SPP Offer Booklet
Released
Released
Announcement PDF
SHARE PURCHASE PLAN
OFFER BOOKLET
Strike Energy Limited ABN 59 078 012 745
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Offer Booklet requires your immediate attention. It is an important document which is accompanied by a
personalised Entitlement and Acceptance Form and both should be read in their entirety. This document is not a
prospectus under the Corporations Act and has not been lodged with the Australian Securities and Investments
Commission.
These materials do not constitute an offer to sell, or a solicitation of an offer to buy, any Shares in the United
States. The Shares to be offered and sold under the SPP offer have not been, and will not be, registered under the
United States Securities Act of 1933 (the U.S. Securities Act) or the securities laws of any state or other jurisdiction
of the United States, and therefore will only be offered and sold to Eligible Shareholders in Australia or New
Zealand in “offshore transactions” (as defined in Rule 902(h) under the U.S. Securities Act) in reliance on
Regulation S under the U.S. Securities Act.
LETTER FROM THE CHAIRMAN AND MANAGING DIRECTOR
24 October 2018
Dear Shareholder
On behalf of the Board of Strike Energy Limited (Strike Energy), we are pleased to offer you the opportunity to
participate in the Share Purchase Plan (SPP).
The offer
The SPP is offered exclusively to all Eligible Shareholders, being registered holders as at 7.00 pm (Sydney time) on
23 October 2018 (Record Date) with a registered address in Australia or New Zealand. Excluded Shareholders (as
defined in the Terms and Conditions) will not be invited to participate in the SPP.
The SPP provides Eligible Shareholders with an opportunity to contribute $2,500, $5,000, $10,000, $15,000 or
another amount of your choosing, not less than $2,500 and not greater than $15,000, in applying for new Shares.
The SPP aims to raise approximately $5 million and is not underwritten. Strike Energy may determine to raise a
higher amount or decide to scale back applications under the SPP at its absolute discretion.
Strike Energy recently conducted a placement of approximately 113,043,500 Shares to institutional and
professional investors at $0.115 (11.5 cents) per Share, raising approximately $13 million (before costs and
expenses) (Placement). Funds raised from the Placement and the SPP will be used to support drilling of the West
Erregulla-2 well at the West Erregulla Project, the piloting activities of the Jaws wells at the Southern Cooper Basin
Gas Project and to provide general working capital.
Strike Energy also recently announced an off-market takeover bid for Perth Basin explorer, UIL Energy Limited (UIL
Energy Takeover). If the UIL Energy Takeover is successful and sufficient funds are raised under the Placement and
SPP, Strike Energy will also apply funds towards progression of UIL Energy’s work commitments in respect of its
Perth Basin permits. It is important to note that neither the Placement nor the SPP is conditional on the UIL Energy
Takeover.
Further details of the Placement, UIL Energy Takeover and the use of proceeds are set out in the capital raising
announcement and investor presentation (Investor Presentation) and the bidder’s statement in respect of the UIL
Energy Takeover, each of which were released to ASX by Strike Energy on 24 October 2018. Shareholders are
encouraged to read these documents carefully together with the information in this booklet (in particular the
summary of key risks detailed on pages 8 to 13 of this Offer Booklet).
The issue price
The Issue Price of Shares under the SPP is $0.115 (11.5 cents) per Share (Issue Price), which is equal to the issue
price under the Placement and which represents a 19.8% discount to the 5 day volume weighted price of Shares
over the period up to 19 October 2018 (being the last trading day prior to the announcement of the Placement and
SPP).
The SPP is not underwritten. Strike Energy reserves the right to increase the size of the SPP or scale back
applications under the SPP at its absolute discretion. If Strike Energy scales back applications, you may be
allocated fewer Shares than the Parcel of Shares for which you applied, and you will be refunded the difference in
the Application amount (without interest payable on funds prior to your refund). If total subscriptions for Shares
under the SPP are less than the targeted $5 million, Strike Energy may seek to place the shortfall to placees
identified by it at a price not less than the Issue Price.
Participation in the SPP is entirely voluntary. All Shares issued under the SPP will rank equally with existing Shares
and will carry the same voting rights and entitlement to receive distributions.
No brokerage, commissions or other transaction costs apply to purchases under the SPP.
1
Strike Energy Share Purchase Plan
How to accept this offer
To apply for Shares under the SPP, please follow the instructions on the enclosed personalised Application Form.
This letter and its attachments set out the details and Terms and Conditions of the SPP. We encourage you to read
the enclosed material and seek your own financial and tax advice in relation to the offer before you decide
whether to participate.
The SPP opens at 9.00 am (Sydney time) on 24 October 2018 and will close at 5.00 pm (Sydney time) on 16
November 2018.
On behalf of the Board of Strike Energy, we invite you to consider participation in the SPP.
Yours sincerely
John Poynton AO
Chairman
Stuart Nicholls
Managing Director
Strike Energy Share Purchase Plan
2
KEY DATES
Date (and time if relevant)
Event
7.00 pm (Sydney time)
23 October 2018
Record Date
The date and time on which Strike
Energy determined Eligible
Shareholders.
9.00 am (Sydney time)
24 October 2018
Opening Date
SPP opens.
16 November 2018
Closing Date
SPP closes. Applications must be
received by 5.00 pm (Sydney time).
23 November 2018
Scale Back Date
The date on which any Scale Back is
announced.
26 November 2018
Issue Date and
Allotment Date
Shares will be issued and allotted on
this date.
27 November 2018
Trading Date
Trading of Shares allotted under the
SPP is expected to commence on
ASX.
27 November 2018
Despatch Date
Transaction confirmations will be
despatched to Shareholders.
This timetable is indicative only and Strike Energy may, at its discretion, vary any of the above dates by sending a revised
timetable to the ASX. All times are Sydney time.
3
Strike Energy Share Purchase Plan
QUESTIONS AND ANSWERS
1. What is the SPP?
The SPP is an opportunity for Eligible Shareholders to purchase
additional Shares without brokerage, commissions or other
transaction costs.
All Shares issued to you under the SPP will rank equally with your
existing fully paid Shares and will carry the same voting rights and
entitlements to receive distributions.
2. Who may participate in the SPP?
You may participate in the SPP if you are an Eligible Shareholder.
You are an Eligible Shareholder if you are a registered holder of
Shares on the Record Date with a registered address in:
Australia; or
New Zealand,
unless you are an Excluded Shareholder. Certain Eligible
Shareholders who are custodians holding Shares on behalf of
certain beneficiaries are also able to participate in the SPP in
accordance with the Terms and Conditions.
An Excluded Shareholder is any:
person who holds Shares (either for their own account or
the account of another person) who resides outside
Australia or New Zealand; or
holder of Shares who is, or is acting for the account or
benefit of, a person in the United States.
Each custodian, trustee or nominee must not distribute any
documents relating to the SPP to any person in the United States
and must not submit an Application or make payment by BPAY® or
otherwise for Shares for any person for whose account or benefit
it acts that is an Excluded Shareholder.
3. Do I have to participate in the SPP?
No. Participation in the SPP is entirely voluntary.
If you do not wish to participate in the SPP, no action is required
on your part.
Before you apply for Shares, Strike Energy recommends you seek
independent financial and tax advice from your stockbroker,
accountant or other professional advisor, and you monitor the
price of Shares (which is quoted in the financial pages of the major
metropolitan newspapers and on the ASX website). This Offer
Booklet does not purport to contain all of the information that
you need to make an investment decision.
4. Are there any risks in participating in
the SPP?
If you participate in the SPP, you will acquire additional Shares.
There are risks associated with holding Shares and participating in
the SPP which are summarised on pages 8 to 13 immediately
below. In deciding whether or not to participate in the SPP, you
should carefully consider these risks.
Strike Energy Share Purchase Plan
4
5. What is the Issue Price of the Shares
under the SPP?
The Issue Price of Shares under the SPP will be $0.115 (11.5 cents)
per Share, which is equal to the issue price under the Placement
and which represents a 19.8% discount to the 5 day volume
weighted price of Shares over the period up to 19 October 2018
(being the last trading day prior to the announcement of the
Placement and SPP).
The Issue Price may differ from the market price of Shares on the
day Shares are issued or allotted to you.
The market price or value of Shares is subject to market volatility.
It may be higher or lower, at any time, than the Issue Price of the
Shares you receive. The market price may change between the
date of this offer and the date when Shares are issued or allotted
to you under the SPP.
6. How many Shares can I apply for
under the SPP?
If you are an Eligible Shareholder, you are entitled to contribute:
$2,500, $5,000, $10,000 or $15,000; or
an amount of your choosing, not less than $2,500 and not
greater than $15,000 (Nominated Subscription),
in applying for new Shares, regardless of the number of Shares
you currently hold. These amounts may be subject to any Scale
Back.
If you receive more than one copy of this Offer Booklet, or if you
hold Shares in more than one capacity (e.g. because you are both
a sole and joint holder of Shares), the maximum amount you may
apply to invest under the SPP in all capacities, and in aggregate, is
$15,000. By applying to purchase Shares under the SPP, you
certify you have not exceeded this $15,000 limit.
If the Issue Price cannot be divided into your Nominated
Subscription, to give a whole number of Shares, there will be a
rounding down of the number of Shares. By applying to purchase
Shares under the SPP, you acknowledge that any remaining
balance of your payment will be donated to a registered charity of
Strike Energy’s choosing. You will not receive a refund for this
amount, which will always be less than the Issue Price of one
Share.
7. Can I transfer my offer to a third
party?
No. Your rights under this offer are personal to you and nonrenounceable, so you may not transfer them.
8. What will happen if the SPP is
oversubscribed?
The SPP aims to raise approximately $5 million. Strike Energy may
decide to accept applications (in whole or in part) that result in
the SPP raising more or less than this amount in its absolute
discretion.
Strike Energy may, at its absolute discretion, scale back the
number of Shares that will be allotted to individual Shareholders
under this SPP. If this happens you may be allocated Shares to a
value which is less than the value of Shares that you applied for
and the difference will be refunded to you.
5
Strike Energy Share Purchase Plan
9. How do I apply for Shares under the
SPP?
If you wish to participate in the SPP, you can apply for Shares in
the following ways:
Apply for Shares by making a payment of $2,500, $5,000,
$10,000, $15,000, or your Nominated Subscription using
the BPAY® facility provided by your bank as per the
instructions in the Application Form. If you make a
payment by BPAY®, you will be deemed to have completed
an Application Form accepting Shares to the value of
$2,500, $5,000, $10,000, $15,000 or your Nominated
Subscription. You do not need to return the Application
Form if paying by BPAY®; or
Follow the instructions set out in the enclosed Application
Form. Send your completed Application Form with your
cheque, bank draft or money order drawn on an Australian
branch of a financial institution in Australian currency,
made payable to “Strike Energy SPP Offer” and crossed
“Not Negotiable” to Boardroom Pty Limited in the enclosed
reply paid envelope.
You will not be able to withdraw or revoke your Application once
you have made a payment by BPAY® or sent us the completed
Application Form.
10. Can I apply for Shares under the SPP
if my Shares are held by a custodian,
trustee or nominee?
If you are expressly noted on Strike Energy’s share register as the
named beneficiary of Shares held by a custodian, trustee or
nominee, and you reside in Australia or New Zealand, you will be
eligible to participate in the SPP.
11. How long is the SPP offer open for?
The SPP opens at 9.00 am (Sydney time) on 24 October 2018 and
closes at 5.00 pm (Sydney time) on 16 November 2018.
If you want to participate you should ensure that Boardroom Pty
Limited receives payment in cleared funds by no later than 5.00
pm (Sydney time) on 16 November 2018 (the Closing Date for
the SPP).
12. Do I have a guaranteed allocation of
Shares under the SPP?
13. What is the market price of Shares?
No.
Strike Energy reserves the right (in its absolute discretion) to:
increase the size of the SPP. If this happens, you will be
allocated the Parcel of Shares for which you applied
(subject to any rounding, as detailed in the response to
question 5 above); or
scale back applications under the SPP. If this happens, you
may be allocated fewer Shares than the Parcel of Shares for
which you applied, and you will be refunded the difference
in the application amount (without interest payable on
funds prior to your refund).
The market price of Shares can be obtained from the ASX website
by searching for “Strike Energy Limited” in the prices search
screen.
Strike Energy Share Purchase Plan
6
14. Taxation
You should consult your own taxation advisor about the tax status
of your investment in Shares.
15. Further questions?
If you have any questions in relation to the SPP please call your
stockbroker, accountant or other professional advisor. If you
require information on how to complete the Application Form
please contact the Registry on 1300 737 760 from within Australia
or (+61) 2 9290 9600 from outside Australia between 8.15am and
5.30pm (Sydney time), Monday to Friday while the offer remains
open
7
Strike Energy Share Purchase Plan
effect on the financial performance of the Strike
Energy Group.
KEY RISKS
There are a number of general and specific risks which
may affect the future operating and financial
performance and financial position of Strike Energy
along with the trading price of the Shares and
dividends paid on them in the future. Where possible,
Strike Energy will seek to minimise its exposure to, and
mitigate the effects of, the risks outlined below.
However, certain risks relate to matters that are
outside the control of Strike Energy, and there can be
no assurance that any steps that Strike Energy takes
will successfully protect it from any particular risk.
1.2
The business activities of the Strike Energy
Group are subject to extensive laws and
regulations which govern the undertaking of oil
and gas exploration, development and
production (and associated activities) in
Australia. Any material change to the law,
regulation of government policy or their
interpretation or administration by relevant
courts and authorities (including changes to
fiscal or tax matters, industrial relations, field
developments, restrictions on operations (i.e.
noise, dust and water or specific techniques) in
Australia may have a material adverse impact on
the financial performance and financial position
of the Strike Energy Group.
This section sets out some key risks associated with:
Strike Energy and its existing business;
the UIL Energy Takeover;
general risks relating to the trading price of Shares;
and
1.3
participation in the SPP.
1.
Key risks associated with Strike Energy and its
existing business
1.1
General economic conditions
The economic condition of both domestic and
global markets may affect the performance of
oil and gas exploration companies such as Strike
Energy. Adverse changes in macroeconomic
conditions, including global, regional and local
economic growth, the costs and general
availability of credit, the level of inflation,
interest rates, exchange rates, government
policy (including fiscal, monetary and regulatory
policies), general consumption and consumer
spending, sentiment and levels of employment,
amongst others, are outside of the control of
Strike Energy and may have a material adverse
Competition
Strike Energy operates in a competitive market
which includes major oil and gas companies.
Many of these companies have greater financial
strength and resources available to them than
Strike Energy and, as a result, may be in a better
position than Strike Energy to compete for
future business opportunities. Any increased
competition to the businesses of Strike Energy
may have an adverse effect on its financial
performance.
The risks identified in this section are risks associated
with an investment in Shares but are not an exhaustive
list of all risks associated with such an investment. As a
Shareholder, you will continue to be exposed to the
risks outlined below, however, acquiring additional
Shares under the SPP may increase your exposure.
There may also be additional risks and uncertainties
not currently known which may have an adverse effect
on Strike Energy’s business and the value of the Shares.
The risks identified in this section do not take into
account the investment objectives, financial situation,
tax position or other circumstances of any particular
Shareholder. Shareholders should have regard to their
own investment objectives and financial circumstances
and seek professional advice from their legal, financial
or other independent adviser before determining
whether or not to participate in the SPP.
Changes in law, regulation or government
policy
1.4
Operational risk
Strike Energy is exposed to a variety of industry
operational risks including fire, explosions, blow
outs, pipe failures, abnormally pressured
formations, environmental hazards, limitations
on activities due to seasonal weather conditions,
unanticipated operational and technical
difficulties, mechanical failure of operational
plant and equipment, industrial and
environmental accidents, industrial disputes,
riots, other force majeure events and
unexpected shortages or increases in the costs
of labour, consumables or plant and equipment.
The occurrence of any such event may have
direct adverse consequences for the financial
performance, financial position and prospects of
Strike Energy. Any such event may also result in
legal proceedings being instituted against Strike
Energy and substantial losses to Strike Energy
due to injury or loss of life, damage to or
destruction of property, natural resource or
equipment, pollution or other environmental
damage, remediation responsibilities, regulatory
investigations and penalties or suspension of
operations. Damage occurring to other third
parties as a result of such risks may also give rise
Strike Energy Share Purchase Plan
8
to claims against Strike Energy. Strike Energy
may also become subject to liability for
accidents, pollution or other hazards against
which it cannot insure or against which it may
elect not to insure because of premium costs or
for other reasons, or in amounts which exceed
policy limits. The occurrence of any of these
risks or events could also damage the reputation
of Strike Energy which may have additional
adverse consequences on its financial
performance.
1.5
Resources estimates
Resources estimates are expressions of
judgement based on knowledge, experience and
industry practice. The estimation of
hydrocarbon resources is not precise and is
subject to significant uncertainty associated with
hydrocarbon reservoir geology and the
interpretation of seismic and well data, as well
as assumptions regarding recovery factors,
future commodity prices and development and
operating costs. There can be no guarantee that
Strike Energy will successfully produce the
volume of hydrocarbons estimated to be
included in its resources. Estimates, while valid
when made, may change significantly or become
uncertain when new information becomes
available through additional fieldwork or
analysis. As estimates change, appraisal,
development and production plans may be
altered in a way that may adversely impact on
the financial performance of Strike Energy.
1.6
Environment
Oil and gas exploration, development and
production can potentially be environmentally
9
1.8
Strike Energy Share Purchase Plan
Joint venture activities
As is common in the oil and gas industry, Strike
Energy participates in several joint venture
arrangements and many of its assets are held, or
may in the future be held, in joint ventures.
With some exceptions, decisions regarding the
exploration, development and production
activities of joint ventures require approval of a
specific majority of participants in the joint
venture.
Whether or not Strike Energy holds majority
interests or acts as the operator of the relevant
joint ventures, joint venture participants may:
Exploration
Oil and gas exploration inherently involves
significant risks, so that no assurances can be
given that funds spent on exploration will result
in discoveries that will eventually become
commercially viable. As such, the profitability of
Strike Energy and the value of the Shares are
directly related to the results of exploration
activities which are currently being undertaken
by Strike Energy. The future operating and
financial performance and development
strategies of the Strike Energy Group will be
heavily influenced by the performance or subperformance of Strike Energy’s current activities,
including the piloting outcome of Jaws-I and
exploration success of the West Erregulla
Project, as well as the ability of the Strike Energy
Group to successfully explore for and identify
further hydrocarbon resources and
commercially viable reserves which may support
production in the future.
1.7
hazardous, giving rise to substantial costs for
environmental rehabilitation, damage control
and losses. Strike Energy is subject to
environmental laws and regulations in
connections with their operations. If Strike
Energy is responsible for environmental harm it
will be required to remediate the harm which
may involve substantial expenditure.
Additionally, a material environmental incident
may result in operations being suspended,
forfeiture of a critical permit or permits, the
imposition of a financial guarantee, surety,
financial penalty or compensation order, as well
as damage to Strike Energy’s reputation.
(a)
have commercial or other interests or
objectives for the relevant joint venture
which may not be aligned with those
Strike Energy;
(b)
exercise voting rights for joint venture
decisions to prevent or delay activity
which Strike Energy considers to be in the
best interests of the joint venture and the
commercial objectives of Strike Energy;
or
(c)
be unable or unwilling to fulfil their
respective obligations, including their
proportionate share of joint venture
capital and operating costs in which case
Strike Energy may have to make the
increased contribution to ensure that
programmes proceed.
1.9
Where joint venture activities are not operated
by Strike Energy, it will monitor the performance
of the operator and may seek to influence joint
venture activities by providing technical advice,
but it has limited ability to control the day to day
conduct of the activities of the joint venture.
1.10
Security of tenure
The business activities of Strike Energy are
dependent on the grant and maintenance of
appropriate licences, permits and consents over
their exploration interests. Licences and permits
may be subject to compulsory work or
expenditure obligations for each year which
must be met to keep the licence or permit in
good standing. Any failure to meet tenure
conditions may result in a loss of tenure and
may impact on Strike Energy’s reputation which,
in turn, may hinder or prevent it from
successfully obtaining extensions to its existing
tenure or new tenure associated with future
opportunities.
1.11
land within the Strike Energy Group’s licence
and permit areas cannot in all cases be
guaranteed as it may be required to obtain the
consent of the owners and occupiers of the
relevant land or surrounding land.
Compensation may be required to be paid to the
owners and occupiers by the Strike Energy
Group in order for it to carry out exploration
activities.
In addition, Strike Energy operates in a number
of areas within Australia that are or may
become subject to claims or applications for
native title determinations. These claims and
applications have the potential to introduce
delays in the granting of petroleum licences and
other permits and consequently to have an
effect on the timing and cost of exploration,
development and production licences, as well as
in respect of such operating costs associated
with such licences.
Access to funding
Substantial capital expenditure is required for oil
and gas exploration, appraisal, development and
production. The future prospects of the Strike
Energy Group, including the successful
development of its assets and/or the acquisition
of new assets will be influenced by the ability of
Strike Energy to access funding via operating
cash flows or debt or equity markets on
commercially acceptable terms. Operating cash
flows and access to debt and equity markets is
affected by a number of factors beyond the
control of Strike Energy including commodity
prices and general economic conditions.
Various aspects of the Strike Energy Group’s
future performance and profitability are
dependent on the outcome of future
negotiations with third parties. In addition to
the outcome of negotiations on land access
arrangements and native title issues, future
negotiation with the government is expected in
respect of licence renewals and work obligations
and security for rehabilitation of areas of
operation with the Strike Energy Group’s
tenements.
The funds raised under the Placement and
through the SPP, even if fully subscribed, may
not be sufficient to successfully achieve all the
objectives of Strike Energy’s business strategy.
There is also no assurance that Strike Energy will
be successful in raising the targeted amount
under the SPP, or additional capital in the future
as and when it is required, in order to fully
finance and develop its projects. Volatile
market conditions may prevent or make it
difficult for Strike Energy to obtain debt
financing or equity financing on commercially
acceptable terms. Any additional equity
financing may be dilutive to Strike Energy’s
existing shareholders and any debt financing, if
available, may involve restrictive covenants
which limit the Strike Energy Group’s operations
and business strategy.
If access to adequate funding is not maintained
by Strike Energy, Strike Energy may not be able
to take advantage of opportunities or otherwise
respond to market conditions. Failure to obtain
funding on a timely basis and on reasonably
acceptable terms may also cause Strike Energy
to postpone or abandon development plans, or
to relinquish or forfeit rights in relation to its
assets, which may delay or suspend its business
strategy and could have a material adverse
effect on its activities.
1.12
Land access and Native Title risk
Land access is critical to the operations of Strike
Energy. Immediate and continuing access to
1.13
Contractors
The business activities of Strike Energy rely on
the engagement of experienced and qualified
contractors and suppliers on commercially
reasonable terms.
Strike Energy’s business, operations and
financial performance may be materially and
adversely affected if any of its proposed
contractors are not available as and when
required or do not perform their contractual
obligations as expected by Strike Energy. Where
Strike Energy relies on third parties to deliver
goods or perform services, there can be no
guarantee that the relevant third parties will
deliver those goods or perform those services in
the manner that delivers upon Strike Energy’s
plans and expected outcomes which, in turn,
may adversely affect Strike Energy’s financial
position, performance and prospects.
1.14
Insurances
Strike Energy maintains insurance either directly
or through a joint venture for certain activities
within ranges of coverage that they each believe
to be consistent with industry practice.
However, in certain circumstances insurance
Strike Energy Share Purchase Plan
10
proceeds may not be adequate to cover all
potential liabilities and losses. Additionally,
recovery under insurances is subject to the
terms and conditions of the relevant insurance
policies which may include material exclusions
and uninsured excess amounts (or deductibles).
Where Strike Energy does not have insurances in
place in respect of a relevant loss or hazard, or a
relevant insurance policy does not respond as
anticipated, it may be exposed to material
uninsured losses which, in turn, may impact
upon its financial performance. In addition,
insurance of all risks associated with oil and gas
exploration, development and production is not
always available and, where, available this cost
can be prohibitive. There is a risk that insurance
premiums may increase to a level where Strike
En