and up 14% for oil on the
previous quarter.
Total Revenue (USD’000)
106
138
(23%)
Gas (Mcf)
639
1,016
(37%)
The MB Clearfork Project (Strike 25% WI) produces oil from 20 conventional Permian
Basin wells in Martin County, Texas. During the quarter, the MB Clearfork Project
produced 4,586 Mcf of gas and 1,986 bbls of oil net to Strike, up 92% for gas and down
26% for oil from the previous quarter.*
Oil (Bbl)
694
691
-
Total Revenue (USD’000)
39
34
15%
The Eagle Ford shale project (Strike 27.5% WI) produces oil and gas from the Bigham
1H well in Fayette County, Texas. The well produced 639 Mcf of gas and 694 bbls of
oil net to Strike during the quarter, down 37% for gas and no change for oil on the
previous quarter. The decrease in gas production for the quarter is as a result of the
well’s normal expected decline.
Gas (Mcf)
73,298
75,144
2%
Oil (Bbl)
4,166
4,666
(11%)
Total Revenue (USD’000)
403
436
(8%)
Total Revenue (AUD’000)
531
571
(7%)
EAGLE FORD SHALE – BIGHAM 1H
TOTAL
Based on industry convention energy equivalence 6 Mcf of gas = 1 Bbl of oil
Average realised prices during the quarter were US$50.89/Bbl, up 9% from US$46.72/
Bbl in the previous quarter for oil and US$2.61/Mcf, down 10% from US$2.90/Mcf for
gas in the previous quarter.
*
Gas revenue for the Quarter includes 2,197 Mcf of gas in relation to production in prior quarters
received in the quarter.
Strike Energy Limited - Quarterly Report: June 2015
7
Finance, Commercial and Corporate Update
Corporate Office
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
E: strike@strikeenergy.com.au
W: www.strikeenergy.com.au
During the June quarter the Company continued to advance
a number of its financial and commercial initiatives in
support of the appraisal and accelerated development and
commercialisation of the SCBGP.
•
120B Underwood Street
Paddington NSW 2021
T: +61 2 9397 1420
•
ASX : STX
Securities on Issue
Shares: 833,330,946
Options: 11,700,000
Performance Rights: 28,650,000
Analyst Coverage
Firm
Analyst
Euroz
Michael Skinner
Ord Minnett
John Young
Bell Potter
Peter Arden
The Company continues to advance its planning for an initial
development project within PEL 96. During the quarter,
work has continued to scope and assess the feasibility of
a demonstration scale modular gas processing facility that
will be designed to process, compress and deliver sales
gas produced from the multi-well testing program into the
Moomba to Adelaide pipeline. Discussions to date continue
to yield significant interest and support from engineering
groups and equipment suppliers.
•
Discussions with commercial and industrial gas users
regarding further offtake are ongoing. These discussions
continue as part of the Company’s strategic planning
initiatives and in response to the successful achievement of
all of the key objectives for the current appraisal program
with the SCBGP.
•
The Company accessed the remaining tranche of funding
under the terms of the previously announced $5.9 million
R&D Financing facility with Macquarie Bank (the Macquarie
Facility). The Macquarie Facility is collateralised in full by the
proceeds of the Company’s 2015 ATO R&D refund which
is expected to be received by November 2015, at which
time the facility will be repaid in full. Based on eligible R&D
activities undertaken during the FY15 year, the Company
estimates that a rebate in excess of $8.2 million will be
received.
•
The Company completed the quarter with $11.7 million cash
on hand and together with the forecast net proceeds from
the R&D refund, the Company is well placed to continue its’
field operations and demonstration scale processing facility
planning and preliminary design.
Key highlights include:
Registered Office
Securities Exchange
•
•
As outlined in the Company’s ASX announcement on 27
April 2015 and following the completion of the Independent
Review by DeGolyer and MacNaughton (Independent
Review), the notice for the final tranche of prepayment
funding under the terms of the 45PJ Orora Gas Sales
Agreement was issued. On 6 May 2015, the Company
received the final tranche of prepayment funding from
Orora.
On 27 April 2015, Orica was provided with a copy of the
Independent Review and also notified that the 30 day period
to elect to make their first gas pre-payment under their
250PJ Gas Sales Agreement had commenced. As outlined
in the Company’s ASX announcement on 27 May 2015, the
Company received notification from Orica that it had elected
to make the first pre-payment of $7.5 million under the
terms of the Orica GSA. These funds were received by the
Company on 27 May 2015.
In connection with the above notification, Orica elected
to not exercise the Orica Option, (which was approved by
Shareholders at a General Meeting of the Company on 28
May 2014) which would have enabled Orica to subscribe
for up to 20.833 million new shares in the Company at a
minimum price of $0.12 per share for a payment of $2.5
million. As a result, the Orica Option lapsed on 27 May 2015.
Strike Energy Limited - Quarterly Report: June 2015
8
Southern Cooper Basin Gas Project: Asset summary
Moomba
Prospective
Resource
PEL 96
4,492 Bcf*
PEL 96 Phase
One Area
1,123Bcf*
2C
Marsden 1
104 Bcf
Davenport 1
PEL 94
STX 35%
PEL 95
STX 50%
Mount Isa
Gladstone
Le Chiffre 1
Klebb production
testing area
Moomba
PELA 640
STX 100%
Brisbane
PEL 96
STX 66.67%
0
20
Sydney
Adelaide
Kilometers
PEL 96 Phase One Area
Strike Phase One Area wells drilled
Gas Pipeline
Strike Wells Drilled
Oil Pipeline
PEL 96 Offset Wells
Strzelecki Track
PEL 96 and PELA - STX Operated
Hobart
* Mean estimate (net to Strike determined on a probalistic basis) per ASX announcement dated 19 Feb 2014 and adjusted for
announced contingent resource estimate per ASX announcement dated 27 April 2015.
PEL
Net STX Acres
PEL 94
77,925
PEL 95
160,248
PEL 96
443,880
** The estimated quantities of petroleum that may potentially be recovered by the application of a future develpment project relate to
PELA 640
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Futher exploration
appraisal and evaluation is required to determine the existence of a significant quanity of potentially moveable hydrocarbons.
Total
850,786
1,532,839
Strike has an ideally positioned long-life multi-Tcf resource to supply into ~40 Tcf Eastern Australian gas demand over the next twenty years
Strike Energy Limited - Quarterly Report: June 2015
9
Important Notice
This presentation does not constitute an offer, invitation or recommendation to subscribe for,
or purchase any security and neither this presentation nor anything contained in it shall form
the basis of any contract or commitment.
Reliance should not be placed on the information or opinions contained in this presentation.
This presentation does not take into consideration the investment objectives, financial
situation or particular needs of any particular investor. Any decision to purchase or subscribe
for any shares in Strike Energy Limited should only be made after making independent
enquiries and seeking appropriate financial advice.
No representation or warranty, express or implied, is made as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, Strike Energy Limited and its affiliates
and related bodies corporate, and their respective officers, directors, employees and agents
disclaim liability (including without limitation, any liability arising from fault or negligence) for
any loss arising from any use of or reliance on this presentation or its contents or otherwise
arising in connection with it.
Contingent Resource Estimate
DeGolyer and MacNaughton was engaged by Strike to undertake an Independent Review of
the gas resource in PEL 96 based on the data and information acquired to date by Strike from
the drilling and flow testing programs carried out at the Le Chiffre 1 and Klebb 1, Klebb 2 and
Klebb 3 wells.
DeGolyer and MacNaughton has estimated a contingent gas resource on a probalistic basis for
the initial zones that have been flow tested within the Le Chiffre 1 and Klebb 1 wells. As these
zones only represent a portion of the net coal encountered at these locations, successful flow
testing of additional zones will enable an increased contingent resource to be booked.
The table below summarises the Contingent Resource Estimates.
Contingent Gas Resource Estimates - PEL 961
Well
1C2
2C2
3C2
Statements contained in this presentation, including but not limited to those regarding the
possible or assumed future costs, performance, dividends, returns, production levels or
rates, oil and gas prices, reserves, potential growth of Strike Energy Limited, industry growth
or other projections and any estimated company earnings are or may be forward looking
statements.
Productive area (acres)
2,171
2,938
3,931
Le Chiffre 1 - Patchawarra Vu
Upper and Vu Lower zones (bcf)
62.9
93.2
132.4
Klebb 1 - Patchawarra Vu Upper
zone 9 (bcf)
42.1
62.2
93.3
Such statements relate to future events and expectations and as such involve known and
unknown risk and uncertainties, many of which are outside the control of Strike Energy
Limited. Actual results, actions and developments may differ materially from those expressed
or implied by the statements in this presentation.
Total Gross Contingent Resource
(bcf)
105.00
155.4
225.7
1.
Subject to any continuing obligations under applicable law and the Listing Rules of ASX
Limited, Strike Energy Limited does not undertake any obligation to publicly update or
revise any of the forward looking statements in this presentation or any changes in events,
conditions or circumstances on which any such statement is based.
Contingent Resource Estimates have been prepared in accordance with the Petroleum
Resources Management System “PRMS”. Contingent Resource Estimates are those
quantities of gas (produced gas less carbon dioxide and fuel gas) that are recoverable
from known accumulations but which are not yet considered commercially recoverable.
2.
1C, 2C and 3C estimates in this table are P90, P50 and P10 respectively for each well and
have been summed arithmetically
3.
Net to Strike’s 66.7% interest in PEL 96
Strike Energy Limited - Quarterly Report: June 2015
10
Important Notice: continued
Competent Persons Statement
The information in this presentation that relates to the PEL 96 contingent resources estimate
has been taken from the independent reports as prepared by DeGolyer and MacNaughton,
a leading independent international petroleum industry consultancy firm, and has been
reviewed by Mr Chris Thompson (Chief Operating Officer of the Company). All other reported
resource and or reserves information in this presentation is based on, and fairly represents,
information prepared by, or under the supervision of Mr Thompson.
Mr Thompson holds a Graduate Diploma in Reservoir Evaluation and Management and
Bachelor of Science Degree in Geology. He is a member of the Society of Petroleum Engineers
and has worked in the petroleum industry as a practicing reservoir engineer for over 20 years.
Mr Thompson is a qualified petroleum reserves and resources evaluator within the meaning
of the ASX Listing Rules and consents to the inclusion in this release of the resource and or
reserves information in the form and context in which that information is presented.
About DeGolyer and MacNaughton
The information contained in this release pertaining to the PEL 96 contingent resources
estimate is based on, and fairly represents, information prepared under the supervision of Mr
Paul Szatkowski, Senior Vice President of DeGolyer and MacNaughton. Mr Szatkowski holds
a Bachelor of Science degree in Petroleum Engineering from Texas A&M, has in excess of 40
years of relevant experience in the estimation of reserves and contingent resources, and is a
member of the International Society of Petroleum Engineers and the American Association of
Petroleum Geologists. Mr Szatkowski is a qualified petroleum reserves and resources evaluator
within the meaning of the ASX Listing Rules and consents to the inclusion of the contingent
resource estimate related information in the form and context in which that information is
presented.
Strike Energy Limited - Quarterly Report: June 2015
11
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
STRIKE ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
59 078 012 745
30 June 2015
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
Receipts from product sales and related debtors (1)
Payments for (a) exploration & evaluation
(b) development
(c) production (2)
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (3)
10,765
(3,410)
‐
(312)
(1,710)
‐
‐
‐
‐
‐
281
13,811
(21,651)
(71)
(2,411)
(4,534)
‐
‐
‐
‐
‐
6,787
Net operating cash flows
5,614
(8,069)
‐
‐
(7)
‐
‐
(11)
‐
‐
‐
‐
‐
‐
5,032
‐
‐
‐
‐
‐
(7)
5,021
5,607
(3,048)
Cash flows related to operating activities
1.1
1.2
1.3
1.4
1.5
1.6
1.7
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects (4)
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
(1) Receipts from product sales include prepayment amounts received under the terms of the Groups various off take arrangements.
(2) Production payments include prepayments made for gas transmission rights for the Groups US assets.
(3) Other for YTD includes the receipt of $ 5.8 million from the ATO relating to the FY14 R&D return.
(4) As announced on 11 July 2014 the Group entered into a Purchase and Sale Agreement with Penn Virginia Oil & Gas to sell 1,617 of its net
acres in Lavaca County Texas (USA). Proceeds of US$ 4.6 million were initially received on 29 August 2014 with a second completion
payment being received on 7 November 2014.
+ See chapter 19 for defined terms.
17/12/2010
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
5,607
(3,048)
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Proceeds from issues of shares, options (net of costs)
Proceeds from sale of forfeited shares
Proceeds from borrowings (2)
Repayment of borrowings
Dividends paid
Other:
a. Interest and other cost of financing paid
b. Interest & other items of a similar nature received
‐
‐
800
(255)
‐
‐
‐
5,872
(1,043)
‐
(325)
26
(1,048)
202
Net financing cash flows
246
3,983
Net increase in cash held
5,853
935
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
5,809
32
10,624
135
1.22
Cash at end of quarter
11,694
11,694
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2 (a)
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
278
‐
Explanation necessary for an understanding of the transactions
(a) In addition to the respective salary and fee payments made to Directors, during the quarter the Group also made payments to:
‐ M H Carnegie & Co Pty Ltd (a director related entity via Mr M Carnegie) under the terms of an office leasing agreement ($28,807).
‐ Mr D Baker for consulting services for the period from March to June 2015 ($63,800).
‐ Rowe Strategic Management Group Pty Ltd (a director related entity via Ms J Rowe) for procurement consulting costs ($3,825).
Non‐cash financing and i